EFTA00922214.pdf

DataSet-9 1 page 256 words document
P23
👁 1 💬 0
📄 Extracted Text (256 words)
From: Jeffrey Epstein <[email protected]> To: Ga Kerne < ' Subject: Date: Sat, 29 Oct 2011 18:32:11 +0000 the wall on the top of the librabry road, still looks too high, the angle needs to be done at the end of the sprial lookds more like20 degrees east of north.. not forty five. , the steps in the courtyard should be replaced on the entire step if it looks as obvious from the photo , that the far one only was replaced on the bottom step. , the grading behind cabana four does not look as if has been as redone as the eastern most part of the hill. , the kitchen in the flagpole pool , refrig is still the same , no finsih cabinet, . no courtyard lights., i want a plan to retile the main pool, when will the big wind doors be ready? , there has been no grading in the area between the master and the library„ the western planter is still not touched, The information contained in this communication is confidential, may be attorney-client privileged, may constitute inside information, and is intended only for the use of the addressee. It is the property of Jeffrey Epstein Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited and may be unlawful. If you have received this communication in error, please notify us immediately by return e-mail or by e-mail to [email protected], and destroy this communication and all copies thereof, including all attachments. copyright -all rights reserved EFTA00922214
ℹ️ Document Details
SHA-256
fe6d4afaccb5d30725c31721db3edf3ff14ae61828c10dd8ab99a1b5f156d00d
Bates Number
EFTA00922214
Dataset
DataSet-9
Type
document
Pages
1

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!