📄 Extracted Text (599 words)
Midnight Express Estimate
4720 NW 15th Ave ' Date Estimate #
Unit C
1/30/2007 37-123A
Fort Lauderdale FL 33309
Tel:
Name / Address
Project
JeffEpstein
Description Qty Rate Total
I 6,500.00 6,500.00i
Derig of motors, remove transom bracket, re-weld transom bracket, re paint
transom bracket black, reattach transom bracket
Derigging of console and replacement of dash panels. Includes design and I 2,900.00 2,900.00'
fabrication of new panels /
Rewire engine harnesses for triple engine application I 3,000.00 3,000.00v
Remove old arch and install Custom powder coated aluminum arch for hard I 16,500.00 16,500.00"
top
Custom Hard top with integrated lights I 12,500.00 12,500.00Y
Install 1800 watt inverter system I 4,650.00 4,650.00
Install 5000 BTU Air conditioner for enclosure I 3,500.00 3,500.00
This estimate is based on information received from the client or clients
representative and is subject to change upon physical inspection of the
vessel by the staff of Midnight Express Powerboats Inc. Changes to
estimate must be approved in writing by both the client and management of
Midnight Express powerboats Inc.
Upon acceptance of final proposal, the payment schedule will be ;
I) 30% Deposit to begin project and order required parts
2) Additional 30% upon receipt of required parts at Midnight Express
3) Final balance due upon completion and inspection of vessel at Midnight
Express factory in Ft Lauderdale, FL
Sales Tax $0.00
Total $49,550.00
ci,v-ck 02 I, 9 3 r
EFTA00616535
NEW Midnight Express Powerboats
4720 C NW 15th Avenue
INVOICE
Invoke Number. 102
Ft. Lauderdale. FL 33309
USA Invoice Date: Jan 7, 2009
Page: 1
Volco: Duplicate
Fax:
Bill To: Ship to:
Old Midnight
Customer ID Customer Per Payment Tern a
r
SVC-OldMidnight Not 30 Days
Sales Rep ID
Quantity Item
Shipping Method
Airbomo
Description
Ship Data
Unit Price j
Due Date
116/09
Amount
I
1.00 Deng of motors, remove transom bracket. 6,500.00 6,500.00•;---
re-weld transom bracket re paint transom
bracket black. roattoch transom bmkot
1.00 Derigging of console and replacement of 2.900.00 2,900.00
dash panels. Includes design and
fabrication of now panels.
1.00 Rowiro engine harnesses for triple engine 3,000.00 3,000.00
fabrication ✓
1.00 Remove old arch and install custom 16,500.00 16,500.00
powder coated aluminum arch for hard top
1.00 Custom hardtop with integrated lights 12,500.00 12.500.00
Install 1800 wan inverter system
Install 5000 BTU air conditioner for
ondosuro
8.00 Labor for installing and removing 3 bank 100.00 800,00
battery and inverter system
1.00 Fuel as per enriched documents 543.40 543.4
6 00 Labor 6hrs 100.00 600.00
1.00 Buy tirehim and time 200.00 200.0r
32.00 Labor for enclosure 32 hrs. 75.00 2,400.00
80 00 80 hrs Fiberglass work to support 75.00 0000.00
Subtotal Continued
Sales Tax Continued
Total Invoice Amount ConiMuod
Chock/Credit Memo No: Payrnent/C rod it Applied
TOTAL Continuedi
EFTA00616536
NEW Midnight Express Powerboats
4720 C NW 15th Avenue INVOICE
Invoice Number 102
Ft. Lauderdale. FL 33309
USA Invoke Date: Jan 7, 2009
Page: 2
Voice Duplicate
Fax:
Bill To: Ship to:
Old Midnight
Customer ID Customer PO Payment Ton
SVC-OldMidnIght Not 30 Days
Sates Rep ID Shipping Method SNP Date ! Due.Date
Airborne 2/6/09
Ouantky Rem Description Unit Price I Amount
top/enclosure
1.00 Misc. shop supplies 500.00 500.0
27 00 Motor work 75.00 2,025.00
1,00 Motor work pans (see attached) 4,245.91 4,245.91
1.00 New stereo system ( RMX55M, M6600, 623.00 623.00 C)
CDX50M)
4.00 Install stereo system 100.00 400.00
1.00 Anchor light 52.00 52.00
2.00 Spreader lights 37.49 74.
2598 0
10.00 Courtesy gunnel lights 25.00 040
1.00 Delivery
1.00 Payments received asof 7/8/09 27,615.00 -27,615.00
Subtotal 32A99.29
Sales Tax 1,917.35
Total Invoice Amount 34,416.04
Chock/Credit Memo No: PartenUCredIt Applied
TOTAL
EFTA00616537
ℹ️ Document Details
SHA-256
3b6b1bc3bbfe3fc9776b2845c464656fc0bd33de1d4de345e640563b5580f2de
Bates Number
EFTA00616535
Dataset
DataSet-9
Document Type
document
Pages
3
Comments 0