EFTA01454605.pdf
👁 1
💬 0
📄 Extracted Text (198 words)
RRP73 - Elysium
Appendix B: Case Study #7: Wilhelm-Fey Strasse -
Frankfurt, Germany
12 energy and water projects
Energy Water
Projects' Projects Savings Savings
(kWh) (liters
Water and Sewer
EcoLab Conveyer Dishwasher (2) 2
Conservation Systems 959,501
RCx Optimization - HVAC System
RCx Optimization - Pumping Controls
Commissioning 10
RCx Rescheduling - Cooling Equipment 449,847 1,069
RCx Rescheduling - HVAC System (7)
Total 12 1,409,348 1,069
2007 Baseline2 8,540,894
Percent of Baseline 16.50% Building Data
Single Tenant
Mid-Rise Commercial Office
514,900 sq.ft.
Wilhelm-Fay-strasse 31-37
Frankfurt, Germany
Projects in Progress
Does not include following projects not yet completed: (2) HVAC control upgrades (4) fighting improvements, (1)
metering upgrade, and (20) re-commissioning projects.
See footnote 1 on page 41.
' Project Data records and energy & water savings provided by ORES year ending 2012 Savings calctiation vakdated by third party, Arup Engineering
2 Uukty Data provided from Environmental Management System for year endirp 2012. Data verified by third party. ERM Certification and Verification Services.
Deutsche Asset RREEF Retrofit Partners. L.P. For U.S. Person Clients of the U.S./Americas Key Client Partners Desk Only
t W.mith Mana;rt- June 2014
CONFIDENTIAL — PURSUANT TO FED. R. CRIM. P. 6(e) DB-SDNY-0112824
CONFIDENTIAL SDNY_GM_00259008
EFTA01454605
ℹ️ Document Details
SHA-256
62c6f9483d49c1542abae7814a64ebf0a501b213dcd4f8fb60b6e845de906900
Bates Number
EFTA01454605
Dataset
DataSet-10
Type
document
Pages
1
💬 Comments 0