solar now not working...
hoping brice did not tweak system as he said he was going to stay on GSJ last night
also told me yesterday that no one stayed on GSJ since glidden left..
Richard Kahn
HBRK Associates Inc.
575 Lexington Avenue 4th Floor
New York, NY 10022
tel
fax
cel
Begin forwarded message:
From:
Subject: Re: Friday June 29th
Date: September 5, 2018 at 7:22:04 AM EDT
To: Dan Prosolar <
Cc: Marcelo <
> Brian Walden < >, Brad Spernak
> "
Morning
Same issue no power again
Sunny islands dead
Sunny boys flashing yellow
Please as to what you would like to do
Brice
Sent from my iPhone
On Sep 4, 2018, at 12:11 PM, Dan Prosolar > wrote:
good morning all! hope everyone had a great weekend.. minus GSJ with no power.
i feel very good about my visit today. i was receiving error codes pertaining to an OVER-VOLTAGE situation. this is great news
considering we have been fighting the opposite problem since the hurricanes. i have had the system set to perform at the absolute peek
voltage it can to avoid loosing power. this maximum voltage setting teeters the system on the edge of its capabilities. as we see now it has
obtained and exceeded its voltage setting limits on the sunny islands. there is no damage done, only the inconvenience of it shutting down
to protect itself. Today i throttled back the target voltage by Iv. this should prevent more shutdowns due to over voltage. i think we have
got this system dialed in.
EFTA01024334
All the best, Dan Chrisman
On Mon, Sep 3, 2018 at 6:57 PM, fr-> wrote:
Good Evening
The solar system is down on GSJ
No power Sunny islands
Sunny boys seem to be in alarm
Cluster box no power
Please advise as to Dans schedule
Regards Brice
Sent from my iPhone
On Jul 11, 2018, at 2:10 PM, Marcelo <a wrote:
Good Afternoon Richard,
Please see the below email containing Dan's summary of what actions he performed on his last visit to
GSJ.
Regards,
Marcelo Perez
Project Manager
<401A334B1BB040DOBBA29AA3089AB844[431569].jpg>
From: Dan Prosolar
Sent: Wednesday, July 11, 2018 1:10 PM
To: Marcelo
Subject: Re: FW: Friday June 29th
Good afternoon all, sorry for the delay my email had an issue and became unlinked so I wasn't
receiving these untill now. Regarding GSJ here is what's been achieved.
EFTA01024335
-all Aquion battery modules are wired to bypass the corroded, water damaged circuit boards that
could interfere with charging profiles.
-sunny islands (6) were downgraded to firmware version 6.0.02. This was done to allow a broader,
linear charge profile to be set
-charging parameters are now based on voltage set points rather than state of charge calculations
done internally with different references.
-max charge voltage has been set to 58.5V and the batteries will not stop charging untill a voltage
1.5V over the set limit is a achieved for 15 seconds. This gives them the ability to serpase the
previous charge voltage of 56.7V
- the main issue that caused so much down time before was as follows. A target charge voltage that
matched the Aquion batteries was not possible with the previous profile. Compiled on that was faulty
Aquion circuit boards preventing the batteries from properly charging to a suitable voltage. Aquion,
as we know, is no more, so it's impossible to obtain replacement parts. Aquions bms never met the as
advertised performance and created more issues than we could have imagined. In short, the changed I
made allowed for a higher, more suitable battery voltage to be achieved and prevents the premature
shut down we saw before.
Again, sorry for the delay, hope all is well
Thanks
Dan Chrisman
Senior Technical Specialist
Prosolar LLC
From: Richard Kahn
Sent: Wednesday, July 11, 2018 10:30 AM
To: Brian Prosolar
Cc: Brad Spemak; michael glidden;
Subject: Re: Friday June 29th
EFTA01024336
can we do thursday morning or anytime friday
when can expect Dan's summary?
please advise
thank you
Richard Kahn
HBRK Associates Inc.
575 Lexington Avenue 4th Floor
New York, NY 10022
tel
fa
eel
On Jul 10, 2018, at 2:18 PM, Brian Prosolar fr> wrote:
Afternoon Richard,
Brad is traveling to San Francisco for a conference and I'm boarding a plane to STX. I've asked
Dan to write a synopsis of his efforts and we have been monitoring for proper function. I'll relay
this tomorrow once he's finished.
We're still evaluating but all is functioning as intended for the moment. Additional monitoring
and confirmation are needed since the weather over the last week has been extremely cloudy.
Would it be possible to have our call on Thurs. afternoon at 3 EST?
Regards,
Brian Walden
ProSolar America, Ilc
Director of Operations
c. 3
On Jul 10, 2018, at 1:50 PM, Richard Kahn <MMIla wrote:
i have not yet heard back from anyone on a time to speak
EFTA01024337
please advise
thank you
Richard Kahn
HBRK Associates Inc.
575 Lexington Avenue 4th Floor
New York, NY 10022
tel
fax
cel
On Jul 9, 2018, at 5:36 PM, Richard Kahn < wrote:
can we please arrange a call for tomorrow to review current status of GSJ solar
thank you
Richard Kahn
HBRK Associates Inc.
575 Lexington Avenue 4th Floor
New York, NY 10022
tel
fax
cel
On Jun 29, 2018, at 1:36 PM, Brian Prosolar wrote:
Afternoon Rich,
I believe the normal boat arrival time is 8 or 8:30 a.m. in Redhook.
Dan will be there.
Regards,
EFTA01024338
Brian Walden
ProSolar America, 11c
Director of Operations
c. 1
On Jun 29, 2018, at 1:20 PM, Richard Kahn • wrote:
please confirm what time you will be arriving at GSJ on Monday
thank you
Richard Kahn
HBRK Associates Inc.
575 Lexington Avenue 4th Floor
New York, NY 10022
tel
fa)i
ce
On Jun 28, 2018, at 1:42 PM, Brian Prosolar < . wrote:
Afternoon Richard,
We're still trying to have a final discussion with Stefan as well as track down multiple
128MB or smaller SD cards to reboot the Sunnyboy inverters. We're moving as quickly
as we can in order to execute the conversion plan but it looks like we have to push to
Monday. Dan has shown Michael how to get the system back up and operating in the
event of it dropping of line and that is working for the interim.
Regards,
Brian Walden
c
EFTA01024339
On Jun 28, 2018, at 11:08 AM, Richard Kahn > wrote:
please confirm that you will be at GSJ tomorrow to work on the Solar
thank you
Richard Kahn
HBRK Associates Inc.
575 Lexingta Avenue 4th Floor
New York, NY 10022
to
fa
ce
On Jun 25, 2018, at 7:27 PM, Brian Prosolar < > wrote:
I want to ensure we have the PCB bypass discussion with the engineers prior to the
visit and will try to expedite.
Brian Walden
EE/RE Consultant
c..
On Jun 25, 2018, at 5:05 PM, Richard Kahn < wrote:
we are without any solar currently
can you please try to have dan come sooner
thank you
Richard Kahn
HBRK Associates Inc.
575 Lexington Avenue 4th Floor
New Y rk NY 10022
tel
fa
ce
EFTA01024340
On Jun 25, 2018, at 4:31 PM, Brian Prosolar < > wrote:
Afternoon Richard,
I have Dan on the schedule to head to GSJ on Friday.
Regards,
Brian Walden
ProSolar America, LIc
Dir. of Operations
.-- - ----
c
On Jun 25, 2018, at 3:30 PM, Richard Kahn < > wrote:
can you please advise when your men can come in and fix our solar system
thank you
Richard Kahn
HBRK Associates Inc.
575 Lexington Avenue 4th Floor
New York, NY 10022
tel
fax
cell
EFTA01024341
<401A334B1BB040DOBBA29AA3089AB844[431569].jpg>
Prosolar Systems
Caribbean: 340-201-4752
Florida: 850-222-3554
Let's Get Social
EFTA01024342
ℹ️ Document Details
SHA-256
6993930e5523f6879dd01f21165e7c1116f439b1909b9ea6ca71c6f8bf84d091
Bates Number
EFTA01024334
Dataset
DataSet-9
Type
document
Pages
9
💬 Comments 0