Zorro Development Corp- Project Report 9/22/13
11 - MICROWAVE & START END EST.COST NOTES PHOTO STATUS
EC
4/27/13 — JE requested to investigate Microwave option Awaiting
5/9/13 — Existing Microwave details forwarded to JE, RK & JR Installation
5/16/13 — JE requested contacting Dave Baumann reference Date
delivery of service from Sandia Crest verses D Mark
5/17/13 — Dave Baumann forwarded details of RSM — Craig
Franck. Brice has been In contct with Craig
5/24/13 — Received bid from Southwestern Wireless, have call
set up for 5/28/13 to review bid
5/31/13 — Forwarded update of Project to JE, RK & JR
6/8/13 — Forwarded TW Telecom proposal for Delivery of Service
to JE & RK. Firm bids due 6/14/13
6/14/13 — Received bid from Southwestern Wireless confirming
details. Informed JE, will forward once all details confirmed
6/20/13 — JE approved Southwestern Wireless bid.
RK to negotiate final bid
6/27/13 — Southwestern Wireless unable to deliver bundled T1
6/28/13 — Looking into other options
7/12/13 —Awaiting proposal from Advanced Communcations
Will review proposed Link Plan with JE on site
8/14/13 — Proposal received
8/15/13 — Conference call completed with RN, BG, SD & RB
8/17/13 — Advanced Communcations on site to review Project JE
8/18/13 Confirming Advanced Communcations require Service
Provider before their can engineer final solution
8/26/13 — Filed a complaint with PRC NM regarding Century Unk
backing out of Service Provider option. 10 days to respond
8/27/13 — Contacted Steven Grabiel (High Speed Internet
Edgewood) Expect Proposal 8/6/13. Will forward once in hand
8/29/13 — Received Proposal from RMC for x 3 4Oft poles
9/17/13 — Received Proposal from High Speed Internet
Page 1
EFTA01124700
Zorro Development Corp - Project Report 9/22/13
S500.00 per mth for 10 mbps plus $10000.00 to run Ethernet
Cable to Tele Beeper shed on Sandia Crest
9/19/13 — JE approved site St by HugesNet
9/20/13 - Have forwarded info to HugesNet, awaiting installation
date. Order *5709982. Once installation is complete & account
active, final details of package will be added.
9/23/13 — Advanced Communcations expected to forward
proposal on upgrading Router & Wireless Links to RC & Lodge
Page 2
EFTA01124701
Zorro Development Corp - Project Report 9/22/13
122 - LANDSCAPING START END EST.COST NOTES PHOTO STATUS I
Mll
06/01/13 $75,000.00 3/28/13 — Refurbishment & Mainteance Proposals from 3 X Awaiting_
companies forwarded to RK & DI Direction
4/27/13 — JE approved Aspen for Refurbishment Project & Aspen
to remain as ZDC Mainteance Company
6/9/13 — New Proposal forwarded to JE, RK awaiting direction
5/16/13 — Final proposal forwarded to RK
5/24/13 — Aspen agreed to $75,000.00
5/31/13 — Deposit of $44,383.08 issued to Aspen
6/1/13 — Project Started
6/8/13 — Work continues, soil preperation in progess
6/14/13 — Plant material starting to arrive
6/18/13 — More plant materail on site
6/21/13 — Back Parking Area - Planting & Irrigation Complete
6/22/13 — Planting & Irrigation continues — attached photos
6/26/13 — More plant material on site
6/27/13 — Preperation of front parking area begins, Columbines
& Trum ert Vine lanted along pathway between Mil & Dog Pen
Irrigation installed in all planted areas — attached photos
7/12/13 — Plant & Irrigation installation continues —
Attached plant schedule & photos
7/26/13 — Project 90% Complete
Having issues locating Cypress Trees.
8/7/13 — JE decided not to install Cypress Trees, in lu Aspen will
remove 4 old Hawthorns & replace with 4 Junipers
8/9/13 — Final Breakdown of Project forwarded to JE
8/10/13 — JE to meet Jose from Aspen to review Project
8/11/13 — JE updated earlier request — remove old Hawthorns &
Junipers
8/22/13 — Forwarded to JE suggested colourful plant material,
selected for discussed areas — awaiting direction
Page 3
EFTA01124702
Zorro Development Corp - Project Report 9/22/13
8/24/13 —Awaiting Proposals from 3 vendors for Preventive
Spraying & Fertilizing of new & exisiting plant material all due by
09/24/13
9/16/13 - Aspen Landscapiraremoved old Hawthorns & Junipers
attached photos
9/22/13 - Awaiting Direction
Page 4
EFTA01124703
Zorro Development Corp - Project Report 9/22/13
22A - LANDSCAPE START END EST.COST NOTES PHOTO STATUS
LIGHTING
/27/13 — JE Approved New Landscape Lighting Pending
5/1/13 — Unable to move forward until Project 22 — Landscaping Completion
has been resolved Project 22
6/1/13 — Reviewing with Aspen about plant location
7/18/13 — Have installed Lighting where planting is complete
7/27/13 — Before proceeding will review with JE on site
8/22/13 — Will Complete Project once Project 22 — Landscaping
MH Complete
IN HOUSE - START END EST.COST NOTES PHOTO STATUS
I
06/03/13 4/27/13 — JE Approved, removal of dead Pine in courtyard, Awaiting
removal of Ponderosa Pines, Landscape Lighting at front Direction
Enterance & to relocate Pinons to the area
6/3/13 — Project Started
6/18/13 — Removal of Pine & Ponderosa Pine complete -
attached photos
7/19/13 — Relocationfinstallation of Phone from remote areas of
the Ranch to front enterance continues
7/27/13 — Project 90% complete, will review with JE while on site
8/21/13 — Reviewed area with JE, outlining scope of work
8/29/13 - Removal of dead & infected Pinions — Complete
9/18/13 — Forwarded to JE & RK estimate — hand dug & plant
Pinions by Aspen Landscaping $375.00 per tree
To purchase & plant locally 8ft tot Oft trees $150.00 per tree
Estmated number of trees, MH —12, LV —14
9/22/13 — Awaiting Direction
Page 5
EFTA01124704
Zorro Development Corp- Protect Report 9/22/13
24- MEDIA ROOM START 7 Egg EST.COST NOTES
CURTAINS PHOTO STATUS
Blackout & Rings $6,262.08 4/27/13 — JE Selected Fabric for Project Awaiting
5/10/13 — Project Request Form forwarded to JE & RK Direction
5/17/13 — Resubmitted Project Request Form to JE
5/31/13 — As of date Awaiting Direction
25 — OFFICE START END EST.COST NOTES PHOTO STATUS
CURTAINS
Lined & Rings $2,527.01 /4/27/13 - JE Selected Fabric for Project Awaiting
5/2/13 — Vendors & Manufacturer enable to provide enough Direction
yardage of selected fabric
5/9/13 —Mother fabric option forwarded to JE
5/10/13 — Project Request Form forwarded to JE & RK
5/17/13 — Resubmitted Project Request Form to JE
5/31/13 — As of date Awaiting Direction
Page 6
EFTA01124705
Zorro Development Corp - Project Report 9/22/13
27 - TERRACES START END EST,COST NOTES PHOTO STATUS
Terraces - $52,000.00 04/07/13 07/03/13 $56 200.00 12/12/12 — Bid received.
Stucco/Gutters/Painting 3/20/13 — JE Approved Bid Awaiting
$4,200.00 417/13 — Project Started Vendor to
4/20/13 — Libay Membrane installed be On Site
5/10/13 — Change Order Submitted by Vendor $2,700.00 + tax
5/16/13 —MBR Balustrade reinstalled
5/20113 — MBR Membrane to be installed
5/31/13 — There was a fault In 1 roll of material, vendor has
reordered, will recover area once on site
6/7/13 — Material on site
6/14/13 — Membranes & Gutters Complete — attached photos
8/18/13 - Stucco & Painting due to start
6/21/13 — Stucco & Painting Complete — attached photos
6/24/13 — Final review on completed work with Vendor
7/2/13 — Final Punch Out to bejin of all outstanding work
7/3/13 — Project Complete
13 — JE requested carpet to be installed on both terraces
8/9/13 — Carpet samples forwarded to JE
Carpet - $2,078.15 8/17/13 — JE selected carpet, 1 selection on back order
8/19/13 — 3 B's to meet with JE to review Project
9/3/13 — 3 B's on site to Water Test MBR Terrace
9/17/13 — Carpet on site, will be installed prior to next visit unless
given other direction
9/18/13 — Forwarded E Mail to JE & RK showing gutter issue
10/1/13 — 3 B's on site to seal gutters
Page 7
EFTA01124706
Zorro Development Corp - Project Report 9/22/13
29 - REPAIR START END EST.COST NOTES PHOTO STATUS
POOL/SPA
$12,600.00 5/9/13 — Vendor on site Awaiting
5/16/13 — Bid breakdown forwarded to RK Details from
6/10/13 — JE requested that work be started in Sept 2013 Vendor
8/20/13 — JE requested that 3 B's submit a bid for Project
9/3/13 — 3 B's on site to review Project
9/25/13 — Expecting details from 3 Ws
Page 8
EFTA01124707
corro uevelopment Corp - rroject meport urzzli.s
30- FRONT GATE START E1Q 1 EST.COST NOTES PHOTO STATUS
OPENERS
Cal Boxes/Loops 07/25/13 $10,125.00 4/20/13 — Bid received, requested vendor to make adjustments Awaiting
+ tax 5/9/13 — Received Revised bid. Options & Equipment reviewed Delivery of
5/12/13 — Options & Equipment selected Gate Loops
5/21/13 —Final bid faxed, unreadable, vendor will resend to Vendor
6/8/13 — Final bid from RMC Electric - $11,941.00
6/11/13 — RK requested material breakdown
6/14/13 — Material breakdown forwarded to RK
6/19/13 — RMC Electric resubmitted revised pricing to RK
6/28/13 — RK requested that 3 B's submit an estimate. Have
contacted 3 B's, they will be on site next week to review
7/9/13 — RK neogiated 3 B's bid
7/11/13 — 3 B's Bid Approved.
7/12/13 — Forwarded Deposit Request $6,750.00 to BK & RK
7/25/13 — Project Started
7/27/13 — Gate 1 Controllers & Key Pad installed. New Key Pad
for Gate 2 faulty, vendor has reordered — attached photos
8/10/13 — Waiting for Installation of loops & Gate 2 Key Pad
8/19/13 — Vendor to meet JE
8/21/13 — Gate 2 Key Pad installed, gate phone lines down,
hence no remote control to operate gates
8/30/13 — Contacted RMC regarding phones & gate controllers
will be on site next week
9/2/13 — As of date Gate Loops Not Installed
9/3/13 — 3 B's on site to review Project
9/18/13 — The bid that 3 B's neogiated with RK did not include the
purchase or installation of gate loops, which was on the orginal
bid submitted by RMC Electric & E Mail submitted to 3 B's by BG
Change Order $435.00 9/17/13 — Change Order submitted from 3 B's
+ shipping 18/13 — Submitted Change Order to JE & RK
$60.00 9/18/13 — JE Approved Change Order
9/21/13 — Awaiting delivery of Gate Loops to Vendor
Page 9
EFTA01124708
Zorro Development Corp - Project Report 9/22/13
31 - PHONES MAIN START END EST.COST NOTES PHOTQ
HOUSE STATUS
07/17/13 4/27/13 — JE approved installation of new phones at MH Awaiting
Awaiting for Service Provision & Estimated Cost of Delivery of Delivery of
Services from Prof 21 — Microwave & IT before moving forward Phones
6/22/13 — Awaiting response from Southwestern Wireless on to Vendor
FCC License Application & Router at MH
7/17/13 — Project Started
7/25/13 — Switch & 16 Phones Installed, awaiting delivery date
remainder of phones — attached photos
9/6/13 — Phones due to be deliveried to Vendor
9/15/13 — Delivery of phones to vendor have been delayed
9/30/13 — Phones due to be detiveried to Vendor
32— PHONES RANCH START J EST.COST NOTES
CENTRAL PHOTO STATUS
6/21/13 - Will forward proposal for Phone System by 8/28/13 Project
6/27/13 - Project On Hold until Microwave Solution resolved On Hold
Page 10
EFTA01124709
Zorro Development Corp- Project Report 9/22/13
33 - POOL PAC START 1 AtI2 EST.COST NOTES PHOTO SIAM
Engineering Inspection 4/29/13 — Quote forwarded to RK, who requested more detail
Awaiting
39,100.00 5/8/13 — Revised quote forwarded to RK, awaiting direction
Site
5/22/13 — Beaudin Ganze on site to review Project
Unit Cost visit
5/29/13 — Beaudin Ganze report forwarded to JE & RK
$43,170.00 5/29/13 —JE Approved invesigation via camera
6/3/13 — JBH forwarded estimate
Camera Duct Inspection 6/4/13 — JE Approved moving ahead
$1,214.91 6/11/13 — JBH due on site
6/12/13 — JBH on site, complete camera inspection, awaiting
Report/Disc
6/21/13 — Report/Disc forwarded to Beaudin Ganze
7/8/13 — Report/Disc due on site
7/9/13 — Informed that Report has been delayed
RK forwarded Report to JE
7/20/13 — Beaudin Ganze on site to review Project with JE
JE did not approve any design solutions by Beaudin Ganze
8122/13 — Contacted Dessert Air & forwrded info regarding
existing space & equipment design
9/18/13 - Site visit expected by Dessert Air to confirm their
proposed solution
9/19/13 — Dessert Air have rescheduled for 9127/13
Page 11
EFTA01124710
Zorro Development Corp - Project Report 9/22/13
1
14 — REPAIR d, PAINT
WORK — ION
START FAQ EST.COST NOTES Eli= STATUS
5/7/13 — E Mailed Photos to JE showing work required
Awaiting
5/23/13 — Forwarded all work details to Ion, Including work that Direction
will be required after MBR Terrace is completed
6/29/13 — Additional work — Sign on Adobe. Sarah's Office Wall
6/30/13 — As of date Awaiting Direction
NOTES PHOTO SIAM
Plugging ' Hole $15,000.00 Estimate to Plug 1st Hole
Page 12
EFTA01124711
Zorro Development Corp- Project Report
38 - SEPTIC SYSTEM START €ND EST.COST NOTES
Mai PHOTQ STATUS
07/10/13 7/9/13 — E Mail forwarded to RK —Adobe Septic System Is Awaiting
blocked. ZDC unable to clear line Date When
7/10/13 — Bassett Construction on site to review system, inspect Vendor
lines with camera. Found compressed line under the Adobe Will Start
outside deck. Work Completed at $533.04 Project
7/11/13 — ZDC will remove pavers after visit, Bassett Construction
'will complete repair & ZDC will reconstruct deck area — attached
photos
8/9/13 — Received Estimate from Bassett Construction to
replace main sewer line, install new cleanouts & PVC pipe
$3,740.83
8/20/13 — Forwarded bid to JE
8/22/13 — JE request that 3 B's submit bid
9/3/13 — 3 B's on site to review Project
9/16/13 — Received Estmate from 3 B's - $2,200.00 + tax
9/17/13 — 3 B's estimate & photos forwarded to JE & RK
9/17/13 — JE Approved 3 B's bid
9/22/13 — Awaiting timetable for 3 B's to complete project
X= START RIR EST.COST EMU PHOTO
REFURBISHMENT STATUS
ROADS CULVERTS
7/27/13 — Will review with JE on site, refurbishment of all Roads &
Culverts
8/5/13 — Road Base 23 tons $360, Culvert Oft x 24ft - $1,381.85
Culvert 5ft x 24ft - $1,727.24
40 - LANDSCAPING START END gST.COST NOTES
LOG & LODGE EliQLQ SIATIM
Removal of Dead Trees, Cover Rocks with Soil
Page 13
EFTA01124712
Zorro Development Corp - Project Report 9/22/13
41= START Ef4Q EST.COST NOTES PHOTO, STATUS
REFURBISHMENT
HOME THEATER
8/13/13 — JE requested replacement of exisiting Sony Projector Awaiting
8/15/13 — 3 Vendors on site — Proposals due next week HDMI Cable
8/22/13 — JE forwarded 2 Proposals Delivery
8/25/13 — Received 3f° Proposal
JE requested Purchase of Pro*tor to be placed On Hold as
new projector to be released Dec 2013
$83.06 9/17/13 — JE approved purchase of HDMI Cable
$320.00 + tax 9/17/13 — JE approved 3 B's installation of HDMI Cable
9/18/13 — HDMI Cable ordered
9/25/13 — HDMI Cable due on site
at START END gST.COST NOTES PHOTO
REFURBISHMENT STATUS
[EXTERIOR - LV
$10,100 + tax 8/22/13 - JE Approved Project Awaiting
3 B's to complete MH. ZDC to complete Garage Vendor
9/3/13 - Requested RK & BK for Deposit of $7,500.00 to be on
Deposit received by 3 B's Site
9/24/13 — 3 B's due on site
IN HOUSE START END EST.cOsT VOTER
REFURBISHMENT
PHOTO STATUS
LANDSCAPING — LV
8122113 — JE Approved Project Awaiting
Cover Rock with soil, Pinion installation Direction
8/22/13 — Forwarded JE sugiested colourful plant material
for discussed areas — awaiting direction
9/16/13 — Router Tilling Complete. Ready for Top Soil
9/18/13 — Forwarded JE & RK breakdown of installation/purchase
etc of sod. Total $5,512.50
9/18/13 — JE asked how much sod. 5,350 sq ft
9/21/13 — Awaiting Direction
Page 14
EFTA01124713
Zorro Develo ment Co - Project Report 9/22/13
(PURCHASES START END __Z§T.COST NOTES
Heavy Machinery PHOTOITATUa
8/22/13 — JE requested Investigating a Bulldozer purchase & any
other equipment ZDC may require
8/27/13 — Investigating avaiable equipment
Bobcat 9/3/13 — Investigating trading exisiting Bobcat for new
9/18/13 — Have price from local Bobcat dealer, as of date no one
has been able to match this price
9/26/13 — Will forward all offers in reference to Bobcat
1989 Dump Truck 9/22/13 —1989 Dump Truck rNuires new transmission
9/26/13 —Will forward estimates
Outside Furniture - 8/22/13 - JE agreed new outside furniture required, will relocate
Lodge sang table & benches from Shooting Range to uncovered back
deck
9/1/13 — Will investigate funfture options for covered back deck
, 9/16/13 — After reviewing uncovered deck, we believe that the
deck will not handle the weight of the table & benches from the
Shooting Ranch, especially if we receive snow
9/22/13 — Will investiage all options over the next week
Page 15
EFTA01124714
Zorro Development Corp- Pro ect Report 9/22/1
ZE:C
IN HOUSE WORK
CACTUS REMOVAL START END EST.COST NOTES PHOTQ STATUS
To begin Late Fall
SHED AT AWOL ART
ST EMI EST.COST NQIU ILOW_
Reskin, Paint & Seal - work to begin in the Fall
ODGE ROOF END EST.COST NOTES PHOTO STATUS
Repair/Replace Broken Sections — work to begin in the Fall
YURT FURNITURE START END EST.COST NOTES PHOTO
8/22/13 — JE Approved reconstruction of existing furniture to
SIAM
make items more resilient to mice attack
8/19/13 — Old fabric backing has been removed from sofa/chairs
Ma START E ASISDIL NOTES PHOTQ STATUS
8/18/13 — Additional New Tank Installed
Repainting of tanks, matting & gravel installation to begin
in the Fall
GRAVEL/EDGES RC START MR CST.COST NOTES
PATHS PHOTO STATUS
Al paths to be dug out, edged and gravel Installed to begin early
early Summer 2014
LOG CABIN STEPS START en_ EST.COST NOTES PHOTO $TA
New Section to be refabricated
CATTLE GATES & START END EST.COST NOTES
GUARDS X 3 PHOTO SIAM
Refurbishment, Empty & Paint
Page 16
EFTA01124715
Zorro Development Corp - Project Report 9/22/13
PAINTINGISTAINING/ START END EST.COST NOTES
SEALING PHOTO STATUS
RC Office Interior 09/12/13 09/17/13 $83.43 Repainting of wall, ceiling, windows & doors Complete
Pool Meth Storage 09/13/13 09/18/13 NA Repainting of walls, floor & door — attached photo X Complete
RC 3 Bay Garage 09/17/13 09/20/13 NA Repainting of walls, floor & door — attached photo X Complete
Hay Barn 09/19/13 09/20/13 $761.64 Mess Sealing on Ceiling Complete
Reservior Repainting to be completed over the Fall
RC Meth Bays Painting to be completed over the Winter
Firehouse Interior Painting to be completed over the Winter
Stables 7/8/13 — Inside/Outside Lights repainted
Inside resurfacing, painting, staining, concrete floors
to be completed over the Winter
Resealing outside to begin Early Summer 2014
Adobe, Log & Lodge Resealing of outside & deck refurbishment to begin early
Summer 2014
WELLS
IpAKOTA & K
Combined Usage As of 15.71 afa
9/19/13
nalisat
Bunkhouse Window/Door - Total Replacement
Page 17
EFTA01124716
ℹ️ Document Details
SHA-256
91be7880135d193838d778a61c6eded4bf27a11af21ee0de059b6a8228c40705
Bates Number
EFTA01124700
Dataset
DataSet-9
Document Type
document
Pages
17
Comments 0