📄 Extracted Text (594 words)
Midnight Express Estimate
4720 NW 15th Ave Date Estimate #
Unit C
1/3012007 37-123A
Fon Lauderdale FL 33309
Name / Address
Project
Jeff Epstein
Description Qty Rate Total
Derig of motors, remove transom bracket, re-weld transom bracket, re paint I 6,500.00 6,500.00(--
transom bracket black, reattach transom bracket
Derigging of console and replacement of dash panels. Includes design and I 2,900.0(1 2,900.00 I-
fabrication of new panels
Rewire engine harnesses for triple engine application 1 3,000.00 3,000.00''
Remove old arch and install Custom powder coated aluminum arch for hard 1 16,500.00 16,500.00'
top
Custom Hard top with integrated lights I 12,500.00 12 50.0.Q.0:
Install 1800 watt inverter system I 4,650.00 4,650.00
Install 500013Th Air conditioner for enclosure I 3,500.00 3,500.00 A
..-
This estimate is based on information received from the client or clients
representative and is subject to change upon physical inspection of the
vessel by the staff of Midnight Express Powerboats Inc. Changes to
estimate must be approved in writing by both the client and management of
Midnight Express powerboats Inc.
Upon acceptance of final proposal, the payment schedule will be ;
I) 30% Deposit to begin project and order required pans
2) Additional 30% upon receipt of required pans at Midnight Express
3) Final balance due upon completion and inspection of vessel at Midnight
Express factory in Ft Lauderdale, FL
Sales Tax $0.00
Total S49,550.00
crw-c-it- I, g 3 s--
-s
IS
EFTA00616531
NEW Midnight Express Powerboats
4720 C NW 15th Avenue
INVOICE
Invoice Number 102
Ft. Lauderdale. FL 33309
USA Invoice Date: Jan 7, 2009
Page: 1
Voice: Duplicate
Fax:
EMI To: Ship to:
OW Midnight
Customer ID Customer PO Payment Terms
SVC-0ldhidnieht Net 30 Days
Sales Rep ID Shipping Method Ship Date I Due Date
Airborne 216/09
Quantity Item Description Unit Price Amount
1.00 Derig of motors, remove transom bracket, 6,500.00 6,500.00
re-weld transom bracket, re paint transom
bracket black. reattach transom brakot
✓
1.00 Do rigging of console and replacement of 2,900.00 2.900.00
dash panels. Includes design and
fabrication of now panels.
1.00 Rewire engine harnesses for triplo engine 3,000.00 3,000.00 /
fabrication
1.00 Remove old arch and install custom 16,500.00 16.500.00
powder coated aluminum arch for hard top
1.00 Custom hardtop with integrated lights 12.500.00 12,500.00
Install 1800 waft inverter system
Install 5000 BTU air conditioner for
enclosure
8.00 Labor for installing and removing 3 bank 100.00 800.00 0
battery and Inverter system
1.00 Fuel as per attached documents 543.40 543.40
6.00 Labor 6tes 100.00 600.00
1.00 Buy tireirim and time 200.00 200.00
32.00 Labor for enclosure 32 hrs. 75.00 2.400.00
80.00 80 hrs Fiberglass work to support 75.00 6,000.00
Subtotal Continued
Sales Tax Continued
Total Invoke Amount Continued
ChockiCrodil Memo No: Payment/Credit Applied
I TOTAL Continued
EFTA00616532
NEW Midnight Express Powerboats
4720 C NW 15th Avenue
INVOICE
Invoice Number: 102
Ft. Lauderdale, FL 33309
USA Invoice Dato: Jan 7, 2009
Page: 2
Voice: Duplicate
Fax:
Bill To: Ship to:
Old Midnight
customer ID Customer PO Payment Terms
SVC-OldMidnight Not 30 Days
filleiRePID Shipping Method Ship Date I Duo Date
Airborne 2/6/09
(Wonky 1 nom Description Unit Price I Amount -
top/enclosure
1.00 Misc. shop suppNes 500.0010
27.00 Motor work 2.025.00
1.00 Motor work parts (soo attached) 4,245.91 •,r
1.00 New stereo system ( RIAX55M, M6600, 623.00
CDX50M)
4.00 Install sleroo system 100.00 400.00
1.00 Anchor light 52.00 52.00
2.00 Spreader lights 37.49 74.98
10.00 Courtesy gunnel lights 25.00 250.00
1.00 Dolivery
1.00 Payments received as of 7/8/09 27,615.00 -27.615.00
Subtotal 32,499.29
Sales Tax 1,917739
Total Invoice Amount 34,416.64
Check/Credit Memo No: Payment/Crodit Applied
TOTAL 1
EFTA00616533
ℹ️ Document Details
SHA-256
e9a549d69b94d4b656d9bc6861cd44aa8a53c30759365c1ce39e16984190c621
Bates Number
EFTA00616531
Dataset
DataSet-9
Document Type
document
Pages
3
Comments 0