To: curbs an]
From: Jeffrey Epstein
Sent: Sat 4/18/2009 6:05:25 PM
Subject: Re: Master suite draft budget
yes
On Sat, Apr 18, 2009 at 1:35 PM, curtis R > wrote:
Did you want me to call you?
On 4/17/09 5:06 PM, "JEE" <jeevacation@gmaitcom> wrote:
lets talk tomorrow
On Fri, Apr 17, 2009 at 5:06 PM, Jeffrey Epstein <[email protected]> wrote:
yes... i can't see demo at 30k jules can knock it down in an hour
On Fri, Apr 17, 2009 at 5:04 PM, curtis R a> wrote:
In the General Conditions -$63,500 - Boscoe, Bruce , Casey and Carlos and Arran
and any other labor —. This gets billed back to the
construction budget
As well as Demolition $30,000
If we build with our own manpower, which we could, we would save. But it would
take from other island projects ,of course.
This budget is based on subcontractors for
Rock work
Concrete
Electrical
Milwork
Plumbing.
On this one - We might be able to use Gary for the electric, Brian/Arran combo for
the plumbing — etc . we could do our own concrete — but ..
Is that what you mean?
On 4/17/094:37 PM, "JEE" [email protected]
<http://[email protected]» wrote:
EFTA_R1_00203527
EFTA01828159
give me incremental cost.. plese„ boscoe
salary and others is a fixed cost whether or not
i build
On Fri, Apr 17, 2009 at 3:50 PM, curbs R
» wrote:
Jeffrey,
Please find attached Draft Budget for the Master Suite.
Notes:
1. Demolition will include what is almost a ful gut job.
the entire roof
all the columns
the existing floor in the bedroom section.
2. The finishes need to be honed down and represent a large
unknown.
3. The cost is around $600 per square foot for a total of 1,372,690
Call to review with Silvina or me for scope adjustment as needed.
Curtis
EFTA_R1_00203528
EFTA01828160
ℹ️ Document Details
SHA-256
ffedf9aaa5befe87cbca84352cba01ecfa5fb638ec84dad920dcae019c505829
Bates Number
EFTA01828159
Dataset
DataSet-10
Document Type
document
Pages
2
Comments 0