EFTA00610261
EFTA00610262 DataSet-9
EFTA00610263

EFTA00610262.pdf

DataSet-9 1 page 161 words document
P17 V16 P23
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (161 words)
Subbase Drydock Estimate T: Fax:l Box 304429 Date Estimate # St. Thomas, USVI 00803 8/31 2017 915 Name /Address LSJ,LLC "Big N" Anna: Terms Project Upon Comple... Description Qty Cost Total Sandsweep cargo bay, cargo bay walls, and aft deck. Prime and paint with a non-skid two part I 12,340.00 12,340.00 epoxy paint. Includes Labor and Materials. Fabricate and weld splash guards into place to minimize water intrusion through the front ramp. I 7,500.00 7,500.00 Prime and paint for increased longevity. Prep and grind cracks throughout vessel. Includes Labor and Materials. Both cutless bearings are worn and not within tolerance. We recommend changing these while I 3,750.00 3,750.00 hauled out. We also recommend checking the engine alignment while hauled out to ensure there are no issues with the drive train. Includes Labor and Materials. Degrease engine room, remove, clean and dispose of all waste oil. Approximately 200 gallons of I 3,750.00 3,750.00 waste oil after clean up. Total s.27.34ii.lio Signature EFTA00610262
ℹ️ Document Details
SHA-256
f865ed11addca7ac92cc7aca11e0bd6a7371baac38c19a7762f70aedf791a626
Bates Number
EFTA00610262
Dataset
DataSet-9
Document Type
document
Pages
1

Comments 0

Loading comments…
Link copied!