📄 Extracted Text (118 words)
To: Jeffrey Epsteinueevacationftmailcom]
From: Mice gordon
Sent Mon 2/18/2013 4:02:52 PM
Subject: Electrical Bids
Jeffrey
Danny as finally found someone to help him perform the electrical work on the new and existing
engineering buildings.
Scope of work:
installation of a 150 amp 3 phase panel, receptacles and switching, lighting inside and out (new
building)
installation new 3 phase panel, receptacles and switching, tire, welder, compressor electrical
electrical. inside and outside lighting
2 weeks @ $2000.00
this was the lowest bid received out of 3 verbals
one person declined
second came in at $4000.00
3rd bid was 2500, Danny got him down to 2000.00 for 2 weeks.
can we proceed
Brice Gordon
USVI
Phone:
New •
Phone
EFTA_R1_00334809
EFTA01903651
ℹ️ Document Details
SHA-256
fa779c083159a194c45b933519f7febd16b38ddee9b626593b60b3364e7cadab
Bates Number
EFTA01903651
Dataset
DataSet-10
Document Type
document
Pages
1
Comments 0