📄 Extracted Text (3,413 words)
Zorro Development Corp - Project Report 9/27/13
21 - MICROWAVE & 7 —
EST.COSI NOTES PHOTO STATUS
Li
4/27/13 - JE requested to investigate Microwave option HugesNet
5/9/13 — Existing Microwave details forwarded to JE, RK & JR Due On Site
5/16/13 — JE requested contacting Dava Baumann reference 09/30/13
delivery of service from Sandia Crest verses D Mark
5/17/13 — Dava Baumann forwarded details of RSM — Craig
Franck. Brice has been in contct with Craig
5/24/13 — Received bid from Southwestern Wireless, have call
set up for 5/28/13 to review bid
5/31/13 — Forwarded update of Project to JE, RK & JR
6/8/13 — Forwarded TW Telecom proposal for Delivery of Service
to JE & RK Firm bids due 6/14/13
8/14/13 — Received bid from Southwestern Wireless confirming
details. Informed JE, will forward once all details confirmed
Approval JE 6/20/13 — JE approved Southwestern Wireless bid.
RK to negotiate final bid
6/27/13 — Southwestern Wireless unable to deliver bundled T1
6/28/13 — Looking into other options
7/12/13 — Awaiting proposal from Advanced Commutations
Will review proposed Link Plan with JE on site
8/14/13 — Proposal received
8/15/13 — Conference call completed with RK, BG, SD & RB
8/17/13 — Advanced Communcations on site to review Project JE
8418/13 — Confirming Advanced Communcations require Service
Provider before their can engineer final solution
8/26/13 — Filed a complaint with PRC NM regarding Century Link
backing out of Service Provider option. 10 days to respond
8/27/13 — Contacted Steven Grabiel (High Speed Internet
Edgewood) Expect Proposal 8/6/13. Will forward once in hand
8/29/13 — Received Proposal from RMC for x 3 40ft poles
Page 1
EFTA01124717
Zorro Development Corp - Project Report 9/27/13
r
/17/13 — Received Proposal from High Speed Internet
$500.00 per mth for 10 mbps plus $10000.00 to run Ethernet
Cable to Tele Beeper shed on Sandia Crest
Aporoval JE 9/19/13 — JE approved site vist by HugesNet
9/20/13 — Have forwarded info to HugesNet, awaiting installation
date. Order #5709982. Once installation is complete & account
active, final details of package will be added.
/23/13 — Received proposal from Advanced Communcatlon
on upgrading Router & Wireless Links to RC & Lodge
/27/17 - Forwarded to RK & DI proposals from RMC Electric
& Advanced Communcafions.
9/30/13 — HugesNet due on site
Page 2
EFTA01124718
Zorro Development Corp_- Project Report 9/27/13
a2 -LANDSCAPING i START END gET.COST NOTES PHOTO STATUS -1
MH
06/01/13 $75,000.00 3/28/13 Refurbishment & Mainteance Proposals from 3 X AwaltIngj
companies forwarded to RK & DI Direction
ADoroval JE 4/27/13 - JE approved Aspen for Refurbishment Project & Aspen on
to remain as ZDC Mainteance Company Fowarded
5/9/13 — New Proposal forwarded to JE, RK awaiting direction E Malls
5/16/13 — Final proposal forwarded to RK dated
5/24/13 — Aspen agreed to $75,000.00 08/22/13
5/31/13 — Deposit of $44,383.08 issued to Aspen 09/26/13
6/1/13 — Project Started 09/27/13
618/13 — Work continues, soil preparation in progess
6/14/13 — Plant material startin' to arrive
6/18/13 — More plant materail on site
6/21/13 —Back ParkingSrea - Planting & Irrigation Complete
6/22/13 — Planting & Irrigation continues — attached photos
6/26/13 — More plant material on site
6/27/13 — Preparation of front parking area begins, Columbines
& Trumped Vine planted along pathway between MH & Dog Pen
Irrigation installed in all planted areas —attached photos
7/12/13 — Plant & Irrigation installation continues —
Attached plant schedule & photos
7/26/13 — Project 90% Complete
Having Issues locating Cypress Trees.
8/7/13 — JE decided not to install Cypress Trees, in lu Aspen will
remove 4 old Hawthorns & replace with 4 Junipers
8/9/13 — Final Breakdown of Project forwarded to JE
8/10/13 — JE to meet Jose from Aspen to review Project
8/11/13 — JE updated request — remove old Hawthorns & Junipers
8/22/13 — Forwarded to JE suggested colourful plant material,
selected for discussed areas — awaiting direction
Page 3
EFTA01124719
Zorro Development Corp - Project Report 9/27/13
8/24/13 — Awaitin_g Proposals - 3 vendors for Preventive Spraying
& Fertilizing of new & exisiting plant material due by 9/24/13
9/16/13 — Aspen Landscapirig removed old Hawthorns & Junipers
attached photos
W22/13 — Awaiting Direction
9/26/13 — Forwarded to RK 3 Proposals for Preventive Spraying
Fertilizing
9/27/13 — Forwarded to JE & RK photo of proposed Blue Spruce
— 7 it, larger would be available in the Spring - attached photo
Page 4
EFTA01124720
corro ueveiopment Corp - rroject import viztrhs
22A - LANDSCAPE START EN EST.COST NOTES PHOTO STATUS
LIGHTING
4/27/13 — JE Approved New Landscape Lighting Pending
5/1/13 - Unable to move forward until Project 22 — Landscaping Completion
has been resolved Project 22
6/1/13 — Reviewing with Aspen about plant location
7/18/13 — Have installed Lighting where planting is complete
7/27/13 — Before proceeding will review with JE on site
8/22/13 — Will Complete Project once Project 22 — Landscaping
MH Complete
IN HOUSE - START END EST.COST NOTES PHOTO STATUS
LANDSCAPING
06/03/13 4/27/13 — JE Approved, removal of dead Pine in courtyard, Awaiting
removal of Ponderosa Pines, Landscape Lighting at front Vendors
Enterance & to relocate Pinons to the area Propal
6/3/13 — Project Started
6/18/13 — Removal of Pine & Ponderosa Pine complete -
attached photos
7/19/13 — Relocation/Installation of Pinons from remote areas of
the Ranch to front enterance continues
7/27/13 — Project 90% complete, will review with JE while on site
8/21/13 — Reviewed area with JE, outlining scope of work
8/29/13 - Removal of dead & infected Pinions — Complete
9/18/13 — Forwarded to JE & RK estimate — hand dug & plant
Pinions by Aspen Landscaping $375.00 per tree
To purchase & plant locally 8ft to10ft trees $150.00 per tree
Estmated number of trees, MH —12, LV —14
9/22/13 — Awaiting Direction
Aoonoval JE 9/24/13 — JE Approved purchase of local Pinions at $150.00 per
tree, awaiting proposal due 9/30/13
Page 5
EFTA01124721
Zorro Development Corp - Project Report 9/27/13
24 migra&BgAig START f_f_%/p. EST.COST NOTES ' PHOTO STATUS
CURTAINS
Blackout & Rings $6,262.08 4/27/13 -JE Selected Fabric for Project Awaiting
5/10/13 — Project Request Form forwarded to JE & RK Direction
5/17/13 — Resubmitted Project Request Form to JE
5/31/13 — As of date Awaiting Direction
25 — OFFICE START OM EST.COST NOTES
CURTAINS PHOTO STATUS
Lined & Rings $2,527.01 4/27/13 - JE Selected Fabric for Project Awaiting
5/2/13 — Vendors & Manufacturer enable to provide enough Direction
yardage of selected fabric on
5/9/13 — Another fabric option forwarded to JE Forwarded
5/10/13 — Project Request Form forwarded to JE & RK E Mall
5/17/13 — Resubmitted Project Request Form to JE dated
5/31/13 — As of date Awaiting Direction 05117113
Page 6
EFTA01124722
corro ueveiopment Corp - rroject neport u/z111.-1
V- TERRACES START END ! EST.COST NOTES PHOTO STATUS
Terraces - $52,000.00 04/07/13 $56 200 00 12/12/12 — Bid received. X Awaiting
Stucco/Gutters/Paintint_ 3/20/13 — JE Approved Bid
$4,200.00 Proposal ,
4/7/13 — Project Started from
4/20/13 — Libary Membrane installed 3 B's
5/10/13 — Change Order Submitted by Vendor $2,700.00 + tax
5/16/13 — MBR Balustrade reinstalled
5/20/13 — MBR Membrane to be installed
5/31/13 -A fault in 1 roll of material, vendor has reordered
'6/14/13 — Membranes & Gutters Complete — attached photos
6/21/13 — Stucco & Painting Complete — attached photos
6/24/13 — Final review on completed work with Vendor
7/2/13 — Final Punch Out to begin of all outstanding work
7/3/13 — Project Complete on Telescope Terrace
stem — JE requested carpet to be installed on both terraces
Carpet - $2,078.15 8/17/13 — JE selected carpet, 1 selection on back order
8/19/13 — 3 B's to meet with JE to review Project
9/3/13 — 3 B's on site to Water Test MBR Terrace
9/17/13 — Carpet on site, will be installed prior to next visit unless
_given other direction
9/18/13 — Forwarded E Mail to JE & RK showing gutter Issue
9/24/13 — 3 B's on site, sealed existing gutter cap & water tested
leaders.
9/27/13 — Forwarded E Mail to JE & RK noting prexisting issue,
seperate to the leak on the Princess Deck ceiling
PVC elbow connected tojutter spout, therefore backup water
causing overflow in metal moulding & task' of terrace
Leaders sealed correctly, terrace & gutter flooded with water -
no leaking from ceiling
Water sprayed on wall below windows — leaking occurred, 3 B's
temporarily sealed area.
3 B's recommend cutting section of stucco & flash area correctly
attached photos
10/3/13 — 3 B's Proposal to be forwarded
Page 7
EFTA01124723
Zorro Development Corp - Project Report 9/27/13
,29- REPAIR START T END EST.COST NOTES PHOTO STATUS
KVILSPA
5/9/13 — Vendor on site
5/16/13 — Bid breakdown forwarded to RK
6/10/13 — JE requested that work be started In Sept 2013
8/20/13 — JE requested that 3 B's submit a bid for Project
9/3/13 — 3 B's on site to review Project
9/24/13 — 3 B's declined moving forward with Project
9/24/13 — JE approved moving forward with replastering of Pool
&Cleaning Spa tile
9/27/13 — Forwarded Proposal to RK from Lee Sure Pools
10/4/13 — Lee Sure Pools, due on site to start Project
Page 8
EFTA01124724
Zorro Development Corp - Project Report 9/27/13
- FRONT GATt
OPENERS START LBO EST.COST NOTES PHOTO STATUS
Call Boxes/Loops 07/25/13 $10,125.00 4/20/13 — Bid received, requested vendor to make adjustments Awaiting
+ tax 5/9/13 — Received Revised bid. Options & Equipment reviewed Delivery of
5/12/13 — Options & Equipment selected Gate Loops
5/21/13 — Final bid faxed, unreadable, vendor will resend to 3 B's
6/8/13 — Final bid from RMC Electric - $11,941.00
6/11/13 — RK requested material breakdown
6/14/13 — Material breakdown forwarded to RK
6/19/13 — RMC Electric resubmitted revised pricing to RK
6/28/13 — RK requested that 3 B's submit an estimate. Have
contacted 3 B's, they will be on site next week to review
7/9/13 — RK neogiated 3 B's bid
Approve( RK 7/11/13 — 3 B's Bid Approved.
7/12/13 — Forwarded Deposit Request $6,750.00 to BK & RK
7/25/13 — Project Started
7/27/13 — Gate 1 Controllers & Key Pad installed. New Key Pad
for Gate 2 faulty, vendor has reordered — attached photos
8/10/13 — Waiting for installation of loops & Gate 2 Key Pad
8/19/13 — Vendor to meet JE
8/21/13 — Gate 2 Key Pad installed, gate phone lines down,
hence no remote control to operat ates
8/30/13 —Contacted RMC regarding phones & gate controllers
will be on site next week
9I7J13 — As of date Gate Loops Not Installed
9/3/13 — 3 B's on site to review Project
9/16/13 — The bid that 3 B's neogiated with RK did not indude the
purchase or installation of gate loops, which was on the orginal
bid submitted by RMC Electric & E Mail submitted to 3 B's by BG
Change Order $435.00 9/17/13 — Change Order submitted from 3 B's
+ shipping 9/18/13 — Submitted Change Order to JE & RK
Approval re $60.00 9/18/13 — JE Approved Change Order
9/21/13 — Awaiting delivery of Gate Loops to Vendor
Page 9
EFTA01124725
Zorro Development Corp - Project Report 9/27/13
31 - PHONES MAIN START END EST.COST NOTES PHOTO STATUS
HOUSE
07/17/13 4/27/13 — JE approved installation of new phones at MH Awaiting
Awaiting for Service Provision & Estimated Cost of Delivery of Delivery of
Services from Proj 21 — Microwave & IT before moving (onward Phones
6/22/13 — Awaiting response from Southwestern Wireless on to Vendor
FCC License Application & Router at MH
7/17/13 — Project Started
7/25/13 - Switch & 16 Phones Installed, awaiting delivery date
remainder of phones — attached photos
9/6/13 — Phones due to be deliveried to Vendor
9/15/13 — Delivery of phones to vendor have been delayed
9/30/13 — Phones due to be deliveried to Vendor
32 — PHONES RANCH START END EST.COST NOTES PHOTO STATUS
CENTRAL
8/21/13 - Will forward proposal for Phone System by 6/28/13 Project
6/27/13 - Project On Hold until Microwave Solution resolved On Hold
Page 10
EFTA01124726
Zorro Development Corp - Project Report 9/27/13
33 - POO1. PAC START END EST COST I NOTES PHOTO, STATUS
Engineering Inspection 4/29/13 - Quote forwarded to RK, who requested more detail Awaiting
$9,100.00 5/8/13 — Revised quote forwarded to RK, awaiting direction Pool Pae
Unit Cost 5/22/13 — Beaudin Ganze on site to review Project Rep Site
$43,170.00 5/29/13 — Beaudin Ganze report forwarded to JE & RK Visit
A •Droval JE 5/29/13— JE Approved invesigation via camera
613/13 — JBH forwarded estimate
4proyal .IF 6/4/13 — JE Approved moving ahead
Camera Duct Inspection 6/11/13 — JBH due on site
$1,214.91 6/12/13 — JBH on site, complete camera inspection, awaiting
Report/Disc
6/21/13 — Report/Disc forwarded to Beaudin Ganze
7/8/13 — Report/Disc due on site
7/9/13 — Informed that Report has been delayed
RK forwarded Report to JE
7/20/13 — Beaudin Ganze on site to review Project with JE
JE did not approve any design solutions by Beaudin Ganze
8/22/13 — Contacted Dessert Air & forwrded info regarding
existing space & equipment design
9/18/13 — Site visit expected by Dessert Air to confirm their
proposed solution
9/19/13 — Dessert Air have rescheduled for 9/27/13
Approval Je 9/24/13 — JE approved investigating purchase of new Pool Pac
9/25/13 — Dessert Air pending visit — placed on hold
9/30/13 — Trane Pool Pac Rep due on site
Page 11
EFTA01124727
Zorro Development Corp - Project Report 9/27/13
34 - REPAIR & PAINT i START END EST.COST NOTES
WORK - ION PHOTO STATUS
5/7/13 — E Mailed Photos to JE showing work required Awaiting
5/23/13 — Forwarded all work details to Ion, including work that Direction
will be required after MBR Terrace is completed
6/29/13 — Additional work — Sign on Adobe, Sarah's Office Wall
6/30/13— As of date Awaiting Direction
37 — WELL K START OD na NOIES
Plugging 1° Hole $15,000.00 Estimate to Plug 1 st Hole
11S19 11614/.._
Page 12
EFTA01124728
Zorro Development Corp - Project Report 9/27/13
38 - SEPTIC SYSTEM START END ' EST.COST NOTES
ADOBE PHOTO STATUS 1
07/10/13 09/27/13 $2,200.00 7/9/13 — E Mall forwarded to RK — Adobe Septic System is X Project
+ tax blocked. ZDC unable to clear line Complete
7/10/13 — Bassett Construction on site to review system, inspect
lines with camera. Found compressed line under the Adobe
outside deck. Work Completed at $533.04
7/11/13 ZDC will remove pavers after visit, Bassett Construction
will complete repair & ZDC will reconstruct deck area — attached
photos
8/9/13 — Received Estimate from Bassett Construction to
replace main sewer line, install new cleanouts & PVC_pipe
$3,740.63
8/20/13 — Forwarded bid to JE
8/22/13 JE request that 3 B's submit bid
9/3/13 — 3 B's on site to review Project
9/17/13 — 3 B's estimate & photos forwarded to JE & RK
&amid JE 9/17/13 — JE Approved 3 B's bid
9/22/13 — Awaiting timetable for 3 B's to complete project
9/24/13 — Removal of pavers & trenching started
9/25/13 — Removal of damaged pipe & drain — complete
9/28/13 — New pipe & drain installed, system working
9/27/13 — Back filling, pavers reinstalled — attached photos
9/27/13 — Project Complete
- START END EST.COST NOTES PHOTO STATUS
REFURBISHMENT
ROADS CULVERTS
7/27/13 — Will review with JE on site, of all Roads &Culverts X
8/5/13 — Road Base 23 tons $360, Culvert 4ft x 24ft - $1,381.85
Culvert 5ft x 24ft - $1,727.24
9/27/13 — Due to high water flow/rain, culvert gone from under,
road, no access to North Gate Road, past the Caboose
attached photos
Page 13
EFTA01124729
Zorro Development Corp - Project Report 9/27/13
Ir- LANDSCAPING
OG & LODGE
START END EST.COST NOTES
Removal of Dead Trees, Cover Rocks with Soil
PHOTO STATUS
41 START END EST.COST NOTES
REFURBISHMENT PHOTO STATUS
HOME THEATER
8/13/13 — JE requested replacement of exisiting Sony Projector Awaiting
8/15/13 3 Vendors on site — Proposals due next week HDMI Cable
8/22J13 — JE forwarded 2 Proposals Delivery
8/25/13 — Received 31° Proposal
JE requested Purchase of Projector to be placed On Hold as
new projector to be released Dec 2013
Aoproval JE $83.06 9/17/13 — JE approved purchase of HDMI Cable
$320.00 tax 9/17/13 — JE approved 3 B's installation of HDMI Cable
9/18/13— HDMI Cable ordered
9/25/13 — HDMI Cable due on site
42— START EfQ EST.COST NOTE PHOTO STATUS
REFURBISHMENT
EXTERIOR - LV
09/24/13 $10,100 + tax 8/22/13 — JE Approved Project
3 B's to complete MH. ZDC to complete Garage
9/3/13 — Requested RK & BK for Deposit of $7,500.00
Deposit received by 3 B's
9/24/13 — Project Started
9/27/13 — Work continues — attached photos
Page 14
EFTA01124730
Zorro Development Corp - Pro ect Report 9/27/13
43 - REFURBISHMENT START 1 gNo EST.COST NOTES PHOTO STATUS
LANDSCAPING — LV
8/22/13 — JE Approved Project Awaiting
Cover Rock with soil, Pinion installation New
8/22/13 — Forwarded JE suggested colourful plant material Estimates
for discussed areas — awaiting direction for Sod
9118/13 — Router TiHing Complete. Ready for Top Soil
9/18/13 — Forwarded JE & RK breakdown of installation/purchase
etc of sod. Total $5,512.50
9/18/13 — JE asked how much sod. 5,350 sq ft
9/27/13 — Reviewing sod estimates, will reforward 10/1/13
MrAQINESCQE EABI ENQ EST.COST NOTES PHOTO SIAM
9/27/13 — Forwarded JE & RK estimate to repair Lodge Roof X
attached estimate & photos
9/27/13 — JE Did Not Approve Project
45 — NORTH GATE START ENQ gST.COST NOTES PHOTQ STATUS
FENCE REPAIR
9/27/13 — Due to high water flow/rain, North Gate Fence line as X
been washed out — approx 150 ft needs to be replaced/repaired
attached photos
9/30/13 — Work to begin
Page 15
EFTA01124731
Zorro Development Corp - Project Report 9/27/13
PURCHASES START i END FST.00ST OM PHOTO STATUS
Heavy Machinery 8/22/13 — JE requested investigating a Bulldozer purchase & any
other equipment ZDC may require
8/27/13 — Investigating avaiable equipment
Bobcat 9/3/13 — Investigating trading exisiting Bobcat for new
9/18/13 — Have price from local Bobcat dealer, as of date no one
has been able to match this price
10/3/13 - Will forward all offers
1989 Dump Truck 9/22J13 —1989 Dump Truck requires new transmission
9/27/13 — Dump Truck was hauled, estimate expected 10/4/13
Outside Furniture — 8/22/13 — JE agreed new outside furniture required, will relocate
Lodge exiitng table & benches from Shooting Range to uncovered back
deck
9/1/13 — Will investigate funiture options for covered back deck
9/16/13 — After reviewing uncovered deck, we believe that the
deck will not handle the weight of the table & benches from the
Shooting Ranch, especially if we receive snow
9/22/13 — Will investiage all options over the next week
9/27/13 — Will forward suggestions 10/4/13
Page 16
EFTA01124732
Zorro Development Corp - Project Report 9/27/13
7O -
IN HOUSE WORK
CACTUS REMOVAL STMT gat EST.COST NOTES PHOTO BMW
To begin Late Fall
SHED AT ADOBE START Dv EST.COST NOM PHOTQ STATUS
Resign, Paint & Seal — work to begin in the FaN
TUFT FURNITURE START END EST.COST NOTES PHOTO STATUS
8/22/13 — JE Approved reconstruction of exisitng furniture to
make Items more resilient to mice attack
8/19/13 — Old fabric backing has been removed from sofa/chairs
FUEL STORAGE START END Pia $OTES PHOTO STATUS
8/18/13 — Additional New Tank Installed
Repainting of tanks. matting & gravel installation to begin
n the Fall
GRAVEUEDGES RQ START END EST.COST NOTES
PATHS PHOTO STATUS
All paths to be dug out edged and gravel installed to begin early
early Summer 2014
LOG CABIN START gm EST.COST NOTES
New Section to be refabricated
!JIM STATUS
CATTLE GATES A START END EST.COST NOTES PHOTO
GUARDS X 3 STATUS
Refurbishment, Empty & Paint
WOODEN PENES T NOTES PHOTO STATUS
RC Wooden Fences require replacement
Page 17
EFTA01124733
Zorro Development Corp - Protect Report 9/27/13
PAINTING/STAINING/ T START END EST.COST NOTES PHOTO STATUS
SEALING J J
Reservior Repainting to be completed over the Fall
RC Mech Bays Painting to be completed over the Winter
MN Mech Says Painting to be completed over the Winter
Firehouse Interior Painting to be completed over the Winter
Stables 7/8/13 — Inside/Outside Lights repainted
Inside resurfacing, painting, staining, concrete floors
to be completed over the Winter
Resealing outside to begin Early Summer 2014
Adobe Exterior Repainting of all stucco to begin early Summer 2014
Adobe, Log & Lodge Resealing of outside & deck refurbishment to begin early
Summer 2014
WELLS
'DAKOTA & K
Combined Usage As of 16 afa
9/27/13
$14 Budget
Bualsboat [Windar4Door- 1otal Replacement
Page 18
EFTA01124734
ℹ️ Document Details
SHA-256
d8aab645af2969e1ce7efdeab654ba6ab2d6cce68c31df634ecf844dee79edab
Bates Number
EFTA01124717
Dataset
DataSet-9
Document Type
document
Pages
18
Comments 0