From: Brice Gordon
To: [email protected]
Cc: >, Richard Kahn
Subject: Fwd: ZM Road Project
Date: Mon, 19 Nov 2018 17:47:51 +0000
FYI
Sent from my iPhone
Begin forwarded message:
From: Gilbert Luna
Date: November 19, 2018 at 1:09:01 PM AST
To: Brice Gordon
Cc: Beto Sanchez
Subject: Re: ZM Road Project
Hello Brice,
I did go out and look at the main entrance road last week and there is a transverse cold joint where paving
ended one day and began the next morning. This is a normal unavoidable consequence of paving a long road. If
we had paved half the width of the road in order to reach Ranch Central, then there would have been a
longitudinal cold joint along the center line of the entire road.
As per the upper road, we still maintain that it was paved per industry standards and there is nothing wrong
with it. Nevertheless, to put this behind us, we will provide a one inch thick hot mix asphalt overlay on a 5,000
feet long section of the road from the Z gate at the main house south towards the ranch complex. This work will
be scheduled as soon as possible, but the asphalt mix will come out of Albuquerque and the weather must be
warm, so it likely will be next Spring.
Thank you,
On Fri, Nov 16, 2018 at 2:14 PM Brice Gordon < > wrote:
Good afternoon Gilbert
As discussed,
Did you get time to review final section of pavement from RT 41 to Ranch Central
If so can explain the cold joint and the surface irregularities ?
Also as perviously requested can you provide detail on fix for upper portion of road.
Please advise
Regard
Brice Gordon
EFTA01016212
Sent from my iPhone
Gi:ben el. Luna
President
EFTA01016213
ℹ️ Document Details
SHA-256
f5b669ce26c559180145a270ee16064b7d7195e8c5cdafb3d004aa6663e3fc7c
Bates Number
EFTA01016212
Dataset
DataSet-9
Document Type
document
Pages
2
Comments 0