📄 Extracted Text (166 words)
From: Richard Kahn
To: "Jeffrey E." <[email protected]>
Subject: Structural Repairs per Dan
Date: Thu, 10 Sep 2015 19:52:02 +0000
Attachments: NEPTUNE_STRUCTURAL_REPAIR.pdf
Numbers seem crazy and have not yet had time to review with Dan (which was why i was waiting to send)
Richard Kahn
HBRK Associates Inc.
to
fa
cel
Begin forwarded message:
From:
Subject: El Brillo repairs
Date: September 9, 2015 at 5:46:14 PM EDT
To:
Richard,
See attached itemized conceptual budget for the structural repairs to the 2nd floor bed / bath rooms.
Due to the structural unforeseen nature of this repair, we will only perform this as a time and material contract.
Unfortunately until we demo the 2nd floor floor sheeting and expose the failing floor truss system, we cannot estimate or
design the materials needed for the repair so that is listed as "TR' on the budget.
I am waiting on a couple of additional estimates to compare for the other proposals previously submitted.
Please review and reply.
Thank you,
Dan
EFTA01191265
ℹ️ Document Details
SHA-256
728584df1c5cf89b50746988e29ba92099e820e89dcfea38a9098d6c92ab6c1c
Bates Number
EFTA01191265
Dataset
DataSet-9
Document Type
document
Pages
1
Comments 0