ESTATE PROGRESS REPORT - SEPTEMBER 26, 2003 ZORRO LOCATION COMMENT NEXT DATE REVISED ACTION BY BY DATE Boulder Lights 1. RMC (installation co) quotes: $12, 827.62 for wiring or Brice / $22,822.28 for wiring & lights. JE approved these lights Madison however, waiting to see if Cox's lights are better. 2. Lights recommended by Madison on site. Unable to wire-up due to their large size & energy requirements (need electrician to wire-up). Brice to speak to Madison week of Sept 29 to come up with better ideas / solution. Chess Set Lights Lights recommended by Madison are on site. Unable to wire up Brice / due to their large size & energy requirements (need electrician to Madison wire-up). Brice to speak to Madison week of Sept 29 to come up with better ideas / solution. Caboose Gandydancer is only co in NM that is willing to do this project. Their engineers advise for a concrete pad to be laid down due to the ground instability of the new site. Brice to get a quote for concrete pad New Colorado co. to be scheduled to make site visit for second opinion / proposal. Fountain in 1. Daniel R to design & forward to Pinto for approval. Daniel R Estancia 2. Madison Cox submitted drawings. Plans sent in Sept 19 report. i EFTA00578143 ESTATE PROGRESS REPORT - SEPTEMBER 26.2003 LOCATION COMMENT NEXT DATE REVISED ACTION BY BY DATE 3. More tile selections for fountain — samples / book FedEx'd to JE 7P. JE to advise if likes any. JE requested possible removal of Pinion Tree / adding more trees. Front Entrance 1. Madison submitted drawings. Plans sent in Sept 19 report. 2. JE requested additional Ponderosa Pines to produce a mirror JE image. Estimate per tree sent in Sept 19 report. JE to approve. If this project is approved will require estimates for cutting concert and additional irrigation. Estancia Extension added & water pressure increased, still maintaining Complete Fountain - mushroom-shaped water flow. JE to view Mushroom Nozzle Horse Fountain No Decision On hold Landscaping 1. Replacement of 20 Pinion trees to be completed by Oct 8. S. de Cristo 10/8 Main House 2. Replacement trees for the Pool Area - JE said no to trees, JE maybe fountain. JE to advise further action. 3. Does JE wish to have existing planting beds tiled in? Please JE see attached photos for reference. *A-2 2 EFTA00578144 ESTATE PROGRESS REPORT - SEPTEMBER 26.2003 LOCATION COMMENT NEXT DATE REVISED ACTION BY BY DATE Ranch Vehicles NY Suburban to be sent to Zorro & 2004 Suburban to be purchased for NY. Delivery expected beginning of Dec Water Issues — 1. MBI on site Sept 26 to attempt one last repair on 10,000.00 MBI 9/27 Dakota Well gallon tank. Results known after tank fills with water by Sept 27. Zorro Ranch 10/5 2. Fencing around Evaporation Pond began Sept 22. Expected completion by Oct 5. Container 1. Two urns to be placed outside at MH by Oct 3. 10/3 Shipped from 2. "Lion eating ram sculpture" to be placed on table outside LR 10.'3 NYC by Oct 3. 3. JE to advise location of rugs on next visit. JE Main House Proposals on site. 66-page proposal submitted. Proposal sent to Water Treatment Darren for his review. Pool - New Pool Heater on site, removal/installation to began Sept 15. Hermersons 9/29 Pool Heater Expected completion by Sept 29. Spa Leaking 1. Hermersons scheduled to look at first week of Oct. Hermersons 10/3 2. Unit has been emptied & power washed. Will assess re-grouting in conjunction with leak repair. Dunlavy Speakers 1. Speakers are at 7P' St. 2. Repair on tweeters to be completed in NYC. (Rich) 3 EFTA00578145 ESTATE PROGRESS REPORT - SEPTEMBER 26 2003 LOCATION COMMENT NEXT DATE REVISED ACTION BY BY DATE Wiring of New Rewire & hide all cabling within wall lines, rather than under area JE Speakers in & furniture. FYI: Some furniture & baseboards will have to be Library pulled from room. The existing speaker wire is too small for the new speakers. JE to confirm this is what he wants done. Please see attached photos for reference. *A-3 Clay Target JE to advise if to purchase a proper clay target thrower. Please JE Throwers see attached options. *A-4 Painting MH MH Picture Window has been repainted. Please see attached Complete photos. *A-5 JE to view 4 EFTA00578146
ℹ️ Document Details
SHA-256
fbac0b5765653cbf1b0edd8d21182d1f8aa019198fd2e3461e1a6d2bcd225ebc
Bates Number
EFTA00578143
Dataset
DataSet-9
Document Type
document
Pages
4

Comments 0

Loading comments…
Link copied!