GOVERNMENT OF THE UNITED STATES VIRGIN ISLANDS
DEPARTMENT OF PLANNING AND NATURAL RESOURCES
Coastal Zone Management Program
Cyril F. King Airport Terminal Building 2n° Floor
St. Thomas, U.S. Virgin Islands 00802
Telephone: FAX
June 22, 2011
Ms. Maria Tankenson Hodge
Hodge & Francois
Attorneys At Law
1340 Taarnberg
St. Thomas, VI 00802
RE: Request for Modification of Major CZM Permit No. CZT- 05-99(W)
L.S.J., LLC (Little St. James)
St. Thomas, Virgin Islands
Dear Ms. Hodge:
On June 16, 2011, the St. Thomas Committee of the VI CZM Commission
met to act on your request to modify CZM Major Permit No. CZT-05-99(W). The
proposed modification is limited to the following:
a). Installation of two (2) mooring buoys with double screw anchor with
chains held off the bottom with a large float primarily used when
seas are too rough for the vessels to sit at the dock.
b). Addition of a covered structure with an area approximately 560 ft.2
at the end of the existing dock to provide arriving and departing
passengers with a shaded area to wait.
c). Addition of a covered structure on the adjacent land with an area of
approximately 200 ie, near the dock with similar construction, to
provide an additional area for passengers to await a vessel calling
at the dock.
The proposed development is located on Little St. James Island.
EFTA01091531
LSJ, LLC (Little St. James)
CZT-05-99(W)
Request for Modification
It was determined that the proposed modification does not change the nature, scope or
characteristics of your approved Major CZM Permit No. CZT-05-99(W). Therefore,
your request for the modification as described above, is hereby approved with the
following conditions:
a. The Permittee shall notify the Division of Coastal Zone
Management (CZM) two (2) working days prior to commencement
of work.
b. Building Permits shall be obtained prior to commencement of work.
c. Turbidity barriers and other mitigative measures shall be
implemented to prevent any degradation of coastal water quality.
d. No other work is allowed.
e. The moorings shall be used for temporary, periodic use only. No
overnight use is allowed.
f. The Permittee shall negotiate the increase in submerged land fees
with the Division of Coastal Zone Management for the new
structures occupying submerged land.
If we can be of further assistant u lease feel free to contact Mr. Jean-Pierre L.
Oriol, Director of CZM at
Sincerely,
ed—
ustin M. Monsanto
Chairman, St. Thomas CZM Committee
cc: St. Thomas CZM Committee Members
Jean-Pierre L. Oriol, Director, CZM
Robert C de Jongh, Architects
File
EFTA01091532
ℹ️ Document Details
SHA-256
6bf817ac7215b626e8cff05f3c4557bc5fac0665fca14cb054eab2cf8fc35856
Bates Number
EFTA01091531
Dataset
DataSet-9
Document Type
document
Pages
2
Comments 0