From: "jeffrey E." <jeevacationggmail.com>
To: michael glidden
Subject: Re: LSJ INTERNET
Date: Wed, 05 Sep 2018 12:34:17 +0000
please oversee
On Wed, Sep 5, 2018 at 2:05 AM, michael glidden c > wrote:
Jermaime, don't forget about the fiber needed for the new controls between the decal bldg. and the seawater
intake room. That could be ordered at the same time. A 1000' reel would do but Dean needs to be consulted as
to specifics of the cable itself.
Sent from my iPhone
On Sep 4, 2018, at 9:09 AM, Jermaine Ruan > wrote:
Good day All
Update LSJ internet
I have asked Mr. Earl Thomas of 2 Guys Services (FYI No relation to Liston Thomas who also has assisted on occasion)
to assist in troubleshooting the situation for Blue Beach internet service. Earl has worked with VIVA and was one of
the engineers that came to assist after the storm. He was shortly released from VIVA but has started his own company.
He has knowledge in fiber networking and is willing train me since I have must of the primary tools needed and I did
the GSJ fiber run.
Our findings are as follows:
The run of fiber between the Data Center and the Gym is severely compromised (2 of the 6 strands are broken). The
results of this is the operating fiber strands takes the Tower/Gym signal down to the data center for distribution to the
rest of island network is operational, but the 314 and 4th strands that take the distributed signal back to the Gym is
broken. These strands give the Gym switch actual internet service for the Gym and relay the signal to the Blue Beach.
In addition, it also gives the internet signal to the radios that give the Flagpole Pool internet and phones.
Ideally, order new multi-mode fiber. Create a proper pull through at the sight where the damage conduit was and
terminate on both ends.
I have two alternatives for fast service restoration.
Option 1:
We currently have fiber on site. Let's pull a brand-new run of fiber from the Data Center to the Gym. I, with Earl's
guidance, will fix the ends and restore service.
Option 2:
If the fiber on site is not long enough, we can run enough to reach the area with the line was dug up and pull back
from the Gym. Let's pull a brand-new run of fiber from the Data Center to the Gym. I, with Earl's guidance, will fix the
ends and restore service.
Both options still need a proper pull through box at the site at the breakage.
Please note:
EFTA01024343
I do not have a clear 'line of sight' to install radios between Data Center and Blue Beach.
Regards
Jruan
please note
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
JEE
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to [email protected], and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
EFTA01024344
ℹ️ Document Details
SHA-256
28feef85eb2ea581d24672b7ede7801ad9d19d7c928772558bed55adde272b1d
Bates Number
EFTA01024343
Dataset
DataSet-9
Type
document
Pages
2
💬 Comments 0