📄 Extracted Text (122 words)
As
ALT irtROAOS
ASPHALT CORP
Construction Proposal
August 7, 2015
By the Contractor: Betteroads Asphalt Corporation
#3G Turpentine Road
Estate Bovoni
St. Thomas, VI 00802
United States
1-8593-1L
For the Project: LSJ_Added Aggregate Base
Little St. James Island
VI
SCOPE OF WORK:
Place and compact 3 inches aggregates base as per plan
TOTAL BASE PRICE: $90,712.00
Project Totals:
Name Quantity Unit Cost Unit Total Cost
Aggregate
Crushed stone Aggregate Base 1.360 530M0 Ton S40.S(X).(X)
Materials Transport
Trucking and Hauling 68 $400.00 Each $27.200.00
Excavation and Fill
Loading and/or Spreading Base 1360 $3.00 Mil 54.050.00
Structural Compaction 1360 $5.00 Ton 56.800.00
Company Overhead
Company Overhead Percentage 15.00% $0.00 Percent of Costs 511.832.(g)
Grand Total $90,712.00
Page I of
LSJ Added Aggregate Proposal
EFTA01087967
ℹ️ Document Details
SHA-256
87770c068556655a69823b8cdd5dafd7a27c9ea9558e225b76e6519db6198963
Bates Number
EFTA01087967
Dataset
DataSet-9
Document Type
document
Pages
1
Comments 0