Zorro Development Corp - Project Report 9/2
21 - MICROWAVE & ' START
/13
END I EST.COST NOTES
a PHOTO STATOin
4/27/13 — JE requested to investigate Microwave option
Awaiting
519/13 — Existing Microwave details forwarded to JE, RK & JR
Proposal
5/16/13 — JE requested contacting Dava Baumann reference
RMC
delivery of service from Sandia Crest verses D Mark
5/17/13 — Dava Baumann forwarded details of RSM — Craig
Franck. Brice has been in contct with Craig
5/24/13 — Received bid from Southwestern Wireless, have
call
set up for 5/28/13 to review bid
5/31/13 — Forwarded update of Project to JE, RK & JR
6/8/13 — Forwarded TW Telecom proposal for Delivery of Servic
e
to JE & RK Firm bids due 6/14/13
6/14/13 — Received bid from Southwestern Wireless confirm
ing
details. Informed JE, will forward once all details confirmed
6/20/13 — JE approved Southwestern Wireless bid.
RK to negotiate final bid
6/27/13 — Southwestern Wireless unable to deliver bundle
d T1
6128/13 — Looking into other options
7/12/13 —Awaiting proposal from Advanced Communcations
Will review proposed Link Plan with JE on site
8/14/13 — Proposal received
8/15/13 — Conference call completed with RK, BG, SD & RB
8/17/13 — Advanced Communcations on site to review Project JE
8/18/13 — Confirming Advanced Communcations require Servic
e
Provider before their can engineer final solution
8/26/13 — Filed a complaint with PRC NM regarding Century Link
backing out of Service Provider option. 10 days to respond
8/27/13 — Contacted Steven Grabiel (High Speed Internet
Edgewood) Expect Proposal 8/6/13. Will forward once in hand
8/29/13 - Received Proposal from RMC for x 3 40ft poles,
will
review & forward
Page 1
EFTA01124687
Zorro Development Corp - Project Report 9/2/13
rir- LANDSCAPING START ' END EST.COST NOTES PHOTO STATUS
MB
06/01/13 T $75.000.00 3/28/13 — Refurbishment & Mainteance Proposals from 3 AwatUng
companies forwarded to RK & DI
Direction
4/27/13 — JE approved Aspen for Refurbishment Project & Aspen
to remain as ZDC Mainteance Company
5/9/13 — New Proposal forwarded to JE, RK awaiting direction
5/16/13 — Final proposal forwarded to RK
5/24/13 — Aspen agreed to $75,000.00
5/31/13 — Deposit of $44,383.08 issued to Aspen
46/1/13 — Project Started
6/8/13 —Work continues, sa preperation in progess
6/14/13 — Plant material starting to arrive
6/18/13 — More plant materail on site
6/21/13 — Back Parking Area - Planting & Irrigation Complete
6/22/13 — Planting & Irrigation continues — attached photos
6/26/13 — More_plant material on site
6/27/13 — Preparation of front parking area begins, Columbines
& Trumped Vine planted along pathway between MH & Dog Pen
Irrigation installed in all planted areas — attached photos
7/12/13 — Plant & I "i : C. installation continues —
Attached plant schedule & photos
7/26/13 — ProLct 90% Complete _
Having issues locating Cypress Trees.
8/7/13 — JE decided not to install Cypress Trees, in lu Aspen will
remove 4 Hawthorns & replace with 4 Blue Spruce
8/9/13 — Final Breakdown of Project forwarded to JE
8/10/13 — JE to meet Jose from Aspen to review Project
8/11/13 — JE updated earlier request — remove 5 Hawthorns &
add 7 Blue Spruce -I
8/22/13 — Forwarded to JE suggested colourful plant material,
selected for discussed areas — awaiting direction
Page 2
EFTA01124688
Zorro Development Corp - Project Report 9/2
22A - LANDSCAPE ----m
, START , END
/13
EST.COST NOTES
LIGHTING PHOTO STATUS
4/27/13 —JE Approved New Landscape Lighting
Pending
5/1/13 — Unable to move forward until Project 22 — Landscaping
Completion
has been resolved
Project 22
6/1/13 — Reviewing with Aspen about plant location
7/18/13 — Have installed Lighting where planting is complete
7/27/13 — Before proceeding will review with JE on site
8/22/13 — Will Complete Project once Project 22 — Landscaping
MH Complete
IN HOUSE - START
LANDSCAPING
END EST.COST NOTES pHaro STATUS
06/03/13 4/27/13 — JE Approved, removal of dead Pine in courtyard,
Awaiting
removal of Ponderosa Pines, Landscape Lighting at front
Proposals
Enterance & to relocate Pinons to the area
613113 — Project Started
6/18/13 — Removal of Pine & Ponderosa Pine complete -
attached photos
7/19/13 — Relocation/installation of Pinons from remote areas of
the Ranch to front enterance continues
7/27/13 — Project 90% complete, will review with JE while on site
8/21/13 — Reviewed area with JE, outlining scope of work
8/29/13 - Removal of dead & infected Pinions — Comp
lete
8/30/13 — Awaiting Proposals from Aspen & 2 other vendo
rs
due by 9/6/13
Page 3
EFTA01124689
Lorro uevelopment Corp - rroject Kepon
24 - MEDIA ROOM V/L/1.5
, START ' ENQ EST.COST
CURTAINS NOTES PHOTO STATUS
Blackout & Rings $6,262.08 4/27/13 —JE Selected Fabric for Project
5/10/13 — Project Request Form forwarded to JE & RK Awaiting
5/17/13 — Resubmitted Project Request Form to JE Direction
5/31/13 —Awaiting Direction
25 — omcg START gND EST.COST
CURTAINS NOTES PHOTO STATUS
Lined & Rings $2,527.01 4/27/13 — JE Selected Fabric for Project
5/2/13 — Vendors & Manufacturer enable to provide enoug Awaiting
h Direction
yardage of selected fabric
5/9/13 — Another fabric option forwarded to JE
5/10/13 — Project Request Form forwarded to JE & RK
5/17/13 — Resubmitted Project Request Form to JE
5/31/13 — Awaiting Direction
Page 4
EFTA01124690
Zorro Development Corp - Project Report 9/2
V -TERRACE STAR' ' END
- - - - - /13
EST.COST NOTES
Terraces - $52,000.00 04/07/13 07/03/13 $56,200.00 12/12/12 — Bid received. PHOTO STATUS
Stucco/Gutters/Painting Change
3/20/13 —JE Approved Bid
$4,200.00 Order
4/7/13 — Project Started
Outstanding
4/20/13 — Libary Membrane installed
to Vendor
5/10/13 — Change Order Submitted by Vendor $2,700.00
+ tax $2,700 + tax
5/16/13 — MBR Balustrade reinstalled
5/20/13 — MBR Membrane to be installed
5/31/13 — There was a fault in 1 roll of material, vendo
r has
reordered, will recover area once on site
6/7/13 — Material on site
6/14/13 — Membranes & Gutters Complete — attached
photos
6/18/13 — Stucco & Painting due to start
6/21/13 — Stucco & Painting Complete — attached photos
6/24/13 — Final review on completed work with Vendor
7/2/13 — Final Punch Out to begin of all outstanding work
7/3/13 — Project Complete
8/8/13 — JE requested carpet to be installed on both terrac
es
8/9/13 — Carpet samples forwarded to JE
8/17/13 — JE selected carpet 1 selection on back order
8/19/13 — 3 B's to meet with JE to review Project
9/3113 — 3 B's on site to Water Test MBR Terrace
29 — REPAIR PART gm cstcosT
POOL/SPA NOTES PHOTO STATUS
$12,600.00 5/9/13 — Vendor on site
5/16/13 — Bid breakdown forwarded to RK
6/10/13 — JE requested that work be started in Sept 2013
8/20/13 — JE requested that 3 B's submit a bid for Project
9/3/13 — 3 B's on site to review Project
Page 5
EFTA01124691
orro ue -
30- FRONT GATE -
START - vei
-ENQ opment Cor
- EST.C
orpp - rroject Report wzii .-3
OSL NOTES
OPENERS PHOTO STATUS
Call Boxes/Loops 07/25/13 $10,125.00 4/20/13 — Bid received, requested vendor to make adjustments
+ tax Gate Loops
5/9/13 — Received Revised bid. Options & Equipment reviewed
not
5/12/13 — Options & Equipment selected
5/21/13 — Final bid faxed, unreadable, vendor will resen Installed
d
6/8/13 — Final bid attached with Project Report
6/11/13 — RK requested material breakdown
6/14/13 — Material breakdown forwarded to RK
6/19/13 - Resubmitted revised pricing to RK
6/28/13 — RK requested that 3 B's submit an estimate.
Have
contacted 3 B's, they will be on site next week to review
r 7/9/13 — RK neogiated 3 B's bid
7/11/13 — 3 B's Bid &proved.
7/12/13 — Forwarded Deposit Request $6,750.00 to BK
& RK
7/25/13 — Project Started
7/27/13 — Gate 1 Controllers & Key Pad installed. New Key
Pad
for Gate 2 faulty, vendor has reordered — attachediho
tos
8/10/13 — Waiting for installation of loops & Gate 2 Key
Pad
8/19/13 — Vendor to meet JE
8/21/13 — Gate 2 Key Pad installed, gate phone lines down,
hence no remote control to operate gates
8/30/13 — Contacted RMC regarding phones & gate contro
llers
will be on site next week
9/2/13 — As of date Gate Loops Not Installed
9/3/13 — 3 B's on site to review Project
Page 6
EFTA01124692
Zorro Development Corp - Project Report 9/2/13
31 - PHONES MAIN I START END EST.COST
liOuSt NOTES PHOTO STATUS
07/17/13 41/27/13 — JE approved installation of new phones at MH
Awaiting
Awaiting for Service Provision & Estimated Cost of Delivery of
Delivery of
Services from Prod 21 — Microwave & IT before moving forwar
d Phones
6/22/13 —Awaiting response from Southwestern Wireless
on
FCC License Application & Router at MH
7/17/13 — Project Started
7/25/13 — Switch & 16 Phones Installed, awaiting delivery date
remainder of phones — attached photos
9/6/13 — Phones due to be deliveried to Vendor
32- PHONES RANCH I START eST.COST
CENTRAL NOTES PHOTO STATUS
6/21/13 - Will forward proposal for Phone System by 6/28/13
Project
6/27/13 - Project On Hold until Microwave Solution resolved
On Hold
Page 7
EFTA01124693
Zorro Development Corp - Project Report 9/2/13
33 - POOL PAC START END EST.coaT _ .
NOTES ______ PHOTO STATUS
Engineering Inspection
— !-4/29/13 - Quote forwarded to RK, who requested more detail
$9,100.00 5/8/13 — Revised quote forwarded to RK, awaiting direction
5/22/13 — Beaudin Ganze on site to review Project
Unit Cost
5/29/13 — Beaudin Ganze report forwarded to JE & RK
$43,170.00
5/29/13 — JE Approved inveslgation via camera
6/3/13 — JBH forwarded estimate
Camera Duct Inspection 6/4/13 — JE Approved moving ahead
$1,214.91 6/11/13 — JBH due on site
6/12/13 — JBH on site, complete camera inspection, awaiting
Report/Disc
6/21/13 — Report/Disc forwarded to Beaudin Ganze
7/8/13 — Report/Disc due on site
7/9/13 — Informed that Report has been delayed
RK forwarded Report to JE
7/20/13 — Beaudin Ganze on site to review Project with JE
JE did not approve any design solutions by Beaudin Ganze
8/22/13 — Contacted Dessert Air & forwrded info regarding
existing space & equipment design
9/18/13 - Site visit Dessert Air to confirm their proposed
solution
34 — REPAIR & PAINT $TART ebff2 gST.COST
WORK — ION NOTES PHOTO STATUS
5/7/13 — E Mailed Photos to JE showing work required
5/23/13 — Forwarded all work details to Ion, including work that
will be required after MBR Terrace is completed
6/29/13 — Additional work — Sign on Adobe,IIIII.Office Wall
Page 8
EFTA01124694
Zorro Development Corp- Project Report
i35 - KITCHEN TABLE i START 9/2/13
END EST.COST NOTES
ELECTRICAL , , PHOTO STATUS
06/03/13 3/1/13 — Bid Received — Lead Time 1 Week
6/3/13 — Project Started
6/7/13 — Under floor conduit due to be completed 6/12/1
3
6/13/13 — Conduit Installed, tiles replaced & grouted. Cat 5
still to
be pulled & punched down — attachedphotos
7/22/13 — Cat 5 pulled & punched down
—
Pluggingy Hole $15,000.00 Estimate to Plug 1 st Hole
38 - SEPTIC SYSTEM START END, EST.COST
ADOBE NOTES PHOTO STATUS
07/10/13 7/9/13 — E Mail forwarded to RK — Adobe Septic Syste
m is
blocked. ZDC unable to clear line
7/10/13 — Bassett Construction on site to review system, inspec
t
lines with camera. Found compressed One under the Adobe
outside deck. Work Completed at $533.04
7/11/13 — ZDC will remove pavers after visit, Bassett Const
ruction
will complete repair & ZDC will reconstruct deck area —
attached
photos
8/9/13 — Received Estimate from Bassett Construction to
replace main sewer line, install new cleanouts & PVC pipe
$3,740.63
8/20/13 — Forwarded bid to JE
8/22113 — JE request that 3 En submit bid
9/3/13 — 3 B's on site to review Project
Page 9
EFTA01124695
Zorro Development Corp - Project Report
2.2= START END
9/2/13
EST.COST NOTES
REFURBISHMENT PHOTO STATUS
ROADS CULVERTS
7/27/13 — Will review with JE on site, refurbishment of all Road
s&
Culverts
8/5/13 — Road Base 23 tons $360, Culvert 4ft x 24ft - $1381.85
Culvert 5ft x 24ft - $1,727.24
40 - LANDSCAPING START OD fST.COST
LOG & LODGE NOTES PHOTO STATUS
Removal of Dead Trees, Cover Rocks with Soil
41= START gm EST.COST
REFURBISHMENT NOTES PHOTO STATUS
HOME THEATER
8/13/13 — JE requested replacement of exisiting Sony Projec
tor On Hold
I8/15/13 —3 Vendors on site — Proposals due next week
8/22/13 — JE forwarded 2 Proposals
8/25/13 — Received 3rd Proposal
JE requested Project On Hold as new Projector to be releas
ed
Dec 2013
i4k- START EIIQ EST.COST
REFURBISHMENT NOTES PHOTO STATUS
EXTERIOR - LV
$10,100 + tax 8/22/13 - JE Approved Project
3 B's to complete MH. ZDC to complete Garage
IN HOUSE START END EST,COST
REFURBISHMENT NOTES PHOTO STATUS
LANDSCAPING — LV
8/22/13 — JE Approved Project
Cover Rock with soil, Pinion installation Awaiting
r-- Direction
8/22/13 — Forwarded JE suggested colourful plant material
for discussed areas - awaiting direction
Page 10
EFTA01124696
Zorro Development Corp - Project Report 9/2
PQRCHA,ES START END
/13
EST.COST NOTES
Heavy Machinery _PHOTO STATUS
8/22/13 - JE requested investigattg a Bulldozer purch
ase & any
other equipment ZDC may require
8/27/13 — Investigating avaiable equipment
9/3/13 — Investigating trading exisiting Bobcat for new
Outside Furniture —
Lodge 8/22/13 — JE agreed new outside furniture required, will reloca
exiitng table & benches from Shooting Range to uncovered te
back
deck
9/1/13 — Will investigate funiture options for covered back deck
ZDC
JN HOUSE WORK
CACTUS REMOVAL START END EST.COST NOTES pHoTo, STATUS
To begin Early Fall
S ED AT • 3g START M j EST-COST NOT PHOTO SIATUS
Reskin, Paint & Seal —work to begin in the Fall
LQPGE ROOF START EST.COST
MR NOTES c PHA STATUS_
Repair/Replace Broken Sections - work to begin in the Fall
r ,
In Nala MIStian
Kin PHOTO STATUS
8/22/13 — JE Approved reconstruction of exisitng furniture -i
to
make items more resilient to mice attack
FUEL STORAGE START END EST.COST
ARC NOTES 9HOTQ STATUS
8/18/13 — Additional New Tank Installed
Repainting of tanks, matting & gravel installation to begin
in the Fall
Page 11
EFTA01124697
Zorro Development Co - Project Report 9/2/13
GRAVEL/EDGES RC START END EST.cOST
PATHS NOTES PHOTO STATUS
All paths to be dug out, edged and gravel installed to begin
early
early Summer 2014
JOG CABIN STEPS START END gST.COST N9TE, PRoTS. ,STATUS
New Section to be refabricated
CATTLEGATES1 START SID EST.COST
GUARDS )( 3 NOTES PHOTO STATUS
Refurbishment, Empty & Paint
PAINTING/STAINING/ START END gST.COST
SEALING NOTES PHOTO STATUS
RC Office Interior
Repainting to be completed over the Fall
Reservior
Repainting to be completed over the Fall
RC Mech Bays/Garages
Painting to be completed over the Winter
Firehouse Interior
Painting to be completed over the Winter
Stables
7/8/13 — Inside/Outside Lights repainted
Inside resurfacing, painting, staining, concrete floors
to be completed over the Winter
Resealing outside to begin Early Summer 2014
Adobe, Log & Lodge
Resealing of outside & deck refurbishment to begin early
Summer 2014
Page 12
EFTA01124698
rro Deve o 9/2/13
WELLS
DAKOTA & K
Combined Usage As of 15.18 afa
9/2/13
;014.Budget
EtwiltbRin Window/Door — Total Replacement
Page 13
EFTA01124699
ℹ️ Document Details
SHA-256
97cc3847ed15cb2a78243a3f9ebf6a4c1fe4361477c464d5ca4a800b41901342
Bates Number
EFTA01124687
Dataset
DataSet-9
Document Type
document
Pages
13
Comments 0