Zorro Ranch Projects / Tasks List
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
JE 3/13 Zorro Ranch water status Memo 3/12/01
HM Advise Tamera that there needs to be water and food 3/15
for Max at all times. Add details to house hold complete
manual
3/21 Quote to repaint garage doors in shop area 3/23 Will cost $875.00 will show GM JE
when they arrive 3/30
2/28 Fix the crumbling column in the estancia Alice arranged for Les Files to come out in 3/29
April — it needs to warm up. complete
Adrian is re airin 3/28
2/27 Give Jeff note book for JE walk throughs 3/15
complete
2/27 Frame the island pictures Pictures taken to Absolute Framing on 3/8 3/29
Expect completion 3/29
2/27 Have someone repair green fountain tiles Vernon tiles will come out in April to repair
tiles. It needs to warm up
Have Western Systems come out to install sound Sound system arrived 3/22 3/28
system when it arrives for Breakfast rm 3/23 Western Systems will be out Friday complete
3/30 to install
Has been installed but the remote is not
working so Western Systems is trying to
SORT KEY 1
JE- Mr. Epstein GM- Ms. Maxwell DI- Decorating Issues FC- Future Construction Issues HM- House Manual
EFTA00578182
Zorro Ranch Projects / Tasks List
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
troubleshoot 3/28
3/28 New Remote has arrived Mike is
ro ramming
Loggia spot lights not the correct size they need to be called Service Electric on 3/12 and
replaced with lower profile lights 3/15
Purchased new lights 3/24 Called Service
Electric 3/26 waiting for return call
Service Electric is coming out 3/28
Service Electric is here 3/30
2/27 Purchase alarm clocks for guest bedrooms MH 4 have been purchased still need 2 more 3/22
and guest lodge Total of 6 (Blue rm and 1 for guest lodge) Complete
Blue Mobile home to be moved to gravel pit Electric disconnected 3/13 3/14
Phone disconnected 3/13 Complete
2/27 Have the courtyard tree lights repaired Fixed 3/10 — Transformer was out 3/10
complete
2/26 Get a price on the butternut carpet sample for Sue will be out to measure bunkhouse to
the bunkhouse give an estimate2/26
Will have prices 3/27 for GM approval
2/25 Get estimate to repair roads Estimate sent to GM and Eric 3/13
E-mail from 3/21 not doing the roads
per JE
GM has asked us to explore other options.
Call Larry to investigate road equipment
options to maintain roads in usable
SORT KEY 2
JE- Mr. Epstein GM- Ms. Maxwell MI- DI- Decorating Issues FC- Future Construction Issues HM- House Manual
EFTA00578183
Zorro Ranch Projects / Tasks List
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
7 condition.
3/15 Repair stone diamonds in front motor court at Masons are working on the repairs 3/15 3/22
MH complete
Repair transmitting station for wells. (controls the 3/20 Val Comm to give a proposal to repair
water level in the tank) or replace transmitters
3/23 Desert Scene painting from Leah's 3/26 Mike to Hang 3/20
complete
Hook up voice mail to GM line 832 1746 3/23 Val Comm is going to hook up the
voice mail because it is on a microwave line
3/28 should be on by Monday 4/1
3/28 to purchase answering machine
for GM to use until voice mail is hooked u
DI Pinto Replacement plate for estancia wall
DI Pinto Light fixture to replace 2 in JE and GM master bdrm
hall
DI Pinto Sheer curtains for the arches in the hallway in front Dimensions sent to Pinto 3/21
of the living room
JE Mike Jeff 3/8 Hang the cross in the upper library 3/22 Mike is going to look for the studs to
see if the cross can be centered. E-Mail with
hanging options will be sent
SORT KEY 3
JE- Mr. Epstein GM- Ms. Maxwell DI- Decorating Issues FC- Future Construction Issues HNI- House Manual
EFTA00578184
Zorro Ranch Projects / Tasks List
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
3/283/22.WINDOWS1DesktoplCamera
pics.11cross.JPG
JE Mike 2/27 sketch shelves for the massage room and send to
JE
Mike Mike to make bases for library vestibule tables
Mike 2/27 make 2 10 ft benches out of the timbers for the
loggia
Mike 2/27 Change cords on the light in the library 3/5 Service Electric changed one cord Mike
vestibule to a black one to change the second
Mike Order steam room door sweeps Mike has installed the sweeps but the still
are not the correct size. Alice is working on
locating sweeps 3/19
3/21 Piece being shipped from Denver
3/28 Di ital .ictures sent to Alice
Mike Build Motor court gates at MH Gates have been built will be hung 3/20 3/20
Mike is working on the pole barn — weather complete
is good so gates on hold
Mike Red doors into tables
Mike Sand and seal tables and benches for the main house
SORT KEY 4
JE- Mr. Epstein GM- Ms. Maxwell MI- DI- Decorating Issues FC- Future Construction Issues HM- House Manual
EFTA00578185
Zorro Ranch Projects / Tasks List
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
7 Mike Guest lodge — repair crawl space enclosure
Mike Chicken coop to be moved to area near stabels
Mike Screen doors to be repaired at bunkhouse, Shannons
house and office
Mike Ventilation at pump pit for ranch central
Mike Repair French doors at Bunkhouse
Mike 2/27 Cover hole in wall under the yellow bedroom 3/20
sink at MH complete
Mike Estancia pews Mike received JE instructions 3/14
Mike Close in Sterilizer
Mike Pole barn enclosure We can only work on the pole barn in the
mornings because the wind picks up in the
afternoon. Mike has 12/ the siding on 3/21
3/30 Mike has % of the siding up
SORT KEY 5
JE- Mr. Epstein GM- Ms. Maxwell DI- Decorating Issues FC- Future Construction Issues HM- House Manual
EFTA00578186
Zorro Ranch Projects / Tasks List
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
7 Mike The guest lodge sliding glass door does not lock
Manolito 3/14 Take down the TV screen in the bunkhouse
living nn and put into storage
Manolito 3/14 Hang ranch blueprints in garage
Manolito Clutch on the water truck is broken Truck taken to be repaired should return 3/17
3/23 complete
Lany Larry is ordering TV for breakfast room TV arrived 3/7 3/8
complete
JE Jeff Mike 2/27 The screw that is on the exercise room door Jeff to replace door handle 3/15 3/23
knobs should be filed down 3/22 Jeff has put the handle on the door for complete
JE approval
JE Jeff 2/27 The lights on the LR mantel are too tall find low Purchased 3/9. The new lights are not
profile lights strong enough to light up the painting. Need
more instructions.
JE Jeff 2/27 The LR gallery painting should have two lights Jeff said that he could not find lights that
mounted on the table that will shine on the painting. would mount on the table. Please advise if a
The lights should be similar to the ones on the LR cord across the floor is acceptable.
mantel. Send pictures for approval
JE Jeff Landscape lights for Main House All lights have been ordered. They will take
approximately 20 days from order date to
arrive. Expected April 4. left
SORT KEY 6
JE- Mr. Epstein GM- Ms. Maxwell DI- Decorating Issues FC- Future Construction Issues HM- House Manual
EFTA00578187
Zorro Ranch Projects Tasks List
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
message for electrician to call 3/19
Message left 3/26
3/28 Scheduled for April 5th
JE Jeff 2/27 When the painting of the Spanish nude with Picture sent to JE 3/21 per his request
black hair arrives it is to be hung in front of the 3/22
telescope. Send picture to JE first Complete
JE Jeff 3/28 Jeff to give proposal on hanging cross 3/28Proposal sent to GM and on 3/28.
3/29 we would like to wait for JE
instructions before we hang cross, it is more
involved then ex ected
GM Jeff 2/27Research auto pool vac Requesting your approval to purchase pool
vac for $549.00
GM Jeff 2/27 Purchase brown utility shed for MH 3/12 has brochures, Jeff to stake
out proposed area.
3/22 has been staked for approval
Jeff 2/27 Purchase light fixture in UL ceiling to tilt and Jeff purchased 3/10. Jeff is going to see if
shine on easel he can install himself 3/15
3/29 Jeff is going to purchase 3 fixtures for
JE a royal
Jeff 2/27 When the painting of the dessert scene arrives it 3/22
is to be hun o osite the telesco in the UL com lete
Jeff Jeff to measure the pool doors at the main house for Measured and faxed to Gary 3/13 3/13
Gary Complete
SORT KEY 7
JE- Mr. Epstein GM- Ms. Maxwell DI- Decorating Issues FC- Future Construction Issues HM- House Manual
EFTA00578188
Zorro Ranch Projects / Tasks List
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
7 Jeff CD player is being repaired Picked up 3/13 3/13
complete
Jeff The stakes for the MH drive should be 24 inches and
have flat tops. Around the curves they should get
closer together. They should have whiter square
reflectors
Jeff 2/27 Purchase flood lights over terrace, MB balcony, Purchased 3/9. Will be installed with
back wall at library landscape lights
3/26 Shan. Called Service Electric to get
installation date —waiting for call back
Service Electric will be out 3/28
Service Electric is here 3/29
Jeff 3/28 Jeff to power wash the diamonds in the front
motor court
Jeff 3/28The stack of wood near the microwave dish Advised Jeff 3/27 3/28
needs to be relocated for the visit 3/29
com lete
GM 3/12 Train Wolfhounds and Duke???? 3/28 The cost is 63.50 for each dog. The
classes are for 8 weeks, once a week.
Waiting for GM approval. Does Duke need
to go?
3/15 Purchase emergency kits for each vehicle Manolito ordering 3/28
SORT KEY 8
JE- Mr. Epstein GM- Ms. Maxwell DI- Decorating Issues FC- Future Construction Issues HM- House Manual
EFTA00578189
Zorro Ranch Projects / Tasks List
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
David 3/15 Remove remainder of the cactus on the ranch 3/30 David will begin mid April 6/1
JE Where should the telescope be located? JE to decide location.
JE Lean too and water troft should be painted Token Sample on lean too for JE approval
brown
JE 2/27 Mechanical room door is warped 3/23 Mike is repairing the door front 3/20
3/23
complete
JE Construct North Terrace at Main House Monarch is taking out the walls3/14
Memo from Alice sent to JE 3/19 re: paving
3/22 waiting for instructions
2/23 JE approved the $5,183.00 quote for
concrete. We are waiting for the 200 pieces
of stone to arrive before they can lay the
concrete. Stone should arrive in 2 weeks
April 7?
JE 3/24 Paint the balustrade the same color as the main 3/26 Painters are on site
house Painting on a time and materials basis.
HM 3/12 Advised Jeff not to take dogs during a visit 3/15/
Add to household manual complete
GM 2/27 Ask Pinto about the painting design for the has sent a memo to Pinto 2127
balustrade Memo 3/5
SORT KEY 9
JE- Mr. Epstein GM- Ms. Maxwell M- DI- Decorating Issues FC- Future Construction Issues MI- House Manual
EFTA00578190
Zorro Ranch Projects / Tasks List
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
left message 3/7 for GM to talk to
Pinto in Europe
Memo to GM 3/19
Memo sent from GM 3/21
3/23 JE has approved same color as the
house. 3/28 Requested quote from Bobs.
GM 2/27 There should be something that sits on the top of GM to buy candles or something
the heads in the hall near GM office appropriate
GM 3/17 We have placed 3 rugs in this area. 3/20
2/27 Purchase two more carpets for the main hall 3/17 Pictures have been sent for GM complete
downstairs they should duplicate the one that is approval.
existing but with brighter colors Approved and in place 3/20
GM 2./27 The guest hall needs more photographs
GM 2/27Talk to Ricardo about the roof tile designs for Gm sent Ricardo fax.
landscape beds JE discontinued the services of Ricardo
JE meeting with new designer
GM 2/27 Purchase 70 inch picture light is needed for the 3/23 Mike and Jeff hanging lights 4-30 inch
painting of the girl in the main stair hall. Order 4 30 lights. Spoke to 3/23 and will send
inch lights per GM pictures.
3/20 Installed one set of 30 inch lights.
Waiting for GM/JE approval
SORT KEY 10
JE- Mr. Epstein GM- Ms. Maxwell DI- Decorating Issues FC- Future Construction Issues NM- House Manual
EFTA00578191
Zorro Ranch Projects / Tasks List
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
GM 2/27 Purchase 52 inch picture light of the girl in the
princess staircase
GM 2/27 Purchase light for the painting in the LR gallery 3/23 Mike and Jeff hanging lights 2-40inch.
should be 80 inches Spoke to 3/23 and wills send pictures
GM 2/27 Purchase rug for library bathroom 7ft 45inches Arrived and placed 3/15 pictures sent 3/15 3/15
complete
GM 2/27 Purchase rug for basement (end of the main stair
hall)
GM 2/27 Purchase 15x15 rug for exercise room Arrived and placed 3/15 3/15
complete
GM 2/27 Purchase rugs for the east corridor 4 12
/ ft wide x
? The rugs should follow down the hallway upstairs
GM 2/27 Purchase new rug for pool gym hallway 41 x 6 3/22 Ordered Zebra Rug 3 weeks ago from
ABC
3/23 should arrive 3/30 per
GM 2/27 Purchase Estancia furniture
GM Zorro pottery
GM GM to send black and white pictures for frames in Photo dimensions 22 x 15 % inches
upper library
SORT KEY 11
JE- Mr. Epstein GM- Ms. Maxwell DI- Decorating Issues FC- Future Construction Issues HM- House Manual
EFTA00578192
Zorro Ranch Projects / Tasks List
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
GM 2/27 Larger photos are need for the garage
GM 2/27 Replace all globe light fixtures
GM 2/27 Take digital photos of the furniture shipment Shipment arrived 3/7
that arrives from Leah's Digital photos sent to GM 3/7 to ask for
placement instructions
Photos send 3/17
GM Need extra sheets for the guest bedrooms at the main
house (yellow and blue rooms)
GM 3/21 Three rugs have arrived for the main house 3/21 pictures sent to 3/21 3/22
Need to know location 3/22 Have been placed in basement near complete
elevator
GM Make new easel crank that is larger GM to try to locate original crank
GM 3/23 Mangel ironer training at the MH 3/23 The company does not give training
because it is meant for table linens not
sheets. The girls will practice.
Does GM want us to pursue further?
Build 3 17x 20 frames and 3 17x22 inch frames made 3/30 advised that GM wants
out of dark wood to locate a photo shop to make frames
2/27 When the large chess set arrives it belongs in the Arrived 3/8 will be placed 3/16 3/16
north garden complete
SORT KEY 12
JE- Mr. Epstein GM- Ms. Maxwell M- DI- Decorating Issues FC- Future Construction Issues HM- House Manual
EFTA00578193
Zorro Ranch Projects / Tasks List
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
2/27 Check telephone in exercise room The house is not wired for a telephone in 3/9
the massage room - plate to be installed complete
over circuit and Bobs paint to touch u.
Find snow melt that contains OJ 3/30 advised high priority will
begin April 1
Stone urns to be sent back to NY when delivered to Shipped 3/6 to 71g street 3/6
the ranch complete
Assemble balustrade at main house They are caulking the balustrade 3/14 will 3/27
take 2 weeks to finish weather permitting complete
Paint large ranch house 3/15 the house is half painted weather 3/20
permitting should be complete 3/20 complete
Ranch Central - the stables should be painted the As soon as it warms up Bobs paint can
same color as the inside begin
3/22 Samples on barn
2/27 Paint he shelves in the garage the same color as Bobs paint will be out the week of the 19th 3/26/
the walls of March. Complete
Main House phone lines have interference and poor Val Comm and Sawyers are trouble
reception shooting problems. 3/28 Sawyers is Fed
Exing a new CPU card.
3/28 Val-com and Sawyers are
reprogramming the system
SORT KEY 13
JE- Mr. Epstein GM- Ms. Maxwell DI- Decorating Issues FC- Future Construction Issues NM- House Manual
EFTA00578194
Zorro Ranch Projects / Tasks List
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
SORT KEY 14
JE- Mr. Epstein GM- Ms. Maxwell MI- DI- Decorating Issues FC- Future Construction Issues HM- House Manual
EFTA00578195
Zorro Ranch Projects / Tasks List
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
7
SORT KEY 15
JE- Mr. Epstein GM- Ms. Maxwell DI- Decorating Issues IT- Future Construction Issues HM- House Manual
EFTA00578196
ℹ️ Document Details
SHA-256
f780ee5d9710e909bf7cdbf61d58941c9758a93f20b1bdb9dda168fa2867cc6d
Bates Number
EFTA00578182
Dataset
DataSet-9
Document Type
document
Pages
15
Comments 0