📄 Extracted Text (254 words)
RRP73 - Elysium
Appendix B: Case Study #5: Theodor-Heuss-Allee -
Frankfurt, Germany
24 energy and water projects
Energy Water
Projects' Projects Savings Savings
kWh liters
Heating, Ventilating, and Air
Retrofit of CRAC with VFD and controls 1 375,804
Conditioning Upgrades
Electric Motors and Drives AHU VFD Retrofit 1 583,697
Water and Sewer
EcoLab Conveyer Dishwasher (3) 3 28,602 313
Conservation Systems
RCx Optimization - Chiller Plant
RCx Optimization - Exhaust Systems
RCx Optimization - Filter Optimization
RCx Optimization - Heating Plant
Commissioning 19 5,175,722 1,525
RCx Optimization — Humidification (3)
RCx Rescheduling - HVAC System (4)
RCx Rescheduling — Lighting (2)
RCx Rescheduling — Temperature (6)
Totals 24 6,163,824 1,838
Building Data
2007 Baseline2 11,207,163 Single Tenant Commercial Office
Percent of Baseline 55.00% 331,600 sgft.
Theodor-Heuss-Allee, Frankfurt,
Germany
Projects in Progress
Does not include following projects not yet completed: Replacement of heating systems, (8) lighting improvements, and
(14) re-commissioning projects
See foolrote 1 on page 41
Project Data records and energy S water savings provided by CRES year ending 2012. Savings calculation validated by third party. Arup Engineering. Does not include following projects not
yet completed. Replacement of heating systems. (9) lighting improvements. and (14) re-commissioning projects
Utility Data provided from Environmental Management System for year ending 2012. Data verified by third party. ERM Certification and Verification Services
Deutsche Asset RREEF Retrofit Partners. L.P. For U.S. Person Clients of the U.S./Americas Key Client Partners Desk Only
t W.mith Mana;rt- June 2014
CONFIDENTIAL - PURSUANT TO FED. R. CRIM. P. 6(e) DB-SDNY-0112822
CONFIDENTIAL SDNY_GM_00259006
EFTA01454604
ℹ️ Document Details
SHA-256
8a1491d12718d0ef8c8e4d6927d4a581298a04ec41772387e6313f11d595a2df
Bates Number
EFTA01454604
Dataset
DataSet-10
Document Type
document
Pages
1
Comments 0