EFTA01454606.pdf
👁 1
💬 0
📄 Extracted Text (253 words)
RRP73 - Elysium
Appendix B: Case Study #8: 345 Park Ave - New York
City
16 energy and water projects
Energy Water
Projects' Projects Savings Savings
kWh liters
Building Automation New Terminal Regulation AC Controls
3
Systems & HVAC Controls Replacement of Tstats with setpoint reset (2) 35,066 14
Heating, Ventilating, and
Addition of zoned cooling systems (2) 2
Air Conditioning Upgrades 42,806 116
High efficiency lighting fixtures (2)
Lighting Improvements 4
Occupancy sensor controls (2) 339,589
Water and Sewer
Installation of low flow urinals 1
Conservation Systems 447
RCx Decommissioning - Cooling Equipment
RCx Optimization - Air Handling Unit
Commissioning RCx Rescheduling - Cooling Equipment (2) 6
158,567
RCx Rescheduling - HVAC System
RCx Rescheduling - Overtime AC
Totals 16 576,028 577
2007 Baseline2 3,756,451 Building Data
Percent of Baseline 15.33% Multi Tenant
High Rise Commercial Office
219,813 ft' leased space.
345 Park Ave
Projects in Progress NYC, NY
Does not include following projects not yet completed: (1) lighting improvement, and joint commissioning program
with Landlord.
See footnote 1 on page 41.
' Project Data records and energy & water savings provided by CRES year erxling 2012 Sarongs calculation validated by third party. Nup Engineering
'Utility Data provided from Environmental Management System for year ending 2012 Data verified by third party. ERM Certification and Verification Seivrces
Deutsche Asset RREEF Retrofit Partners. L.P. For U.S. Person Clients of the U.S./Americas Key Client Partners Desk Only
t W.mith Mana;rt- June 2014
CONFIDENTIAL — PURSUANT TO FED. R. CRIM. P. 6(e) DB-SDNY-0112825
CONFIDENTIAL SDNY_GM_00259009
EFTA01454606
ℹ️ Document Details
SHA-256
72ef88d39c541570b2f32abca096f1dae734b42861639a5ec84a570fdb7ae4b1
Bates Number
EFTA01454606
Dataset
DataSet-10
Type
document
Pages
1
💬 Comments 0