BUDGET PROPOSAL
STAIR HALL AND MASTER BATH TUB ALCOVE
PRIVATE RESIDENCE
9 EAST 71 STREET
NEW YORK. NY
SUBMITTED TO:
ATLANTIC STATE CONSULTANTS. LLC
ALBERTO PINTO INTERIOR DESIGN
April 12. 2018
TACONICTBUILDERS
NEW YORK • LOS ANGELES • EAST HAMPTON • LONDON • SANTA BARBARA • CONNECTICUT
EFTA00796256
( 11 ( ( \ ll .\
Summary
Qualifications and Notes
Breakdown by Trade
Drawing Log
TACONICTBUILDERS
Nov YORK • LOS ANGELES • EAST NAIIPTON • LONDON • SANTA BARBARA • CONNECTICUT
EFTA00796257
TACONIC1rBUILDERS
BUDGET PROPOSAL
Summary
Stair Hall Painting & Master Tub Alcove
9 West 71st Street
New York, NY
Cabinet Alberto Pinto
April 12, 2018
01-000 General Conditions 69,755
02-200 Site Maintenance 68,530
02-990 Selective Demolition 5,130
06-100 Rough Carpentry 3,600
09-300 Stone 14,400
09.900 Painting & Skim Coating 114,990
09.905 Gold Leaf / Gilding Allowance 42,600
14-800 Scaffolding 17,529
15.200 Plumbing 4,500
15-400 Plumbing Fixtures & Bath Accessories 21,343
16-200 Electrical 4,250
Construction Sub-Total: $ 366,627
Overhead & Fee: 13.5% 40,406
Insurance: 2.5% 10,403
Total Cost: 426,625
Summary - Page 1 of I
EFTA00796258
T A (' N; I f' it R L I I nr It 4
BUDGET PROPOSAL
Bid Qi Ilkations and Exoluelons
Stair Han Paintrg 8 Master Tub Alcove
9 West 71st Street
New York. NY
Cabinet Alberto Pinto
April 12. 2018
fludgatOnsumeolabo:
Our Proposal is based on the following Drenvings and Correspondence received from:
Cabinet Alberto Pinto
Site walk through held on Monday April 9th at 10:00 am.
Email Correspondence From Lionel Vilette on 419/18 re: tub
Schedule:
Scheduled Project Duration is based on substantial completion and does not include punch list cr changes to scope as established in the dravnngs and
specifications.
Proiact Duration: 2 Months
EttadAala: TBD
Coma: TBD
09-905 Gold Leaf/ Alkiwance
We are carrying an allowance to provide antique gildog over the existing gold. This scope of work is an allowance
342.600
pending approval of sample.
15-400 Plumbing Fixtures
We are carrying an allowance of $10.000 to provide the bathtub in the Master Alcove pending confirmation of cost
$10.000
by French supplier.
Allsinelee:
Add AlternateIn Gluing
Provide glazing in lieu of Satin paint of architectural beams at 1st and 2nd floor hallways. $6.400
/ Alternates are accepted. General Conditions. insurance. Overhead andFee la be applied.
follovdng Irma in NOT 'DOS
Testing, abatement. containment or removal of hazardous materials.
Elting and expediting (fees for puling permits are included).
Supply of decora0ve light fixtures. sconces and chandeliers.
Supply and installation of lighting control. security. phone and aN systems, equipment. programming (pulling of wires provided by others is included).
Supply and installation of upholstery. fabric. carpeting, drapery and furniture.
Union labor.
Engineering.
Cost for controlled inspections.
Cost of temporary utilities used during construction.
Unforeseen conditions.
Final professional clearing.
Removal / moving of furniture. canvas paintings. rugs. art work. etc.
Mrror at Master Bath.
ArationaS
This proposal is valid for sixty days from date of submission.
All work has been calculated as regular tore. using ncn-mion labor.
Price assumes no retanage or liquidated damages.
Taconic is not responsible for damage to acSacent or neighboring properties unless the damage is due to Taconic's negligence.
Chariconons and Naos • Par I of 2
EFTA00796259
BUDGET PROPOSAL
Bld Makes and Explosions
Stair Hall Paintng 8 Master Tub Alcove
9 West 71st Street
New York, NY
Cabinet Alberto Pinto
April 12.2018
All light fixtures installed in this project must be approved by the Underwriters Laboratory (UL) or approved equal evidenced by a U.L. stamp and or certficate of
approval prior to installation by Taconic Rudders electrical subcontractor. Light fixtures that are not U.L. approved will not be installed until all required approvals
are obtained. Obtaining the necessary approvals at light fixtures that are not U.L. approved may result in additional cost and protect schedule delays.
Any change to work included in this proposal may incur additional cost. Additional cost may include trade and material costs. contractor's mark up (insurance.
overhead and profit) and General Conditions. General Condibons expense is ',cuffed as a result of extra time necessary to complete the work and extra
management costs directly related to the added work.
Otoldcahons and Naos • Par 2 or 2
EFTA00796260
TACUNICir BUI L PhilS
BUDGET PROPOSAL
BffillIUMVAI
Project Name: Stat Hal Painting 8 Master Tub Alcove
Project Address: 9 Weal 71st Street
Architect: Cabinet Alberto Pinto
Building Type: Interior Apartment Renovation
Bid Sutxnated Date: 4/12/2118
CSI Code Mem Budget
01.000 General Conditions
Prupect Manager
Site Supervisor.
Messenger. FedEx and Postage.
Temporary Tedephoneitomputer.
Miscellaneous Tools and Materials.
OSHA Safety requirements.
Subtotal General Conditions 69.755
02400 ale MaIntarence
Removal & coning of al detxis rinsing from construction.
Temporary protection materials for new construction.
Laborer At.
Laborer fn.
Sublobll SIM MalManance 68.530
02-990 8•Wotttve GmdMMn
Dern:awn to include the knowing:
Carefully remove casting caeings at Stair Nceth and South walls
Master Bath Above - careful removal of existing tub. tub fittings. stone deck and fascia
Carting of demolition debris.
Sublet.' bolKdW DIMICalen $ 5.190
06100 Rough Cropeaby
Provide gwb patching of North and South walls at stair case due to the removal of existing casings
at paintings.
Provide cement board patching at Master Bath Above due to the &location aid reinstallation of
new tub fittings.
Subtotal Rough Carpentry $ 3.500
09400 Slone
Master Bath Alcove provide and instal new slam flown° and waterproofing to match existing due
to the removal of existing tub.
Subtotal Stone 11000
09-900 Painting 8 Skint Coating
Star Ha.. Land rig. 151 Floor and 2nd F:cor North and South Flatways - provide skimcoating and
painting of gwb walls and ceilings to include the following:
Provide protection of all pre-finished cloy trim, door frames. marbleized baseboard
Stain ea North and South walls - slaincoat wads due to the removal of casings and canvas
Walls provide prep. prime and paint or walls
Ceilings - provide prep. prime and paint of ceilings and architectural beams
Ceilings flat paint
Archilectimal Beams Satin
Provide louch-ups of faux nailed baseboards
Master Bath Ceiling - provide skimcoal and sand prime with two coats or primer last coat or tinted
primer.
Subtotal Peking 8 Sirs Cora.) $ 114.990
00005 Gold Lull Gilding A/MIK*
Antique the existing gilding titan° the glided mirror frame as precedent reference. Paint and glaze
over the existing gold at the Meowing locations:
Fireplace surround ornaments
Corbels
Oreekdoen • Pape id 2
EFTA00796261
TACUNICir BUI L PERS
CSI Code Budget
112 tan In wall panels. casings. beams
Plaster molding sound canvas at Maims'
Custom aown moldings
Subtotal Odd Leaf/ Gilding Allowance 42.600
14430 Scaffolding
Fanish. erect and dismantle work platform from the ground level so 6 below the 2nd Door ceiling
height to include the following.
Pipe scaffold frames
Full decking of scaffokling
Ckangger level of planks at North. South and Weal eteviitalS
Stair tower
Guard rails
Subtotal Scaffolding 17.520
15-200 Plumbing
Master Bath Alcove
Disconnects assoclaled with demolition.
PlVeLde rougnng la the InstalaSon of new freestanding tub and conned.
Sublets' Plumbing 4.500
15-400 Plumbing Fbdures & Bath Accessories
Master Bath Alcove
Towel Bars - (2) Aem 20'. chrome
Robe Hook - (I) Aem. chrome
Exposed bathtub Stange R.W. Atlas. chrome
Bathtub - Watergame Company. Athena. allowance of 510.000
&N0S /Ium0tp Pixturee & Bath Accessories t 21,343
16-200 Electrical
Provide careful removal of existing switches. downers. tight anises. etc. as requred to the panting
scope. Provide instalabon of same upon completion of painang wok.
Subtotal Electrical 4.250
Construcdon Sub-Total: 5 366.627
Overhead & Fee: 13.5% 5 49.495
Insurance: 2.5% $ 10.403
Total Cost: 425.525
Bretlidoen • Pape 2o12
EFTA00796262
ℹ️ Document Details
SHA-256
f46c8c782ce6ea4af6d9ac24dae2f7d92cf3d24e8f07444084598d2c5393c0d7
Bates Number
EFTA00796256
Dataset
DataSet-9
Document Type
document
Pages
7
Comments 0