EFTA02442967.pdf

DataSet-11 1 page 198 words document
👁 1 💬 0
📄 Extracted Text (198 words)
To: J Epsteinueey " Cc: Darren Indyke From: Brice Gordon Sent: Thur 5/28/2009 9:45:41 AM Subject: Mechanical Building, retaining walls To: JEE Contacted Tom Melnick in regard to the retaining walls for the Mechanical Building. His recommendation is to do the Following. 1. form pad and retaining walls between existing engineering and new mechanical building, this area would be use for fuel truck storage etc. Please note original plans had an access road, and existing engineering removed. The above would give you the option to refurbish engineering structure later. 2. If you do not intend to extend Mechanical building for new RO and cistern, then another retaining wall will need to constructed to retain fill and also to give access to roof area for boat trailer storage etc. Your last indication to extending the building was , "probably" Notes: Tom needs a decision by Friday, as to which direction you wish to proceed and to keep on schedule. Newman and Moll will demobilize by the end of next week, i.e. all forms, containers of equipment will be removed from the Island Would recommend that Tom views budget on this, once direction is given. Please advise Brice EFTA_R1_01518180 EFTA02442967
ℹ️ Document Details
SHA-256
fd68edcaccb890136b1aa95831bfd673ff01643ca7b09d9632cb8cff9aa219a0
Bates Number
EFTA02442967
Dataset
DataSet-11
Type
document
Pages
1

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!