EFTA01110190
EFTA01110197 DataSet-9
EFTA01110200

EFTA01110197.pdf

DataSet-9 3 pages 373 words document
P17 V15 V11 V16
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (373 words)
Gmail - Betteroads Page I of I Gm Betteroads 1 message Fn Sep 7 2012 at 2:06 PM ihb To Hope this help Betteroads field measurement used to produce quote 160 x 14 = 2240' 60 x 14 = 840' extended entrance 460 x 14 = 6440' 9520 sq ft/9 = 1057 77 sq yard they rounded it to 1060 sq yard Asphalt will take 3 days Concrete will take 5 days the boss gave me 14 x 150 = 2100 sq ft 9 = 234 sq yard (gym road) MONIQUE HARRY 7:trivd cey\ Ao to Nes\ chick 9rvx https:.rittiail.goode.cont k- 80a8a340bc&vieu=pt&searchinbox&th— I 39a... 9/7/2012 EFTA01110197 Betteroads Asphalt Corporation P 0 Box 1946, St. Thomas, VI 00803 Date: 9/6/2012 Price Quote: Little St. James Concrete Pavement 1060 s.y. semi PtutcrIntiort, pot. Unit Price i yVords Unit Prici Total t$1 Mobilization L 1 $4,000.00 Four Thousand Dollars $4,000.00 Aggregate/ Crusher Run Cdr I Hot Asphalt Concrete Pavement Grade A Class C Base Course 2" Tons Wearing Course 1.5" Tons Leveling 1" Tons _ripening, and grubbing removal of debris LS 1 $600.00 Six Hundred Dollars $600.00 Reinforced Pori/and cement concrete pavement 6" thick 180- 5650.00 Five Hundred and Fifty Dollars Cl $99,000.00 Tack Oil Gals 'Traffic Control and Signs 11L8 Total Numbers $1033600.00 Total (Words) One Hundred and Three Thousand and Six Hundred Dollars Contractor's Name Bettero ds As halt Cor. oration Contractor's S • nature EFTA01110198 Betteroads Asphalt Corporation P O Box 1946, St. Thomas, VI 00803 I Date: 9/612012 — Price Quote: Uttie St. James Asphalt Pavement 1060 s.y. MD! IltfltISM 1J21 flSY NO8, Unit Priv/ Words (Alt Pr Ic t Mobilization LS 1 14.000.00 Four Thousand Dollars Aggregate! Crusher Run Cy Hot Asphalt Concrete Pavement Grade A Class C Base Course 2" Tons 120 $315.00 Three Hundred and Fifteen Dollars $37,800.00 Wearing Course 1.5" Tons 90i $315.00 Three Hundred and Fifteen Dollars I I $28,350.00 Leveling 1" Tons Cleaning, and grubbing removal of debris LS $600.00 Six Hundred Dollars $600.00 Reinforced Portland cement concrete pavement 6" thick Cy Tack Oll Gals 60 $15.00, Fifteen Dollars $750.00 Traffic Control and Signs LS Total Numbers 171.500.00 Total (Words) Seventy One Thousand Five Hundred Dollars Contractor's Hams Bettero • A halt Corporation Contractor's nature EFTA01110199
ℹ️ Document Details
SHA-256
893e7cdd51dfe2b8640c44a50596fcf22c0949c4f8dd6c773412c7c2881c3b1c
Bates Number
EFTA01110197
Dataset
DataSet-9
Document Type
document
Pages
3

Comments 0

Loading comments…
Link copied!