📄 Extracted Text (288 words)
Midnight Express Powerboats Estimate
4720 NW 15th Ave Date Estimate #
Unit C
1/30/2007 37-123A
Fort Lauderdale FL 33309
Te /Fax
Name / Address
Jeff Epstein Project
Description Qty Rate Total
Fabrication of new motor bracket to accommodate triple Verados 1 7,500.00 7,500.00
Removal of existing engines and bracket 1 3,500.00 3,500.00
Prep transom for new bracket 1 4,000.00 4,000.00
Installation of new bracket and three 275 Verados 1 4,000.00 4,000.00
Derigging of console and replacement of dash panels. Includes design and 1 2,900.00 2,900.00
fabrication of new panels
Rewire engine harnesses for triple engine application 1 3,000.00 3,000.00
Custom 3 sided enclosure system with tempered glass and doors 1 13,500.00 13,500.00
Remove old arch and install Custom powder coated aluminum arch for hard 1 16,500.00 16,500.00
top
Custom Hard top with integrated lights 1 12,500.00 12,500.00
Labor to install enclosure 1 8,500.00 8,500.00
Additional materials for reinforcing and attaching of enclosure to top 1 8,000.00 8,000.00
Install 1800 watt inverter system 1 4,650.00 4,650.00
Install 5000 BTU Air conditioner for enclosure 1 3,500.00 3,500.00
This estimate is based on information received from the client or clients
representative and is subject to change upon physical inspection of the
vessel by the staff of Midnight Express Powerboats Inc. Changes to
estimate must be approved in writing by both the client and management of
Midnight Express powerboats Inc.
Upon acceptance of final proposal, the payment schedule will be ;
1) 30% Deposit to begin project and order required parts
2) Additional 30% upon receipt of required parts at Midnight Ex ss
3) Final balance due upon completion and inspection of vessel a i
Express factory in Ft Lauderdale, FL
Sales Tax $0.00
Total $92,050.00
, ....-
fuct--pck-- tr30 y
EFTA00616534
ℹ️ Document Details
SHA-256
05baea563d4e42542ff425ce44b9d0d857471a4c5b8e69ea636bebd0f6a25603
Bates Number
EFTA00616534
Dataset
DataSet-9
Document Type
document
Pages
1
Comments 0