EFTA02609987.pdf

DataSet-11 2 pages 528 words document
👁 1 💬 0
📄 Extracted Text (528 words)
From: michael glidden Sent: Tuesday, December 18, 2018 3:15 PM To: Cc: brice gordon; LSJ GSJ; Richard Kahn; Kyle reavis Subject: Re: Barge Good =orning. With regard to =he barge, 3 weeks is the expected time needed for the exhaust work, the =ub rail installation, and also inspect and address rudder alignment =long with propeller inspections. There is also a list of general =aintenance items Boscoe has that can be attended to while out of the =ater for that 3 weeks. With regard to the scope of electrical work to be done there =re two items on LSJ that will be done with a combination of in house =abor and local contractors. They would be the duc bank from the =enerator building to the sea water intake building that will include =he new fiber for the desal system and the repair of the 5 palms =lectric and fiber feeds due to your request that the work be done as =oon as possible. The material for the duc =ank is on island and the material list for 5 palms is going out today =or pricing. I was going to have LS1 purchase all the material and have = local contractor install for which I am going to get two =rices. The only area where the amount of potential =ork is likely to interest a stateside company would be GSJ. The issue with getting bids at this point is any scope =f work that may be put into a list is simply an idea with no =ngineering or design to base an actual bid on. Before you can issue a scope of work to be bid on there needs =o be a considerable amount of time and money spent with an engineering =nd design firm to produce drawings and/or designs, on paper, that =ontractors can then put a dollar figure to. I =eached out to Springline for this specific purpose and they declined =as have Jaredian Design. A stateside =ontractor may be interested in doing design-build and maybe that would =e a path to explore but I do not have any connection with a company of =hat type. On Dec =7, 2018, at 4:31PM, 1 <[email protected] <mailto:[email protected]> wrote: how many days neeeded. . what work still =equired barge. other boats ready more =nportantly is where is the scope of elecrtic jobs needed =s we discussed a week aglo On Mon, Dec 17, 2018 =t 2:45 PM michael glidden > wrote: Good day. Is there any update as to when scheduling can be made for the =aintenance and exhaust work needing to be done on Big N = please note EFTA_R1_01804166 EFTA02609987 The information contained in this =ommunication is confidential, may be attorney-client =rivileged, may constitute inside information, and is =ntended only for the use of the addressee. It is the =roperty of JEE Unauthorized use, disclosure =r copying of this communication or any part thereof is =trictly prohibited and may be unlawful. If you have =eceived this communication in error, please notify us =mmediately by return e-mail or by e-mail to [email protected], and destroy this =ommunication and all copies thereof, including all =ttachments. copyright -all rights reserved 2 EFTA_R1_01804167 EFTA02609988
ℹ️ Document Details
SHA-256
f715073beddfbc30f442e636bfff5d6d90825bfb2487648d5e06cd6180e03512
Bates Number
EFTA02609987
Dataset
DataSet-11
Type
document
Pages
2

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!