EFTA00521481
EFTA00521482 DataSet-9
EFTA00521485

EFTA00521482.pdf

DataSet-9 3 pages 481 words document
P17 V11 P23 V16 D4
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (481 words)
Prime Renovations & Painting 12 Cora Court Hampton Bays New York 11946 Estimate U.S.A # EST-1172 (917)287-2878 (631)680-2238 Bill To Mervin Dela Cruz 9 East 71 St New York Estimate Date : 10/10/18 10021 New York :JUG. Qt, Rate Amount 1 SCOPE OF WORK: 1.00 5,000.00 5,000.00 Site protection protect all work areas using masonite boards protect any walls as needed with plastic covers protect bedroom floors and walls during the duration of the work 2 Plumbing 1.00 9,500.00 9,500.00 Prier demolition 1. shut down water to the steam shower, toilet room, walk•in shower & sink remove all pluming fixture trim remove toilet, sink vanity temporary cap all water lines and drains during the duration of work After all finish work has been completed 2. reinstall all trim fixtures, toiletsink and vanity 3 Demolition: 1.00 24,000.00 24,000.00 1. Remove 3 brass doors leading into the steam room, shower & toilet room after completion of the work to be reinstalled Steam Shower 2. completely demo by removing all the stone and cement boards from the ceiling, walls, floors and benches Walk•in shower 3. completely demo by removing all stone and cement boards from ceiling, walls, and floor Toilet Room 4. completely demo by removing all stone and drywall boards from ceiling, walls and floor Sink area 5. completely demo by removing all stone and drywall boards from ceiling, walls and floor Cart away all debris 4 Finish Work: 1.00 42,000.00 42,000.00 EFTA00521482 Steam Shower 1. apply 5/8 cement boards to the ceiling, walls and bench 2. apply Laticrete 9235 with membrane waterproofing to the ceiling, walls, floors and bench 3. apply tiles to tile to the ceiling, walls and bench 4. finish grouting tiles Walk•in Shower 1. apply 5/8 cement boards to the ceiling, walls 2. apply Laticrete 9235 with membrane waterproofing to the ceiling, walls and floor 3. apply tiles to tile to the ceiling, walls and floor 4. finish grouting tiles Toilet Room 1. apply 5/8 drywall boards to the ceiling, walls 2. apply Laticrete 9235 with membrane waterproofing to the walls and floors 3. apply tiles to the ceiling, walls and floor 4. finish grouting tiles Sink Area 1. apply 5/8 drywall boards to the ceiling, walls 2. apply Laticrete 9235 with membrane waterproofing to the walls and floor 3. apply tiles to the walls and floor 4. finish grouting tiles 5 PAINT 1.00 6,500.00 6,500.00 completely paint ceiling and walls that are not getting tiles 6 Cleaning 1.00 2,000.00 2,000.00 thoroughly clean all the work areas and remove all tools and any other debris left Sub Total 89,000.00 Total $89,000.00 Notes All tiles and any other fixtures are to be provided by client Terms & Conditions EFTA00521483 Looking forward to your business Estimate valid for 30 days 50% deposit required to begin work Contractor: Prime Renovations & Painting (signature) Date: Client: Mervin Dela Cruz (signature) Date: 3 EFTA00521484
ℹ️ Document Details
SHA-256
fc9545eb8a486ddd7b559234fe1602b351db53fc344ad5d82e1ffa30a724f393
Bates Number
EFTA00521482
Dataset
DataSet-9
Document Type
document
Pages
3

Comments 0

Loading comments…
Link copied!