EFTA00299413.pdf

DataSet-9 1 page 173 words document
👁 1 💬 0
📄 Extracted Text (173 words)
Stepping Stones M & G LLC Estimate 3 Morse Court Date Estimate tit New Canaan, CT 06840 6/3/2013 '84', Name / Address Groff Lesley Project Kitchen Countertops Description Qty Rate Amount Unit sq.ft.o pcs Total Kitchen Countertops - Includes bottom counter of Pass Thru Material and fabrication of 3cm Medium I 8,960.00 8,960.00 8,960.0OT Tier Pricing (Material cost between $30-$40 per SF). Based on 76 Sq.Ft. of material with undennount sink cut out and 38 linear ft of Eased edging -stove. No splashes. Trade Discount -10.00% -896.00 -896.00 Labor to template and install kitchen. I 1,900.00 1,900.00 1,900.00 To change edging from 3m Eased edging to 0.00 0.00 0.OOT 5cm Mitered Eased edging, an additional cost of $3,800.00 will be added to this estimate. This is based on 38 linear feet of edging. (Includes pass thru) • • • *This estimate is for pricing purposes only. Once actual material is selected and elevations are provided, I can give you a much more accurate price"• Subtotal $9,964.00 Sales Tax (6.35%) $512.06 Total $10,476.06 EFTA00299413
ℹ️ Document Details
SHA-256
f915a1a7ee4b278885cb1130c2eeec890b10d285dd23e5308b3f0ee80e2a6f74
Bates Number
EFTA00299413
Dataset
DataSet-9
Type
document
Pages
1

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!