EFTA02607655.pdf

DataSet-11 5 pages 502 words document
P23
👁 1 💬 0
📄 Extracted Text (502 words)
From: Richard Kahn Sent: Thursday, December 27, 2018 10:40 PM To: Jeffrey Epstein Subject: Fwd: On going work list Glidden never responded to this email..= Richard Kahn HBRK A=sociates Inc. New York, NY 10022 <=iv style="direction: inherit;">Phon Fax Ce=l Begin forwarded message: =br> From: Richard Ka=n Date: December 21, 2018 at 2:16:52 PM PST To: mich=el glidden &g=; Cc: Brice Gordon >, Jeffrey Epstein &=t;[email protected] <mailto:[email protected]», K=le reavis &=t; Subject: Re: On going work list Mike Can you please update your punch list with the following descr=ptions: a) completed b) scheduled c) open Additionally have you comple=ed Spec List to give out to Electricians.. I sen= Kyle their contact info earlier this week.. In case ou ne=er received: mi Thank you Richard Kahn EFTA_R1_01799609 EFTA02607655 HBRK Associates Inc.=br New York, NY 10022<=span> tel fax =span>cell </=pan> On Dec 1, 2018, at 10:18 AM, Michael Glidden wrote: 1. Palm tree lighting <=lockquote type="cite">2. Courtyard lighting <=blockquote> 3. Landscape lighten= at Master bedroom stairs =span>4. Pool cabana kitchen electric 5. Main compound cabanas, electric a=d lighting 6. =nbsp;Chillax a/c renovation, chandelier removal and lighting 7. Dock electric, light=ng, under water lighting and wifi 14. Repair 2nd pool heater at flag pole pool 15. Repair/refurbish both fuel dispense=s 16. Complete trou=le shooting/repair Diesal pump feeding dispenser 17. Install new water distribution pump system=for LSJ 2 EFTA_R1_01799610 EFTA02607656 18. Refurbis= water distribution manifold 19. Install new sewage lift/mascerating pump for L.51 staff cottage a=d piping to treatment plant 20. Address water heating issue at staff cottage 21. LSJ tiki kitchen remodel electric an= plumbing 22. Blue B=ach cottage transformer replacement 23. Electric and data to S palms 24. Electrical conduit work at tower antenna 25. Solar system and ele=trical at Pebble Beach cottage 26. Power to beach for captains 27. Larger filter for sea water intake at library/beac= well 28. Refurbish f=re suppression system in generator building 29. Fuel truck rehab per survey 30. Generator fuel system refurbishment</=pan> 31. Replacement of ele=tric panels in both pool pump rooms 32. Electric out to new waterfall area 33. Replace all exterior light trims to wh=te due to rust 34. R=place all exterior switch and outlet covers due to corrosion 3 EFTA_R1_01799611 EFTA02607657 35. Staff cottage dryer to be chang=d to propane jetting 37. Install new awnings at both pool gazebo structuresc=span> 38. Install two new s=wage treatment plants on GSJ 39. Wire new generators on GSJ 40. Install new flagpole lights on GSJ 41. Replace water distribution pump on G=1 42. Install electr=c and plumbing in new tiki hut on GSJ 43. Batteries to be replaced in GSJ solar system 44. Daily managing of barge sc=edule 45. Research a=d order maintenance/repair parts 46. Daily maintenance of electrical and plumbing systems for bo=h islands 47. On goi=g installation and refurbishment of landscape lighting island wide 48. Coordinate barge maintena=ce/refurbishment work 49. Coordinate with local architects for future services 50. Daily issues that cannot be antici=ated or avoided That would be all for no=. 4 EFTA_R1_01799612 EFTA02607658 5 EFTA_R1_01799613 EFTA02607659
ℹ️ Document Details
SHA-256
fd3e91bef6d1251deaaf49ef2dda554c7012dda9388e5cca930a59d257013d1a
Bates Number
EFTA02607655
Dataset
DataSet-11
Type
document
Pages
5

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!