Memorandum
To: Jeffrey Epstein
From: Emad Hanna
Date: 07-18-05
Re: LSJ Project # 27 Landscape Lights
Paul Gandy mentioned the original survey called for a little over 1 mile of
pathway lighting only would be around $ 100,000, which he admitted that he
made a mistake on and it is his fault. He stated in an e-mail dated 7-14 (see
attached copy) that his estimate is about $ 200,000 higher than originally
anticipated.
Upon receiving the new site plan based on the specs given to Miles, which
included the following:
1) Increase the total pathway length to nearly 4 miles
2) Utility conduits and duct banks for future facilities
3) Irrigation water
4) Communication lines
It was determined to have all utilities in a common trench.
Gandy estimates the lighting project only to take about 4 months at a cost of
$ 430,000 and the lighting and duct bank to take about 9 months at a cost of
$ 1,000,000.
Thank you,
Emad
EFTA00586313
ℹ️ Document Details
SHA-256
662124eabf6963d2c0caa026ade30d0ac23ae8821205e28f472f04546c9d4556
Bates Number
EFTA00586313
Dataset
DataSet-9
Document Type
document
Pages
1
Comments 0