Zorro Ranch Projects / Tasks List 4/4/01
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
JE 2/27 Talk to Ricardo about the roof tile designs for 3/31 Per GM - GM sent Ricardo fax.
landscape beds JE discontinued the services of Ricardo
JE meeting with new designer
JE 3/30 Grading at Main house and the new road design JE to decide if the grading is correct and to
approve the way the road forks on the way
to the guest lodge
JE 3/29 Finish the Bowl Garden planting 3/29 Eden would like to plant the remainder
of plants in the bowl garden. The cost will
be $564.00. Approved 4/2 per JE
4/2 informed
JE 3/29 Petroglyph rocks moved to the main house 3/30 One rock has been brought up and
placed in the old dog yard. JE to let us
know the size, location and how many
rocks he would like.
4/2 Jeff to find larger rocks. The one rock
we have should go next to the chess set.
JE 3/30 Paddock area and stables at Main House Doug has provided sketches, how would
you like to proceed?
3/30 There has been no progress
JE Construct North Terrace at Main House Monarch is taking out the wa11s3/14
Memo from Mil sent to JE 3/19 re: paving
3/22 waiting for instructions
2/23 JE approved the $5,183.00 quote for
SORT KEY
JE- Mr. Epstein GM- Ms. Maxwell SM- DI- Decorating Issues Fe- Future Construction Issues 11Th House Manual
EFTA00578213
Zorro Ranch Projects / Tasks List 4/4/01
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
concrete. We are waiting for the 200 pieces
of stone to arrive before they can lay the
concrete. Stone should arrive in 2 weeks
April 7?
3/31 JE would like to keep the flowerbeds.
to get. to irrigate and plant
ground cover. will be out 4/7.
4/2 Bradbury has stopped work due to non-
payment.
JE 3/29 Seed the remainder of areas at Main House 3/29 Seeding can begin after May 15'h.
Cost $37,200.00
3/30 Quote sent SeedingMH.doc
4/2 to get second quote per JE
JE 3/30 What should happen with the ponderosa pine 3/31 Jeff to build dog fence around the
gravel and lights? ponderosas.
4/2 GM left message for JE approval for
$3000.00 line locator
4/2 ,fioved line locator
4/4 ordered line locater, it should
arrive 4/9 and Jeff can begin
JE 2/27 Replace all outside globe light fixtures 3/31 Advised by GM that JE asked GM to
get in touch with Ricardo but now that
Ricardo is no longer consulting she does not
think they will get the information. GM has
4-5 large catalogs in New York for JE to
look at next week.
SORT KEY 2
JE- Mr. Epstein GM- Ms. Maxwell SM- DI- Decorating Issues FC- Future Construction Issues HM- House Manual
EFTA00578214
Zorro Ranch Projects / Tasks List 4/4/01
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
JE Jeff 2/27 Purchase light fixture in UL ceiling it should tilt Jeff purchased 3/10.
and shine on easel 3/30 JE to approve light fixture
4/2 Jeff to purchase more fixtures for
approval.
JE Jeff 2/27 Purchase flood lights over terrace, MB balcony, Jeff purchased 3/10
back wall at library Jeff will ex lain installation procedure to JE
3/31 to get quote
4/2 and 4/4 Message left for Service
Electric
JE Mike 3/30 In the upper library: the paintings on either side 4/2 to have electrician wire
Jeff of the library entrance needs to have lights on the properly
bottom
JE 2/27 Purchase 52 inch picture light of the girl in the 3/30 2-23 inch lights have been put up for
princess staircase JE approval on 3/30 visit.
JE 3/30 The living room gallery painting should have 4/2 talked to Rich and he is
copper colored fixtures ordering 4 — 40" lights in bronze
Rich will call with delivery date
JE 3/31 The desert scene painting should have lights on 4/2 talked to Rich and he is
the top and bottom in the bronze color. ordering 2 — 30" bronze lights
Rich will call with delivery date
JE 3/31 The living room painting needs the same type of 4/2 talked to Rich and he is
light fixture but in black and should have a halogen ordering a black 14" fixture.
bulb. He is checking to see if a halogen bulb can
SORT KEY 3
JE- Mr. Epstein GM- Ms. Maxwell SM- DI- Decorating Issues FC- Future Construction Issues HM- House Manual
EFTA00578215
Zorro Ranch Projects / Tasks List 4/4/01
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
be used that fixture
4/2 Per Rich - they do not make halogen
lights
JE 3/5 Landscape lights for Main House All lights have been ordered. They will take
Jeff approximately 20 days from order date to
arrive. Expected April 4. left
message for electrician to call 3/19
Message left 3/26
3/28 Electrician Scheduled for April 5th
4/2 Jeff picking up lights
4/4 Electrician had knee surgery and will
not begin until 4/11
JE 3/5 Loggia spot lights not the correct size they need called Service Electric on 3/12 and 3/29
to be replaced with lower profile lights 3/15
Purchased new lights 3/24 Called Service
Electric 3/26 waiting for return call
Service Electric is coming out 3/28
Service Electric is here 3/29
Picture
4/2 JE to approve the fixtures that have
been installed on 3/30 visit
JE 2/27 Purchase picture light for the painting of the girl 3/30 2-40 inch picture lights have arrived
in the main stair hall. Order 4-30 inch lights per GM and are in .lace for JE approval.
4/2 talked to Rich and he is
ordering 2 more 40 inch gold lights
SORT KEY 4
JE- Mr. Epstein GM- Ms. Maxwell SM- DI- Decorating Issues FC- Future Construction Issues HM- House Manual
EFTA00578216
Zorro Ranch Projects / Tasks List 4/4/01
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
Rich will call with delivery date
JE 3/31 Mikes priority list MIKES PRIORTY LIST.doc updated 4/2
JE 3/30 Movie Theatre 3/30 Doug has provided sketches, how
would you like to proceed?
JE The phone lines have been repaired. Do you notice a difference?
JE Where should the telescope be located? JE to decide location.
JE Lean too and water troft should be painted Token 3/28 Sample on lean too for JE approval
brown
JE 3/24 Paint the balustrade the same color as the main 3/27 Painters have put the first coat of paint
house to make it look presentable. They will
return after visit if approved The cost will
be approximately $5,000.00.
Picture
3/30 The Italian painters are scheduled for
May. Should we hold off on painting and
wait until the painters arrive in May?
Please advise.
3/31 Leave the balustrade the existing color
i and wait for painters in May, per JE
SORT KEY 5
JE- Mr. Epstein GM- Ms. Maxwell SM- DI- Decorating Issues IT- Future Construction Issues House Manual
EFTA00578217
Zorro Ranch Projects / Tasks List 4/4/01
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
JE 2/27 Purchase rugs for the east corridor across from
dining room 4 12
/ ft wide x ?
JE 2/27 Purchase Estancia furniture
JE Entry pillars for the Main House 3/30 Ricardo has sketched a design, how
would you like to proceed?
JE Pool room mattresses 3/30 JE to decide on fabric
4/2 The mattresses have been made and are
waitiriiri Albuquerque to be covered.
JE Find snow melt that contains OJ 3/30 has located a product that is
made out of corn that will not harm stone.
4/2 JE appLoved
4/2 ordered
4/15 Should arrive at ranch
JE 2/27 There should be something that sits on the top of 3/31 JE to have a look at the heads, we
the heads in the hall near GM office have placed candles, pots, and horses per
GM
4/1 12 12/ inch candles should be purchased
per JE
JE 2/27 Mechanical room door is warped 3/23 Mike is repairing the door front 3/20
3/23
complete
JE Adam 4/2 JE to decide where the outdoor grill should be
located. Adam to purchase
SORT KEY 6
JE- Mr. Epstein GM- Ms. Maxwell SM- D1- Decorating Issues FT- Future Construction Issues Int- House Manual
EFTA00578218
Zorro Ranch Projects / Tasks List 4/4/01
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
JE Jeff 2/27 When the painting of the Spanish nude with Picture sent to JE 3/21 per his request.
black hair arrives it is to be hung in front of the Picture 3/22 I
telescope. Send picture to JE first Complete
J fi .Jeff 2/27 Purchase brown utility shed for MH A utility shed is needed to store water
softener, outdoor tools, dollies, and other
maintenance items.
There is an area staked out for JE approval.
We can purchase a pre fab building for
$7,000 or we can have Mike custom make a
building. The price would run about $4,000
depending on the design and materials used.
3/31 Mike to build per JE - send estimate
and sketch
JE Jeff 2/27 The knob on the exercise room door should be 3/15 Jeff to change door handle 3/23
Mike turned the opposite direction 3/22 Door handle has been changed. JE to
approve on 3/30 visit
JE Mike 3/8 Hang the cross in the upper library 3/22 Mike is going to look for the studs to
Jeff see if the cross can be centered.
3/28 E-Mail with hanging options was sent
3/28 We would like to wait for JE arrival
before we hang the cross it is more involved
than originally thought.
Picture
3/30 JE says that the cross is to sit on a base
and then a chain hung from the top of the
SORT KEY 7
JE- Mr. Epstein GM- Ms. Maxwell SM- DI- Decorating Issues FC- Future Construction Issues HM- House Manual
EFTA00578219
Zorro Ranch Projects / Tasks List 4/4/01
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
cross and both arms. It should hang about 6
inches from the wall.
4/3 Chain was ordered will be in 4/9. Mike
returns from vacation 4/16 and will hang
CMS
JE Mike 2/27 sketch shelves for the massage room and send to Sketch will be given to JE on his visit 3/30
JE 3/31 JE approved shelve sketch
JE 3/31 The heads in the living room gallery may need 4/2 talked to Rich and he is
to be lit. JE to confirm. ordering 4- 8" lights so JE can decide.
JE 3/13 Zorro Ranch water status Memo 3/12/01
3/7 MBI is pressure testing the lines they
should be complete 4/7. Once pressure
testing is complete, MBI will give us a
quote to put well 3&4 on line. Should Have
quote by 4/15
3/30 Gary as been traveling so we have not
received any information on desalination.
is going to use her contacts at the
university to get information on
desalinization.
Please advise if you know of anyone that
GM should call to obtain more information.
ave GM the number 4/2
4/3 called and spoke to Gene at
Ionic. He is sending info. on his company.
SORT KEY 8
JE- Mr. Epstein GM- Ms. Maxwell SM- DI- Decorating Issues FC- Future Construction Issues HM- House Manual
EFTA00578220
Zorro Ranch Projects / Tasks List 4/4/01
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
4/4 is going to meet with MBI on
4/5 to go over results of pressure testing.
JE 3/21 The garages i t the shop area at ranch central are JE to decide if they should be painted, if so
in poor shape, to get quote. what color? Cost $875.00
JE approved 3/31. They should be the same
color as house.
JE 2/25 Get estimate to repair roads Estimate sent to GM and Eric 3/13
E-mail from 3/21 not doing the roads
per JE
3/29 GM has asked us to explore other
options.
3/29 Call Larry to investigate road
equipment options to maintain roads in
usable condition.
3/30 Lany is going to look into rollers
JE 3/23 Desert Scene painting from 3/26 Mike to hang.desert painting. Picture
4/2 Should be lowered 5 inches
JE 2/27 Paint the shelves in the garage the same color as 3/5 The shelves have been painted. JE to 3/26
the walls, per JE approve on 3/30 visit
JE Ranch Central - the stables should be painted the As soon as it warms up Bobs paint can
same color as the inside begin
3/22 Samples on barn
4/4 The stain color will never match the
inside of the barn exactly because of the
SORT KEY 9
JE- Mr. Epstein GM- Ms. Maxwell SM- 01- Decorating Issues IT- Future Construction Issues 1O1- House Manual
EFTA00578221
Zorro Ranch Projects / Tasks List 4/4/01
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
7 texture.
GM 2/27 Ask Pinto about the painting design for the has sent a memo to Pinto 2/27
balustrade Memo 3/5
left message 3/7 for GM to talk to
Pinto in Europe
Memo to GM 3/19
Memo sent from GM 3/21
3/23 JE would like the balustrade painted
the same color as the house.
3/28 Requested quote from Bobs.
4/2 Waiting for painters to come in May per
JE
GM 2/27 Purchase new rug for pool gym hallway 41 x 6 3/22 GM Ordered Zebra Rug 3 weeks ago
from ABC
3/23 should arrive 3/30 er
4/4 called M and she is checking
on delis
GM Zorro pottery 3/30 is checking on shipping date
M
4/4 Should arrive in 2 weeks per
GM Make new easel crank that is larger GM to try to locate original crank
GM 3/23 Mangle ironer training at the MH 3/23 The company does not give training
because it is meant for table linens not
SORT KEY 10
JE- Mr. Epstein GM- Ms. Maxwell SM- D1- Decorating Issues IT- Future Construction Issues HM- House Manual
EFTA00578222
Zorro Ranch Projects / Tasks List 4/4/01
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
sheets. The girls will practice.
GM 2/27 Purchase rug for library bathroom 7f1 45inches Arrived and placed 3/15 pictures sent 3/15 3/15
Picture complete
GM 2/27 Purchase 15x15 rug for exercise room Arrived and placed 3/15 3/15
Picture complete
GM 3/17 We have placed 3 rugs in this area. 3/20
2/27 Purchase two more carpets for the main hall 3/17 Pictures have been sent for GM complete
downstairs they should duplicate the one that is approval.
existing but with brighter colors Approved and in place 3/20
3/21 pictures sent to . Pictures
3/31 The rugs are not correct per JE
4/2 GM to provide return info.
4/2 GM to purchase correct rugs?
GM Need extra sheets for the guest bedrooms at the main 3/29
house (yellow and blue rooms) complete
GM 2/27 Take digital .hotos of the furniture shipment Shipment arrived 3/7 3/30
that arrives from Digital photos sent to GM 3/7 to ask for complete
placement instructions
Photos send 3/17
GM 2/27 The guest hall needs more photographs 3/30 Will arrive in 2 weeks-April 12th per 4/12
GM
SORT KEY 1I
JE- Mr. Epstein GM- Ms. Maxwell SM- DI- Decorating Issues EC- Future Construction Issues House Manual
EFTA00578223
Zorro Ranch Projects / Tasks List 4/4/01
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
GM GM to send black and white pictures for frames in Photo dimensions 22 x 15 % inches 4/19
upper library 3/30 Should arrive in 3 weeks-4/I9 per GM
GM 2/27 Larger photos are need for the garage 3/30 Should arrive in 3 weeks per GM 4/19
GM 3/31 Replace glass in UL painting per GM 4/4 Which painting needs glass is
not sure.
GM 4/2 Library shelf dimensions:
4 Shelves at: Width 361/2 x H 71/2 x D 12''A
12 Shelves at: Width 35 'A x H7 % x D12 'A
2 Shelves at: Width 55 'A x H7'/ x D12 'A
DI Pinto Curtains for the arches in the hallway in front of the Dimensions sent to Pinto 3/21
living room 3/30 has been shipped per GM
DI Pinto 3/30 Curtains for the pool room doors 3/30 Fabric has been shipped, to
have curtains made per GM
DI Pinto Replacement plate for estancia wall 3/30 has been shipped per GM 4/12
DI Pinto Light fixture to replace 2 in JE and GM master bdrm 3/30 has been shipped per GM 4/12
hall
Mike Pole barn enclosure We can only work on the pole barn in the
mornings because the wind picks up in the
afternoon.
SORT KEY 12
JE- Mr. Epstein GM- Ms. Maxwell SM- DI- Decorating Issues FC- Future Construction Issues HM- House Manual
EFTA00578224
Zorro Ranch Projects / Tasks List 4/4/01
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
3/21 Mike has % the siding on
3/30 Mike has' of the siding up
Pictures
3/30 Electrician to put sockets behind paintings in the 4/2 left message with Service
UL Electric.
4/4 Message
Seal the log cabin 4/2 Bob's paint will begin as soon as 4/10
weather permits
David 3/15 Remove remainder of the cactus piles on the 3/30 David will begin mid April 6/1
ranch
Deidre 3/15 Purchase emergency kits for each vehicle ordering 3/28
Will arrive 4/12
Deidre 3/31 Painting in UL of the alley should be cleaned 4La is making calls to find someone
that will clean paintings
HM Tamera and Jeff should be in the house when JE GM Advised Tamera and Jeff 4/2
arrive
HM All the lights in the main house should be on Advised Tamera and Jeff 3/31
throughout the day.
HM Duke should be in the house when they arrive Advised Tamera and Jeff 3/30
SORT KEY 13
JE- Mr. Epstein GM- Ms. Maxwell SM- DI- Decorating Issues IT- Future Construction Issues House Manual
EFTA00578225
Zorro Ranch Projects / Tasks List 4/4/01
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
7 HM 3/12 Advised Jeff not to take dogs during a visit 3/15/
Add to household manual complete
HM Advise Tamera that there needs to be water and food 3/15
for Max at all times. Add details to house hold complete
manual
Jeff The stakes for the MH drive should be 24 inches and Jeff will begin 4/1
have flat tops. Around the curves they should get 4/2 Jeff will begin after ponderosa pine
closer together. They should have whiter square fence is approved
reflectors
Jeff 3/28 Jeff to power wash the diamonds in the front
motor court
Jeff The two masks should go on the plane to 65th street 4/2 Complete 4/2
complete
Jeff 3/31 The statue in the garage belongs on the mantel 4/4 Jeff working on.
in the dining room. The plates are to be hung on the
fireplace. Pictures sent to JE when complete
Jeff Jeff to measure the pool doors at the main house for Measured and faxed to Gary 3/13 3/13
Gary Complete
Jeff CD player is being repaired Picked up 3/13 3/13
complete
Jeff 2/27 When the large chess set arrives it belongs in the Arrived 3/8 will be placed 3/16 3/16
north garden complete
SORT KEY 14
JE- Mr. Epstein GM- Ms. Maxwell SM- DI- Decorating Issues FC- Future Construction Issues HM- House Manual
EFTA00578226
Zorro Ranch Projects / Tasks List 4/4/01
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
Jeff 3/28The stack of wood near the microwave dish Advised Jeff 3/27 3/28
needs to be relocated for the visit 3/29
complete
Larry Larry is ordering TV for breakfast room TV arrived 3/7 3/8
complete
3/14 Take down the TV screen in the bunkhouse 3/30 to begin after Pole barn 4/4
living rrn and put into storage complete
3/14 Hang ranch blueprints in garage 4/4
complete
4/2 Talk to re:line locator 4/4
complete
Talk to re: seed prices for MH 4/4 is getting prices
Clutch on the water truck is broken Truck taken to be repaired should return 3/17
3/23 com . lete
Manoltio 2/28 Larry to purchase John Deer Gator for the ranch 3/28 to see if we can purchase one
Larry in N.M.
4/4 Eric will send a check to NM
Mike Mike to make bases for library vestibule tables
Mike 2/27 make 2 10 ft benches out of the timbers for the 4/2 Mike is working on the benches
loggia
SORT KEY 15
JE- Mr. Epstein GM- Ms. Maxwell SM- DI- Decorating Issues FC- Future Construction Issues HM- House Manual
EFTA00578227
Zorro Ranch Projects / Tasks List 4/4/01
PROJ.
SORT ASSIGN. DATE & DESCRIPTION
ℹ️ Document Details
SHA-256
3026bfd6d6413d3a838b5ef319d08f7ebdf7ddeb6379143f81d2561f8c44d827
Bates Number
EFTA00578213
Dataset
DataSet-9
Document Type
document
Pages
23
Comments 0