From: Jeffrey Epstein <[email protected]>
To: Warwick Wicksman
Subject: Re: Latest Plan Study
Date: Fri, 18 Mar 2011 15:49:21 +0000
yes
On Fri, Mar 18, 2011 at 8:30 AM, Warwick Wicksman < > wrote:
I am out the first half of the day. Can we talk at 2 LA time?
Thanks,
Warwick Wicksman
Principal
Sent from my BlackBerry Device.
From: Jeffrey Epstein <jeevacation@qmailcom>
To: Warwick Wicksman
Sent: Fri Mar 18 08:13:49 2011
Subject: Re: Latest Plan Study
thanks„ lets have a call. you gary and I „ the images are a great help, the living room needs a view from the
screening room terrace. the roadway have to be complete„ the dirt against the wall without the road entire
circulation is very misleading. i am available all day
On Fri, Mar 18, 2011 at 7:32 AM, Warwick Wicksman < > wrote:
I agree we are not where I had hoped to be, but we have provided more design information, and made some good
progress on several items. Because we are still discussing some base conceptual issues, I can't release a team to move
full-steam ahead. Here's where I think we stand on each area, and what we need to do to get to the next level.
For the main residence areas, we really need some direction as to which of the two latest schemes to move
forward with.
• I thought we had a good basic direction after your visit, including the layout of the stairs, basic terrace layout and
general living room location. We re-did the entire model of this area to reflect this. We are still refining some views
and final elevations. (See imagel.pdf, attached.)
• Later we were asked to study the new terrace layout, with the big terrace area at road level. We are concerned that
there just isn't enough room to fit everything in, and Gary has told us moving the service road north is not feasible.
(See image2.pdf, attached.)
• Do you have a preferred version we can really start to get into and develop?
For the pool area, we are splitting our time between trying to give Gary what he needs for the main building (despite
the fact that it is not "designed" yet), and modeling the pool-side cabanas. Again, I am concerned that this will be built
before it is designed, but we are running with the direction given to us.
• We sent Gary a few revised versions of the floor and roof plans, and a basic section. I think that is set.
EFTA00906753
• Gary has asked us to block out the interior elevations and electrical, so he can review it with you. We are working
on that.
• We are revising the pool-side cabanas per your comments — but all we have been told is "too massive, try more
open".
I will send you the views of the living room from the screening room terrace today, and the door comparisons for the
pool building. If we can determine a primary direction for each of these areas, we can really move forward with the
detail.
Thanks,
Warwick
Warwick Wicksman, AIA
Principal
310.449.5790
Gensler
2500 Broadway
Suite 300
Santa Monica, California 90404
USA
http://www.Crensler.com
Click here to view Gensler's 2010 Annual Report.
From: Jeffrey Epstein [mailto:[email protected]]
Sent: Friday, March 18, 2011 6:58 AM
To: Warwick Wicksman
Cc: Gary Kerney
Subject: Re: Latest Plan Study
it has been two weeks since i was at your office.. we are not much further ahead, with either the flagpole
pool or terrace.s IS there somthing i can do to move this along,
On Thu, Mar 17, 2011 at 6:20 PM, Warwick Wicksman < wrote:
Ok - I was confused why you write that the scheme does not work. Tom's focus for that quick sketch was the terrace
area, and eliminating the upper steps. The road to the library, and the connection on the east, can be worked out. But I
need to know if this new area is worth considering. See attached.
Warwick
Warwick Wicksman, AIA
EFTA00906754
Principal
310.449.5790
Gensler
2500 Broadway
Suite 300
Santa Monica, California 90404
USA
huptilwww.Crensla.com
Click here to view Gcnsler's 2010 Annual Report.
From: Jeffrey Epstein [mailto:jeevacationtilgmail com
Sent: Thursday, March 17, 2011 5:46 PM
To: Warwick Wicksman
Subject: Re: Latest Plan Study
it is not the scheme, but the roadway form the library that is drawn, without attention to the many photos..I
recognize that you are spending time trying to find a solution, i am confused how one is proposed that hangs
off the cliff.. it is the road from the library to the service road , opposite the kichen that is once again a
fiction, the east side ,may allow us to cheat. 505 938 2929 „ thanks.
On Thu, Mar 17, 2011 at 5:37 PM, Warwick Wicksman < wrote:
Jeffrey, we agreed that this scheme doesn't work. We conveyed our concerns when we spoke on the phone earlier this
week, but you asked us to study it. We are using the topo we got from Gary/Moseby. It does not reflect any changes
made recently, but it still shows that there just isn't enough room to fit all of this in, and maintain the service road.
Gary, you had some more specific reservations about this layout when spoke earlier. Can you convey them to
Jeffrey? If there is a way to move the road, we need to know where accurately from the surveyor.
We never modeled the new library, as it was away from the area we are focusing on, but we have it now (as best we
can from the photos and limited drawings). I will send you some new images tomorrow.
Thanks,
Warwick
Warwick Wicksman, AIA
Principal
310.449.5790
Gensler
2500 Broadway
EFTA00906755
Suite 300
Santa Monica, California 90404
USA
Impliwww.Crensler.com
Click here to view Gensler's 2010 Annual Report.
From: Jeffrey Epstein [mailto:jeevacation@,gmail.com
Sent: Thursday, March 17, 2011 5:04 PM
To: Warwick Wicksman
Cc: Gary Kerney
Subject: Re: Latest Plan Study
warwick.. I immediately sent to torn„ his plans are not doable for many reasons„ the road to the library
hangs off the cliff.. I asked that he use the topo.. I am not the profesional. But immediately see it doenst
work„ you have gotten photos and topos, and tom was there .. How can i help. this is silly„ your sketch up
guy needs to put some of this on his plan„ i still have yet to see the living r000m from the screening room
terrace.. I am availble all day today or tomorrow.
On Thu, Mar 17, 2011 at 4:44 PM, Warwick Wicksman < > wrote:
Jeffrey,
Any comments on the plan Tom S sent out? He is out of town until next week. I reviewed it briefly with
Gary, and he did not think we had room to move the road on the east.
Warwick
Warwick Wicksman, AIA
Principal
Gensler
2500 Broadway
Suite 300
Santa Monica, California 90404
USA
httptilwww.Crensler.corn
Click here to view Gensler's 2010 Annual Report.
From: Tom Sze
Sent: Tuesday, March 15, 2011 7:03 PM
To: Jeffrey Epstein (jeevacation@gmtn). Gary Kerney (
Cc: Warwick Wicksman
Subject: Latest Plan Study
EFTA00906756
Jeffrey,
Here is the latest plan study G-9 based on the enclosed sketch you sent us last week.
The cascading stairs are gone and it opens up the whole center area. In order to keep the
symmetry of the plan, the newly proposed stairs to the east are encroaching onto the road.
I think you anticipated that as well based on your sketch. We will have to verify if this
Is doable. The plaza at level +37 is a bit too large but it may work incorporating it to the road.
We have also moved the Living Room as you had suggested slightly to the northeast.
The spacing between the office and the Living Room is now 25', exactly the same distance
between the bedroom and kitchen.
I am on a business trip the rest of the week and returning Monday.
Warwick will be back Thursday for any comments and/or revisions.
Hope you are well and talk to you next week.
Tom
Tom Sze, AIA
Senior Associate
Gensler
2500 Broadway
Suite 300
Santa Monica California 90404
USA
***********************************************************
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
EFTA00906757
the use of the addressee. It is the property of
Jeffrey Epstein
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to [email protected], and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
**** ********** ****** ********** ****** ****** *****************
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
Jeffrey Epstein
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to [email protected], and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
Jeffrey Epstein
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to [email protected], and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
***********************************************************
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
EFTA00906758
Jeffrey Epstein
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to jeevacation®gmail.com, and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
Jeffrey Epstein
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to [email protected], and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
EFTA00906759
ℹ️ Document Details
SHA-256
9d2083ef8cea9781d01873555c4ab342eb6e7b67be70e4787da2ffa26e236a8b
Bates Number
EFTA00906753
Dataset
DataSet-9
Type
document
Pages
7
💬 Comments 0