📄 Extracted Text (161 words)
Subbase Drydock Estimate
T: Fax:l
Box 304429 Date Estimate #
St. Thomas, USVI 00803 8/31 2017 915
Name /Address
LSJ,LLC
"Big N"
Anna:
Terms Project
Upon Comple...
Description Qty Cost Total
Sandsweep cargo bay, cargo bay walls, and aft deck. Prime and paint with a non-skid two part I 12,340.00 12,340.00
epoxy paint. Includes Labor and Materials.
Fabricate and weld splash guards into place to minimize water intrusion through the front ramp. I 7,500.00 7,500.00
Prime and paint for increased longevity.
Prep and grind cracks throughout vessel.
Includes Labor and Materials.
Both cutless bearings are worn and not within tolerance. We recommend changing these while I 3,750.00 3,750.00
hauled out. We also recommend checking the engine alignment while hauled out to ensure there
are no issues with the drive train. Includes Labor and Materials.
Degrease engine room, remove, clean and dispose of all waste oil. Approximately 200 gallons of I 3,750.00 3,750.00
waste oil after clean up.
Total s.27.34ii.lio
Signature
EFTA00610262
ℹ️ Document Details
SHA-256
f865ed11addca7ac92cc7aca11e0bd6a7371baac38c19a7762f70aedf791a626
Bates Number
EFTA00610262
Dataset
DataSet-9
Document Type
document
Pages
1
Comments 0