EFTA00647725.pdf
👁 1
💬 0
📄 Extracted Text (211 words)
From: Craig Martin ..c >
To: brice gordon <a.
Cc: Richard Kahn a, TOM MELNICK <a.
Subject: Steel Building
Date: Thu, 03 May 2012 17:34:57 +0000
Brice;
As you put the numbers together for the new pre-fab engineering building please be as specific as possible.
Where you have to leave an allowance for an item please identify. Tom's work should be as specific as possible,
separating labor from material etc.
Please put on Excel spread sheet.
To include; (Feel free to add more categories)
• Site preparation labor and material
• Permits, shipping, taxes, duties
• Any design work or does needed for Govt approval, does this have to be inspected by govt?
• Cost of structure, FOB where?
• Installation of structure, labor and material
• Concrete pad, labor and material
• Exact size of building and pad
• Concrete apron and or yard improvements
• Sewage/Water provisions
• Plumbing, electrical,lighting
• Septic tank or grease trap
• Site drainage
• Equipment rental, if necessary
• Repair of other building/shed
• Any additional labor
• Outside labor for installation plus Tom's cost to supervise job.
Please call if you need help. If needed we can conference call Tom you and myself.
Are we shooting for today or Monday?
Craig
EFTA00647725
ℹ️ Document Details
SHA-256
f80fd2031c37f62ef707cb518739adf59bcf8c2995e50c64fba7a89cb4e49910
Bates Number
EFTA00647725
Dataset
DataSet-9
Type
document
Pages
1
💬 Comments 0