EFTA00807984.pdf

DataSet-9 2 pages 337 words document
👁 1 💬 0
📄 Extracted Text (337 words)
Construction Proposal Quantum Vision Construction LLC 8168 Crown Bay Marina Suite 505 PMB 260 St. Thomas, VI 00802 January 21', 2018 Owner: LSJE Little St. James Island, VI Project: Asphalt Pathways Paving Works Little St. James Island, VI SCOPE OF WORK: • Prepare and grade existing sub base • Eradicate and remove weeds and organic material from existing sub base. • Compact sub base to insure stability • Spread and compact 3 inches of owner-supplied aggregate base material • Apply Tack Coat prior to asphalt concrete placement • Place new 4-inch reinforced Portland cement concrete pathway SPECIAL CONDITIONS: • LSJ will remove, secure, and replace all stone and other border edges. • LSJ will provide all ferry services and vehicular and equipment barging services to and from Little St. James Island. • Aggregate base will be supplied by owner. • Care will be taken throughout this project to minimally impact all existing areas on Little St. James Island that is not a part of this project. However, it is understood that some damage will occur to existing landscaped areas and contractor will not be responsible for replacement of these damaged areas while implementing normal construction procedures. OPTION (NOT INCLUDED IN BASE PRICE): • As shown on drawings entitled "Little St. James RV and Pedestrian Pathway Re-Surfacing Project" and dated September IS, 2014. TOTAL BASE PRICE: $830,500.00 Little St. James Island Paving Page I of2 EFTA00807984 Construction Proposal Project Table: Name Description Quantity Unit Cost Unit Total Cost Portland Cement 4-inch reinforced pathway 13.000 $61.00 S.Y. $793.000.00 Concrete Pavement 3-inch course using owner Excavation and supplied aggregate base 13.000 $15.00 S.Y. $37.500.00 Sitework material. Total Base Price $830,500.00 Option Measures: As shown on drawings entitled "Little St. James RV and Pedestrian Pathway Re-Surfacing Project" and dated September 18. 2014. Concrete Swales Described above 32 51.064.00 EA S34.048.00 Aggregate Base Described above 32 $182.00 EA $5.824.00 Pad Rip Rap Detention Described above 32 3202.00 EA $6.464.00 Area Options Total $46,336.00 Little St. James Island Paving Page 2 of2 EFTA00807985
ℹ️ Document Details
SHA-256
d49dd2095c883f088a4bf76c488f1ea112ac2da0b909fb6086448f6a5fdcb665
Bates Number
EFTA00807984
Dataset
DataSet-9
Type
document
Pages
2

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!