EFTA00807986.pdf

DataSet-9 2 pages 356 words document
👁 1 💬 0
📄 Extracted Text (356 words)
Construction Proposal Quantum Vision Construction LLC 8168 Crown Bay Marina Suite 505 PMB 260 St. Thomas, VI 00802 January 21', 2018 Owner: LSJE Little St. James Island, VI Project: Asphalt Pathways Paving Works Little St. James Island, VI SCOPE OF WORK: • Prepare and grade existing sub base • Eradicate and remove weeds and organic material from existing sub base. • Compact sub base to insure stability • Spread and compact 3 inches of owner-supplied aggregate base material • Apply Tack Coat prior to asphalt concrete placement • Place new 2-inch asphalt concrete pathway SPECIAL CONDITIONS: • LS) will remove, secure, and replace all stone and other border edges. • LS] will provide all ferry services and vehicular and equipment barging services to and from Little St. James Island. • Aggregate base will be supplied by owner. • Care will be taken throughout this project to minimally impact all existing areas on Little St. James Island that is not a part of this project. However, it is understood that some damage will occur to existing landscaped areas and contractor will not be responsible for replacement of these damaged areas while implementing normal construction procedures. OPTIONS (NOT INCLUDED IN BASE PRICE): • As shown on drawings entitled "Little St. James RV and Pedestrian Pathway Re-Surfacing Project" and dated September 18, 2014. TOTAL BASE PRICE: $465,000.00 *Total Base Price is based on Quantum Vision Construction LLC's procurement ofits own asphalt concrete producing plant. Little St. James Island Paving Page I of2 EFTA00807986 At+ Construction Proposal Project Table: Name Description Quantity Unit Cost Unit Total Cost Asphalt Concrete 2-inch pathway 1.500 $285.00 Too S427.5(x)(x) Paving 3-inch course using owner Excavation and supplied aggregate base 13.000 515.00 S.Y. $37.500.00 Sftework material. Total Base Price $465,000.00 Options II Drainage Measures: As shown on drawings entitled "Link St. James RV and Pedestrian Pathway Re-Surfacing Project" Concrete Swales Described above and dated September IS. 2014. 32 51.064.00 a EA $34,048.00 Aggregate Base Described above 32 $182.00 EA $5.824.00 Pad Rip Rap Detention Described above 32 $202.00 EA $6.464.00 Area Options Total I $46,336.00 Little St. James Island Paving Page 2 of 2 EFTA00807987
ℹ️ Document Details
SHA-256
6c1aca7c58f72a62bfb95ea301b87e26bf6f875a11e18ecd140abdd5082314fa
Bates Number
EFTA00807986
Dataset
DataSet-9
Type
document
Pages
2

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!