EFTA01454605.pdf

DataSet-10 1 page 198 words document
👁 1 💬 0
📄 Extracted Text (198 words)
RRP73 - Elysium Appendix B: Case Study #7: Wilhelm-Fey Strasse - Frankfurt, Germany 12 energy and water projects Energy Water Projects' Projects Savings Savings (kWh) (liters Water and Sewer EcoLab Conveyer Dishwasher (2) 2 Conservation Systems 959,501 RCx Optimization - HVAC System RCx Optimization - Pumping Controls Commissioning 10 RCx Rescheduling - Cooling Equipment 449,847 1,069 RCx Rescheduling - HVAC System (7) Total 12 1,409,348 1,069 2007 Baseline2 8,540,894 Percent of Baseline 16.50% Building Data Single Tenant Mid-Rise Commercial Office 514,900 sq.ft. Wilhelm-Fay-strasse 31-37 Frankfurt, Germany Projects in Progress Does not include following projects not yet completed: (2) HVAC control upgrades (4) fighting improvements, (1) metering upgrade, and (20) re-commissioning projects. See footnote 1 on page 41. ' Project Data records and energy & water savings provided by ORES year ending 2012 Savings calctiation vakdated by third party, Arup Engineering 2 Uukty Data provided from Environmental Management System for year endirp 2012. Data verified by third party. ERM Certification and Verification Services. Deutsche Asset RREEF Retrofit Partners. L.P. For U.S. Person Clients of the U.S./Americas Key Client Partners Desk Only t W.mith Mana;rt- June 2014 CONFIDENTIAL — PURSUANT TO FED. R. CRIM. P. 6(e) DB-SDNY-0112824 CONFIDENTIAL SDNY_GM_00259008 EFTA01454605
ℹ️ Document Details
SHA-256
62c6f9483d49c1542abae7814a64ebf0a501b213dcd4f8fb60b6e845de906900
Bates Number
EFTA01454605
Dataset
DataSet-10
Type
document
Pages
1

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!