EFTA02027888.pdf
👁 1
💬 0
📄 Extracted Text (305 words)
To: maitcomueevacationagmail.comj: Jeffrey [email protected]]
From:
Sent Fri 10/5/2012 6:45:00 PM
Subject Fwd: Big N
barqel.jpq
barqe2 jpq
LSJ Biq N Reburb.pdf
Rcscnding
I will inform Rich to proceed with hydrualic hose purchase, 230 LF @ cost $2475.60 shipping
included to tropical
as stated below have fittings instock
essage
From:
Date: Wed, Oct 3, 2012 at 8:01 PM
Subject: Big N
To: Jeffrey Epstein <ecvacation mail.com>
Cc: Rich Kahn
Jeffrey
As requested attached are 3 quotes for work on Big N, also the present deck and storage
conditions
1st quote from Bob Kassner, not to exceed price of $32,600.00
2nd quote from Sub Base Dry Dock for an estimated cost of $40,000.00
3rd quote from Island Rigging for hydraulic hose and fitting install, this work would be and in
addition to BOTH quotes
Please note the I also recieved a bid for Stainless steel fitting for 24K, I did not submit, fittings
would out last hoses!!!
please add $2,500.00 for misc items such as wiring, gauges, fire extinguishes, paint etc, all labor
would be in house (LSJ Employees)
My recommendation after reviewing scope of work is
Have Bob Kassner do the work, LSJ to support and supply hydraulic fittings and hoses
Barge would be located at LSJ or Red Hook depending on weather and work.
This would allow us to oversee work and assist when needed directly
At this time the Bilge cleaning, doors, plex glass windows have been completed, but as the
photos show the rest of the barge needs TLC
Monday 8th Big N will be brought to LSJ, complete clean will take place, it will take 2 days ( in
house labor) Carlos will be in charge
I can forward pictures of present condition, wiring, hydraulic fittings etc, if required.
EFTA_R1_00536333
EFTA02027888
For your consideration
USVI
New Mexico
USVI
New Mexico
EFTA_R1_00536334
EFTA02027889
ℹ️ Document Details
SHA-256
f63429ec685b32117162ce171408cd1fd9a85e688e4e08ca2d9842137925f945
Bates Number
EFTA02027888
Dataset
DataSet-10
Type
document
Pages
2
💬 Comments 0