📄 Extracted Text (930 words)
6501 Red Hook Plaza
Suite 201
St. Thomas. VI 00802
To: Little St. James
St. Thomas U.S.V.I.
Attn: Brice / Monique
E-mail:
Billing: 8/9/2012
Re: Aluminum storm panel installation.
Installation of .063 gauge aluminum storm panels over the following openings for the
prices listed. All panel track installed with white, removable headers and base, stainless
sidewalk bolts and threaded mollies. Panel track on the "Rest Building" will include 3" x
5" extruded angle and pre-studded track, (for build-out to bypass door handles).
Opening Size Price Each Amount
Five Palms building
1) 9 panels @125" window opening $ 1,478.75 (2) $2,957.50
Rest Building
2) 9 panels @ 45" w/ build-out angles $ 608.75 (2) $1,217.50
Packaging, shipping, and customs fees from P.R. $325.00
Installed Price $ 4,500.00
Deposit $-2,250.00
Balance Due $ 2,250.00
Thank you,
Karl Gartner
11,560, o 0 !U!.S /O- 70 O
698.00 /8/, /4 -roe)
c_17, 07SP, OW
EFTA01110190
6501 Red Hook Plaza
Suite 201
St. Thomas, VI 00802 INS
To: Little St. James
St. Thomas U.S.V.I.
lung E- m
Attn: Brice, Monigue
E-Mail:
Aut,i Z012 L
b
Y / WC
Billing: 5/15/2012
Re: Accordion Shutters for managers cottage windows.
Labor, equipment, and materials to install white, heavy grade accordion shutters over the
following openings for the prices listed. All shutters are installed with stainless fasteners.
Workmanship and materials carry a (5) year operational warranty provided they are
cleaned and lubricated on an annual basis.
1) 86" x 44" double window opening $ 890.00
2) 86" x 44" double window opening $ 890.00
3) 86" x 44" double window opening $ 890.00
4) 36" x 39" bath window opening $ 340.00
5) 51" x 54" upper level window opening $ 505.00
Packaging, shipping, and customs fees from P.R. and trucking $ 475.00
Installed Price $ 3,990.00
Thank you, Karl Gartner
/6-700
/ab
EFTA01110191
Hobnail Print Message Page 1 of 1
Re: LSJ cottage accordion shutter estimate
From: brice gordon
Sent: Wed 2/29/12 2:54 PM
To: Karl Gartner
Cc:
approved
On Wed, Feb 29, 2012 at 9:10 AM, Karl Gartner wrote:
Little Saint James
USVI
Phone
lel-a... 5/17/2012
EFTA01110192
6501 Red Hook Plaza
Suite 201 Telephone/.Fax
St. Thomas, VI 00802 Services, Inc.
tiEll=
To: Little St. James
St. Thomas U.S.V.I.
Attn: Brice / Monique
E-mail:
Billing: 8/16/12
Re: Aluminum storm panel installation.
We propose to furnish .063 gauge aluminum storm panels over the following opening for
the price listed. All panel track will be white, removable, pm-studded track, vertically
installed with stainless sidewalk bolts and threaded mollies.
Opening Size Price Each Amount Total
Five Palms Entry door
1) 16 panels @132" door opening $ 2,475.00 (1) $ 2,475.00
Packaging, shipping, and customs fees from P.R. $ 225.00
Installed Price $ 2,700.00
Due 50% Deposit $1,350.00
Payment Schedule: 50% deposit, balance upon completion,
Installation Period: 1 day
Thank you,
Karl Gartner
EFTA01110193
I lottnail Print Message Page 1 of 3
Fwd: Storm shutters 5 palms entry door
From: Richard Kahn
Sent: Thu 8/16/12 11:41 AM
To: brice gordon (
Cc: Daphne Wallace ( ; Monique Harry
jee approved
monique please process existing bills with a 50% deposit and send to me so i can wire karl money later
today or tomorrow
thank you
Richard Kahn
liBRK Associates Inc.
575 Lexington Avenue, 4th Floor,
New York, New York 10022
tel 212-971-1306
fax 646-350-0954
cell
Begin forwarded message:
From: Jeffrey Epstein
Date: August 16, 2012 11:37:00 AM EDT
To: Richard Kahn
Subject: Re: Storm shutters 5 palms entry door
ok
On Thu, Aug 16, 2012 at 9:35 AM, Richard Kahn < > wrote:
original quote for 16 panels @ 132" door opening was 2,865
i was able to negotiate a 5.75% reduction for cost of 2,700
16 x 132 = 2112 total area
2700 cost / 2112 = 1.278 cost
my calculations below show based on above pricing (2,700) this is best
pricing to date on shutter panels:
prior shutter order for kitchen - feb 2011
12 panels x 76" = 912 total area
1210 cost / 912 = 1.32675 cost
prior shutter order for windows at 5 palms
Int p://sti 138w.snt I38.ma il.live.eom/maiI/Print Messages.aspx?epids=d90325 I e-e7b8- I lel -...
8/17/2012
EFTA01110194
lionnail Print Message Page 2 of 3
9 panels x 125" x 2 = 2250 total area
9 panels x 45" x 2 = 810 total area
4500 cost / 3060 = 1.4705 cost
Is it ok to proceed with a 50% deposit of 1,350?
Richard Kahn
HBRK Associates Inc.
575 Lexington Avenue, 4th Floor,
New York New York 10022
to
fa
ce
Begin forwarded message:
From: brice gordon <
Date: August 15 2 APAPZWARIMIasi
To: Rich Kahn
Cc:
Subject: Corm s
Good Morning
Jeffrey mentioned that you where negotiating the estimate to
install storm panels at 5 palm
if so what is the status on this order?
thx
Brice Gordon
Little Saint James
USVI
Phone
** *********** kk******** ******* k ****** *UM ******* Ft*Ak*{k•
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
Jeffrey Epstein
http://sn I 38w.snt I 38.mail.live.eorn/mail/PriMMessages.aspx?epids=d90325 I e-e7b8- I lel -... 8/17/20
I2
EFTA01110195
Hotmail Print Message Page 3 of 3
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in en-or, please notify us immediate) by
return e-mail or by e-mail to and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
hit p://sn 138w.snt138.mail.live.com/mail/PrintMessages.aspx?cpids=d903251e-e7b8-1 I e I -... 8/17/2012
EFTA01110196
ℹ️ Document Details
SHA-256
35bbe6d354468a8b59d7ca8dd2c64c3e82c35779bc3ff7cdaa1f87979fcd0a91
Bates Number
EFTA01110190
Dataset
DataSet-9
Document Type
document
Pages
7
Comments 0