EFTA00906751.pdf

DataSet-9 2 pages 589 words document
👁 1 💬 0
📄 Extracted Text (589 words)
From: Jeffrey Epstein <[email protected]> To: >, Brice Gordon Subject: Fwd: Date: Fri, 18 Mar 2011 15:49:06 +0000 Forwarded message From: ion nicola Date: Fri, Mar 18, 2011 at 8:46 AM Subject: RE: To: Jeffrey Epstein <[email protected]> hi Jeffrey, ..i've just remembered about the lighting in the library..on the island. probably you saw many pictures of the ceiling(sky with clouds) but its hard to notice the differences of the light on different sides of the ceiling. in fact when you get inside thru the door, the front side has very strong and cold light and the left side too. the right side and the the side with the doors are darker. probably they put different bulbs(tubes) and some are not working too. so if the sky looks too light in some parts is because the lightning. you can turn off the light see the real color which is kind if dark..but i did it that way because i of the lightning. anyway, i think the ceiling looks nice. then in the other rooms were more things i couldnt finish because they told me in the last day. with a few days before i left, brice came to me and asked me how man re days i need to finish everything because he wanted to buy my airplane ticket,.. he said i have to finish office(the doors and window and the vestibule doors and thats it. so i told him i need like two three days for that. but then in the last day came and she told me i have to fix the wall in the bathroom in cabana no2 because they moved the rack is on top of the toillete. then another guy came in the morning telling me that i have to mach the frame of two mirrors he built for the master bathroom. then the electrician came with more switcher plates for office and he told me that i have to match those like the wall.., besides that i scheduled to do those two doors in the vestibule in last day, but then when i got there in the morning one door was not finished..then someone came and started patching and santi: the door, and then primering..and then painting... so thats why i couldnt finish both doors. anyway, i told when she told me about fixing the bathroom wall in cabana no 2, that i need maybe one or two days to finish everything, so i told her to cancel my flight..but then she called and they decided that i probably have to come back for more touch ups..because now all the cabanas,I,2,3 are full with a lot of furniture.. so probably when they are going to move the furniture again..will going to damage the walls. but untill they are going to move the fumiture..and while i am in new york, do you want me to start something at the house on 71st st or take a brake for a while? what do you think? thank you. ion The information contained in this communication is confidential, may be attorney-client privileged, may constitute inside information, and is intended only for EFTA00906751 the use of the addressee. It is the property of Jeffrey Epstein Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited and may be unlawful. If you have received this communication in error, please notify us immediately by return e-mail or by e-mail to [email protected], and destroy this communication and all copies thereof, including all attachments. copyright -all rights reserved EFTA00906752
ℹ️ Document Details
SHA-256
4a19d466eb8117cfc4680accad7fbca829fd1a0f592aa88639bafc16dd2b5367
Bates Number
EFTA00906751
Dataset
DataSet-9
Type
document
Pages
2

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!