EFTA00699996
EFTA00699998 DataSet-9
EFTA00700000

EFTA00699998.pdf

DataSet-9 2 pages 244 words document
P17 V16 P19 P24
Open PDF directly ↗ View extracted text
📄 Extracted Text (244 words)
From: Brice To: Jeffrey Epstein <[email protected]> Subject: Re: Buck Steel Date: Tue, 16 Oct 2012 19:45:38 +0000 Unfortunately it would require buck steel to do major design changes to match existing bolt pattern It easier for us to cut and replace The existing pattern came from American Steel Sent from my iPhone On Oct 16, 2012, at 2:28 PM, Jeffrey Epstein <[email protected]> wrote: can buck steel build to our bolts in place„ what plans did we use to put them in?9999 On Tue, Oct 16, 2012 at 8:19 PM, Brice < wrote: Rich Danny and I have reviewed drawings from Buck Steel Please note that the existing bolt pattern that is in place will have to be removed. and new anchors will need to be epoxied in to match shed from buck steel I assume that Jeffrey is ok with Door placement Would recommend Forward Any concerns please call Regards Brice EFTA00699998 Sent from my iPhone The information contained in this communication is confidential, may be attorney-client privileged, may constitute inside information, and is intended only for the use of the addressee. It is the property of Jeffrey Epstein Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited and may be unlawful. If you have received this communication in error, please notify us immediately by return e-mail or by e-mail to [email protected], and destroy this communication and all copies thereof, including all attachments. copyright -all rights reserved EFTA00699999
ℹ️ Document Details
SHA-256
fd0c4057a25f2b2ea935d8fcab5989808955bc3ea6c4437d7e6f8550c9880b0e
Bates Number
EFTA00699998
Dataset
DataSet-9
Document Type
document
Pages
2
Link copied!