LSJ CONSTRUCTION
Subcontractor Payout
Project: Kitchen #1007 October 13, 2010
Trade: Air Conditioning
Requisition #01
Subcontractor Atlanta Refrigeration Service
Insurance expiration: July 1, 2011
Invoice # Requisition #01
Phase # 154100
Original Contract Sum: $3,283.70
Change Orders Submitted & Approved: $0.00
New Change Orders: $0.00
Total Work Contracted to Date: $3,283.70
Total Work Completed to Date: 100% $3,283.70
Less Retainage: $0.00
Total Payments Made to Date: $0.00
Total Current Payment Due: $3,283.70
I
Balance to Finish including Retainage: $0.00
Sales Tax Liability:
a. Subcontractor/Supplier is liable, explaiiinstall only / tax
included in contract
b. Non-resident Subcontractor/Supplier Bond Applicable:
c. Use Tax to be paid by our company:
d. Shipping None
Total Outlays for this contract incl. Sales or Use Tax: $3,283.70
JEE approval attached Invoice Attached
YES NO YES NO
X
Submitted Bill Approved by: Gary
Signed: Signed:
Date: October 13, 2010 Date: October 13, 2010
Approved by: rniad Approved by:
Signed:
Date:
EFTA00600656
LSJ CONSTRUCTION
Project Kitchen #1007
ibcontractor - full legal name: Atlanta Refrigeration Service Date Revised: October 13. 2010
Phase It 15400
Trade: Air Conditioning
Invoice It Requisition #01
Insurance expiration: 1-Jul-11 Payment
Partial Final
X
Invoice/Req# Date CIO Amount Retainage Due Paid Date Paid Check# Balance
Contract Amount 10/13/10 3.283.70
CON1
CO#2
CO#3
CO#4
CO#5
Requisition #1 10/13/10 3.283.70 0.00 3,283.70 3,283.70
Requisition #2 0.00
ITotal 3.283.70 0.00 3,283.70 0.00 3,283.70J
Contract Amount - Phase
contract 3,283.70 Split System
CO#1 Description
CON2 Description
CO/43 Description
CO#4 Description
CONS Description
Contracted To Date 3,283.70
Balance of Contract w/Relainage
EFTA00600657
ts p Atlanta Refrigeration Service VI
7350 Estate Reveal, Suite 12IC, St. Thomas USVI 00802
Tel: 340.775.9222 Fax:340.775.9122
VOTE
Job Location Quote Information
Little Saint James Date: Sep 13, 2010
Little Saint James ARS Quote
St. Thomas, VI 00802 IDA: 8452729
Tel.: Fax: Marsha Original ARS
Submitted By: love:
Gibson
Original
Submitted To: Bill Rowles Call ens/2010
Date:
We Submit Specific and Estimations for the Listed Below:
Equipment: Split-System 19:
Manufacturer: Mint Split System oriel #:
Description of Work Required:
The following quote is for a 2 Ton split-system, This quote includes the cost of all materials, labor split-system, labor, and
materials. Once done with the installation the technician will test the unit and ensure it's proper operation. Any additional parts
or repairs needed will bo quoted separately. Thank you for choosing Atlanta Refrigeration Service - "Your Single Source
Responsibility."
Materials
Description Oty Total
2 Ton Mini Split 1.0 $1,792.00
Filler Drier 1.0 $69.90
Misc. Supplies ----- Vf- 7777 1.0 $88.20
—
—
Labor
Description Qty Total
Advance Technician Labor 95.0 $760.00
Technician Helper Labor 55.0 $440.00
Important Notes: Total Materials: $1,930.10
Lead time is contingent upon approval and availability of parts. Customer is Total E.P.A. $45.00
responsible for shipping charges, duly. taxes, and any customs charges unless Total Misc./Welding: $108.130
otherwise stated in the quote
Total Labor: $1,200.00
Initial Call:
Shipping/Freight:
Warranty Information: Subtotal: $3,283.70
Standard Manufacturer warranty and 90 days labor warranty from ARS USVI if parts Tax:
aro installed by ARS USVI. QUOTE IS VALID FOR 15 BUSINESS DAYS FROM Total: $3,283.70
ISSUE DATE.
FAX BACK SIGNED TO 340-775-9122
Authorization
999
Client Authorial : ARS Acceptance:
We reserve right to coned any material errors contained horein. valid for 30 days unless ()M0MS° specified. If pails are roomed. a minimum d
25% restocking fee may apply Payment duo at c0rnplelion ol work unless other furannerner As have been made
rgAXIM
u tsaiikai
EFTA00600658
Atlanta Refrigeration Service
R 9/ 'Visode-.\"oource Responsibthir
Dept 1067 Statement
PO BOX 740209 r Date: Oct 4. 2010
Atlanta. GA 30374.0200
Tel: 404.35?-9222
Serviced At:
I.S.I I.iitIc Saint James
6100 Red Book Quarter littk Saint James
Suite RI St. Thomas. VI 00s0 ,
Saint 1 lwwms, VI 00802
RECEI VED
Er Witt sr JAMES
, APPROVED FOR PAYMENT
fl k
'Lt. TILL):
1SL Ltd
Dale Invoke No. Description Charges . Balance
9/21/2010 578(122 Technician came on site installed the new mini split system in 53:28.1.70 $3,283.70
Ilk feeder room. fie marled Ilw unit and tested for proper
1 0007
M21'2010
j ci—V )
578027
operation. Unit operating properly on departure. Thank You. X ett,hquelocr
Technician came on site and performed the preventative $1,480.00 51.480 on
eh(
maintenance service on all I I VAC systems. While performing
service technician found the cottage unit with a defective
es-Ivor:0m fan motor. Ile replaced the evaporator fan motor and
tested the 111111. Units operating properly on departure. Thank
Von.
Loikai dowor: 7mn erAt tt'€Liu Lkd t iiutte
Silout
a
• Please remember to indicate invoice numbers for payment on
your check, memo, or stub.
Please send payments to:
Dept 1067
PO BOX 740209
Atlanta. (;A 30374-0209
Thank pin for roar business/
CI 'RBI N I 'IASI Di ll
U) DA YS PAM DUE 160 DAYS PAST DI IF 1O EA1 DIII
EFTA00600659
ℹ️ Document Details
SHA-256
5068c62f64d2aefd805b1538613fd2f6340825928fe117467d8463ccba56fc93
Bates Number
EFTA00600656
Dataset
DataSet-9
Type
document
Pages
4
💬 Comments 0