Zorro Ranch Projects / Tasks List PROJ. SORT ASSIGN. DATE & DESCRIPTION STATUS COMP. TO DATE JE 3/13 Zorro Ranch water status Memo 3/12/01 3/7 MBI is pressure testing the lines they should be complete 4/7. Once pressure testing is complete, MBI will the us a quote to put well 3&4 on line. to meet with MBI the week of 4/1 to go over money saving ideas. JE Mike Jeff 3/8 Hang the cross in the upper library 3/22 Mike is going to look for the studs to see if the cross can be centered. 3/28 E-Mail with hanging options will be sent 3/28 We would like to wait for JE arrival before we hang the cross it is more involved than originally thought. ..1WINDOWS\DesktoplCamera pics.)1cross.JPG JE Mike 2/27 sketch shelves for the massage room and send to JE JE Jeff Mike 2/27 The screw that is on the exercise room door Jeff to replace door handle 3/15 3/23 knobs should be filed down 3/22 Jeff has put the handle on the door for complete JE approval SORT KEY JE- Mr. Epstein GM- Ms. Maxwell SM- DI- Decorating Issues FT- Future Construction Issues HM- House Manual EFTA00578197 Zorro Ranch Projects / Tasks List PROJ. SORT ASSIGN. DATE & DESCRIPTION STATUS COMP. TO DATE JE Jeff 2/27 The lights on the LR mantel are too tall find low Purchased 3/9. The new lights are not profile lights strong enough to light up the painting. Need more instructions. JE Jeff 2/27 The LR gallery painting should have two lights Jeff said that he could not find lights that mounted on the table that will shine on the painting. would mount on the table. Please advise if a The lights should be similar to the ones on the LR cord across the floor is acceptable. mantel. Sendpictures fora roval JE Jeff Landscape lights for Main House All lights have been ordered. They will take approximately 20 days from order date to arrive. Expected April 4. left message for electrician to call 3/19 Message left 3/26 3/28 Scheduled for April 5th JE Jeff 2/27 When the painting of the Spanish nude with Picture sent to JE 3/21 per his request black hair arrives it is to be hung in front of the 3/22 telesco Sendpicture to JE first Com lete JE Jeff 2/27 Purchase light fixture in UL ceiling to tilt and Jeff purchased 3/10. Jeff is going to see if shine on easel he can install himself 3/15 3/29 Jeff is going to purchase 3 fixtures for JE approval JE Jeff 2/27 Purchase flood lights over terrace, MB balcony, Purchased 3/9. Will be installed with back wall at library landscape lights 3/26 =. Called Service Electric to get installation date —waiting for call back Service Electric will be out 3/28 SORT KEY 2 JE- Mr. Epstein GM- Ms. Maxwell SM- DI- Decorating Issues IT- Future Construction Issues HM- House Manual EFTA00578198 Zorro Ranch Projects / Tasks List PROJ. SORT ASSIGN. DATE & DESCRIPTION STATUS COMP. TO DATE Service Electric is here 3/29 The installation will be very involved, JE to approve. Jeff has details. JE Where should the telescope be located? JE to decide location. JE Lean too and water troft should be painted Token Sample on lean too for JE approval brown JE 2/27 Mechanical room door is warped 3/23 Mike is repairing the door front 3/20 3/23 complete JE Construct North Terrace at Main House Monarch is t iLgi1 out the wa11s3/14 Memo from = sent to JE 3/19 re: paving 3/22 waiting for instructions 2/23 JE approved the $5,183.00 quote for concrete. We are waiting for the 200 pieces of stone to arrive before they can lay the concrete. Stone should arrive in 2 weeks April 7? JE 3/24 Paint the balustrade the same color as the main 3/26 Painters are on site house 3/27 Painting on a time and materials basis. Estimate $5,000.00. JE to approve 3/27 Painters have put the first coat of paint to make it look presentable. They will return after visit if anproved SORT KEY 3 JE- Mr. Epstein GM- Ms. Maxwell SDI- DI- Decorating Issues Fe- Future Construction Issues House Manual EFTA00578199 Zorro Ranch Projects / Tasks List PROJ. SORT ASSIGN. DATE & DESCRIPTION STATUS COMP. TO DATE JE 3/29 Finish the Bowl Garden planting 3/29 Eden would like to plant the remainder of plants in the bowl garden. The cost will be $564.00 JE to approve. 3/21 Quote to repaint the gray garage doors in shop 3/23 Will cost $875.00 area at ranch central JE to approve JE Loggia spot lights not the correct size they need to be called Service Electric on 3/12 and 3/29 replaced with lower profile lights 3/15 complete Purchased new lights 3/24 Called Service Electric 3/26 waiting for return call Service Electric is coming out 3/28 Service Electric is here 3/29.AWIND0WS1DesktoplCamera pics.)11ozzia light.JPCi JE 3/29 Eden to give quote to seed the remainder of 3/29 Seeding can begin after May 15th. areas at Main House Should have quote 3/30 GM Jeff 2/27Research auto pool vac Requesting your approval to purchase pool vac for $549.00 GM Jeff 2/27 Purchase brown utility shed for MH 3/12 has brochures, Jeff to stake out proposed area. 3/22 has been staked for approval GM Deidre 3/12 Train Wolfhounds and Duke???? 3/28 The cost is 63.50 for each dog. The classes are for 8 weeks, once a week. Waiting for GM approval. Does Duke need to go? SORT KEY 4 JE- Mr. Epstein GM- Ms. Maxwell SM- DI- Decorating Issues IT- Future Construction Issues HM- House Manual EFTA00578200 Zorro Ranch Projects / Tasks List PROJ. SORT ASSIGN. DATE & DESCRIPTION STATUS COMP. TO DATE GM 2/27 Ask Pinto about the painting design for the has sent a memo to Pinto 2/27 balustrade Memo 3/5 left message 3/7 for GM to talk to Pinto in Europe Memo to GM 3/19 Memo sent from GM 3/21 3/23 JE has approved same color as the house. 3/28 Requested quote from Bobs. See painting status page 3 GM 2/27 There should be something that sits on the top of GM to buy candles or something the heads in the hall near GM office appropriate GM 3/17 We have placed 3 rugs in this area. 3/20 2/27 Purchase two more carpets for the main hall 3/17 Pictures have been sent for GM complete downstairs they should duplicate the one that is approval. existing but with brighter colors Approved and in place 3/20 GM 2/27 The guest hall needs more photographs GM 2/27Talk to Ricardo about the roof tile designs for GM sent Ricardo fax. landscape beds JE discontinued the services of Ricardo JE meeting with new designer GM 2/27 Purchase 70 inch picture light is needed for the 3/23 Mike and Jeff ling lights 4-30 painting of the girl in the main stair hall. Order 4 30 inch lights. Spoke to 3/23 and will inch lights per GM send pictures. SORT KEY 5 JE- Mr. Epstein GM- Ms. Maxwell SM- DI- Decorating Issues FT- Future Construction Issues Int- House Manual EFTA00578201 Zorro Ranch Projects / Tasks List PROJ. SORT ASSIGN. DATE & DESCRIPTION STATUS COMP. TO DATE 3/20 Installed one set of 30 inch lights. Waiting for GM/JE approval GM 2/27 Purchase 52 inch picture light of the girl in the princess staircase GM 2/27 Purchase light for the painting in the LR gallery 3/23 Mike and Jeff hanging lights 2-40inch. should be 80 inches Spoke to 3/23 and wills send p ictures GM 2/27 Purchase rug for library bathroom 7ft 45inches Arrived and placed 3/15 pictures sent 3/15 3/15 complete GM 2/27 Purchase rug for basement (end of the main stair hall) GM 2/27 Purchase 15x15 rug for exercise room Arrived and placed 3/15 3/15 complete GM 2/27 Purchase rugs for the east corridor 4 Y2 ft wide x ? The rugs should follow down the hallway upstairs GM 2/27 Purchase new rug for pool gym hallway 41 x 6 3/22 GM Ordered Zebra Rug 3 weeks ago from ABC 3/23 should arrive 3/30 per GM 2/27 Purchase Estancia furniture GM Zorro pottery SORT KEY 6 JE- Mr. Epstein GM- Ms. Maxwell SM- DI- Decorating Issues FC- Future Construction Issues HM- House Manual EFTA00578202 Zorro Ranch Projects / Tasks List PROJ. SORT ASSIGN. DATE & DESCRIPTION STATUS COMP. TO DATE GM GM to send black and white pictures for frames in Photo dimensions 22 x 15' inches upper library GM 2/27 Larger photos are need for the garage GM 2/27 Replace all globe light fixtures GM 2/27 Take digital photos of the furniture shipment Shipment arrived 3/7 that arrives from Leah's Digital photos sent to GM 3/7 to ask for placement instructions Photos send 3/17 GM Need extra sheets for the guest bedrooms at the main house (yellow and blue rooms) GM 3/21 Three rugs have arrived for the main house 3/21 pictures sent to 3/21 3/22 Need to know location 3/22 Have been placed in basement near complete elevator..\WINDOWS\DesktopCamera pics.riruu in elevator areal.JPG GM Make new easel crank that is larger GM to try to locate original crank GM 3/23 Mangel ironer training at the MH 3/23 The company does not give training because it is meant for table linens not sheets. The girls will practice. Does GM want us to pursue further? SORT KEY 7 JE- Mr. Epstein GM- Ms. Maxwell SM- DI- Decorating Issues FC- Future Construction Issues HM- House Manual EFTA00578203 Zorro Ranch Projects / Tasks List PROJ. SORT ASSIGN. DATE & DESCRIPTION STATUS COMP. TO DATE DI Pinto Replacement plate for estancia wall DI Pinto Light fixture to replace 2 in JE and GM master bdrm hall DI Pinto Sheer curtains for the arches in the hallway in front Dimensions sent to Pinto 3/21 of the living room HM Advise Tamera that there needs to be water and food 3/15 for Max at all times. Add details to house hold complete manual HM 3/12 Advised Jeff not to take dogs during a visit 3/15/ Add to household manual complete 2/28 Fix the crumbling column in the estancia arranged for Les Files to come out in 3/29 April — it needs to warm up. complete Adrian is repairing 3/28 2/27 Give Jeff note book for JE walk throughs 3/15 complete 2/27 Frame the island pictures Pictures taken to Absolute Framing on 3/8 3/29 Expect completion 3/29 2/27 Have someone repair green fountain tiles Vernon tiles will come out in April to repair tiles. It needs to warm up Have Western Systems come out to install sound Sound system arrived 3/22 3/28 system when it arrives for Breakfast rm 3/23 Western Systems will be out Friday complete SORT KEY 8 JE- Mr. Epstein GM- Ms. Maxwell SM- DI- Decorating Issues IT- Future Construction Issues HM- House Manual EFTA00578204 Zorro Ranch Projects / Tasks List PROJ. SORT ASSIGN. DATE & DESCRIPTION STATUS COMP. TO DATE 3/30 to install Has been installed but the remote is not working so Western Systems is trying to troubleshoot 3/28 3/28 New Remote has arrived Mike is ro min 2/27 Purchase alarm clocks for guest bedrooms MH 4 have been purchased still need 2 more 3/22 and guest lodge Total of 6 (Blue rm and 1 for guest lodge) Complete Blue Mobile home to be moved to gravel pit Electric disconnected 3/13 3/14 Phone disconnected 3/13 Complete 2/27 Have the courtyard tree lights repaired Fixed 3/10 — Transformer was out 3/10 complete 2/26 Get a price on the butternut carpet sample for will be out to measure bunkhouse to the bunkhouse give an estimate2/26 Will have prices 3/27 for GM approval has prices for GM 3/29 2/25 Get estimate to repair roads Estimate sent to GM and Eric 3/13 E-mail from 3/21 not doing the roads per JE GM has asked us to explore other options. Call Larry to investigate road equipment options to maintain roads in usable condition. SORT KEY 9 JE- Mr. Epstein GM- Ms. Maxwell SM- DI- Decorating Issues FC- Future Construction Issues HM- House Manual EFTA00578205 Zorro Ranch Projects / Tasks List PROJ. SORT ASSIGN. DATE & DESCRIPTION STATUS COMP. TO DATE 3/15 Repair stone diamonds in front motor court at Masons are working on the repairs 3/15 3/22 MH Pictures sent to JE, GM, SM complete 3/28..1WINDOWS1DesktoplCamera ics. \motor court stoneworkl.JPG Repair transmitting station for wells. (controls the 3/20 Val Comm to give a proposal to repair water level in the tank) or replace transmitters 3/23 Desert Scene painting from Leah's 3/26 Mike to 3/20 Hang.AWINDOWS1DesktoplCamera complete pics.)1desert paintink.JPG Hook up voice mail to GM line 832 1746 3/23 Val Comm is going to hook up the voice mail because it is on a microwave line 3/28 should be on by Monday 4/1 3/28 Shana to purchase answering machine for GM to use until voice mail is hooked up Main House phone lines have interference and poor Val Comm and Sawyers are trouble 3/29/01 reception shooting problems. 3/28 Sawyers is Fed complete Exing a new CPU card. 3/28 Val-com and Sawyers are reprogramming the system 3/29 Complete. They had to reprogram the entire system Tom said there may be a few "bugs" over the next few days. The phone lines seem clear. Mike Mike to make bases for library vestibule tables SORT KEY I0 JE- Mr. Epstein GM- Ms. Maxwell SM- DI- Decorating Issues EC- Future Construction Issues House Manual EFTA00578206 Zorro Ranch Projects / Tasks List PROJ. SORT ASSIGN. DATE & DESCRIPTION STATUS COMP. TO DATE Mike 2/27 make 2 10 ft benches out of the timbers for the loggia Mike 2/27 Change cords on the light in the library 3/5 Service Electric changed one cord Mike vestibule to a black one to change the second Mike Order steam room door sweeps Mike has installed the sat but the still are not the correct size. is working on locating sweeps 3/19 3/21 Piece being shipped from Denver 3/28 Digital pictures sent to Mike Build Motor court gates at MH Gates have been built will be hung 3/20 3/20 Mike is working on the pole barn — weather complete is good so gates on hold.WINDOWS DesktoplCamera pies.Mate.JPG Mike Red doors into tables Mike Sand and seal tables and benches for the main house Mike Guest lodge — repair crawl space enclosure Mike Chicken coop to be moved to area near stabels SORT KEY 11 JE- Mr. Epstein GM- Ms. Maxwell SM- DI- Decorating Issues FC- Future Construction Issues HM- House Manual EFTA00578207 Zorro Ranch Projects / Tasks List PROJ. SORT ASSIGN. DATE & DESCRIPTION STATUS COMP. TO DATE 7 Mike Screen doors to be repaired at bunkhouse, Shannons house and office Mike Ventilation at pump pit for ranch central Mike Repair French doors at Bunkhouse Mike 2/27 Cover hole in wall under the yellow bedroom 3/20 sink at MH complete Mike Estancia pews Mike received JE instructions 3/14 Mike Close in Sterilizer Mike Pole barn enclosure We can only work on the pole barn in the mornings because the wind picks up in the afternoon. Mike has 'A the siding on 3/21 3/30 Mike has Y4 of the siding up.AWINDOWS\DesktoplCamera pics.11pole bam.JPG Mike The guest lodge sliding glass door does not lock SORT KEY 12 JE- Mr. Epstein GM- Ms. Maxwell SM- DI- Decorating Issues FC- Future Construction Issues HM- House Manual EFTA00578208 Zorro Ranch Projects / Tasks List PROJ. SORT ASSIGN. DATE & DESCRIPTION STATUS COMP. TO DATE Manoltio 2/28 Lany to purchase John Deer Gator for the ranch 3/28 to see if we can purchase one Larry in N.M. 3/14 Take down the TV screen in the bunkhouse living nn and put into storage 3/14 Hang ranch blueprints in garage Clutch on the water truck is broken Truck taken to be repaired should return 3/17 3/23 complete Lany Larry is ordering TV for breakfast room TV arrived 3/7 3/8 complete Jeff Jeff to measure the pool doors at the main house for Measured and faxed to Gary 3/13 3/13 Gary Complete Jeff CD player is being repaired Picked up 3/13 3/13 complete Jeff The stakes for the MH drive should be 24 inches and have flat tops. Around the curves they should get closer together. They should have whiter square reflectors Jeff 3/28 Jeff to power wash the diamonds in the front motor court Jeff 3/28The stack of wood near the microwave dish Advised Jeff 3/27 3/28 needs to be relocated for the visit 3/29 SORT KEY 13 JE- Mr. Epstein GM- Ms. Maxwell SM- DI- Decorating Issues IT- Future Construction Issues House Manual EFTA00578209 Zorro Ranch Projects / Tasks List PROJ. SORT ASSIGN. DATE & DESCRIPTION STATUS COMP. TO DATE 7 complete Deidre 3/15 Purchase emergency kits for each vehicle ordering 3/28 David 3/15 Remove remainder of the cactus on the ranch 3/30 David will begin mid April 6/1 Build 3 17x 20 frames and 3 17x22 inch frames made 3/30 advised that GM wants out of dark wood to locate a photo shop to make frames 2/27 When the large chess set arrives it belongs in the Arrived 3/8 will be placed 3/16 3/16 north garden complete 2/27 Check telephone in exercise room The house is not wired for a telephone in 3/9 the massage room - plate to be installed complete over circuit and Bobs paint to touch up Shana Find snow melt that contains OJ 3/30 advised high priority Shana will begin April 1 SORT KEY 14 JE- Mr. Epstein GM- Ms. Maxwell SM- DI- Decorating Issues Fe- Future Construction Issues House Manual EFTA00578210 Zorro Ranch Projects / Tasks List PROJ. SORT ASSIGN. DATE & DESCRIPTION STATUS COMP. TO DATE 7 urns to be sent back to NY when delivered to Shipped 3/6 to 71st street 3/6 the ranch complete Assemble balustrade at main house They are caulking the balustrade 3/14 will 3/27 take 2 weeks to finish weather permitting complete Paint large ranch house 3/15 the house is half painted weather 3/20 permitting should be complete 3/20 complete Ranch Central - the stables should be painted the As soon as it warms up Bobs paint can same color as the inside begin 3/22 Sam les on barn 2/27 Paint he shelves in the garage the same color as Bobs paint will be out the week of the 19th 3/26/ the walls of March. Complete 3/27 Elevator lights are not working 3/29 Service Electric has repaired 3/29/01 complete SORT KEY 15 JE- Mr. Epstein GM- Ms. Maxwell SM- DI- Decorating Issues Fe- Future Construction Issues HM- House Manual EFTA00578211 Zorro Ranch Projects / Tasks List PROJ. SORT ASSIGN. DATE & DESCRIPTION STATUS COMP. TO DATE 7 SORT KEY 16 JE- Mr. Epstein GM- Ms. Maxwell SM- DI- Decorating Issues FC- Future Construction Issues HM- House Manual EFTA00578212
ℹ️ Document Details
SHA-256
1b7972af61e6a2033681434556c8cea0c58252268b335c8b9dc79bd1d327a9b7
Bates Number
EFTA00578197
Dataset
DataSet-9
Document Type
document
Pages
16

Comments 0

Loading comments…
Link copied!