72- WATER START END EST.COST NOTES PHOTO STATUS
DEVELOPMENT
5/6/2014 Continuing Pumping Water working on the target-68afa
4/4/19 - CC forwarded E Mail with Updated Water Level Charts for
Wells B & K. Well K is good, Well B need to keep an eye on getting
close to 20ft.
4/8119 - New Readings will be taken & forwarded to CC for review
96B - PAVING OF START END EST.COST NOTES PHOTO STATUS
ROADWAY
6/29/2017 3118119 - Received letter from Calvert & Menlcucci - Collections
Ag ency for Universal Construction, Inc. Forwarded to RK & DI.
3/20/19 - A Complete Timeline. Details, E Mails & Photos
forwarded to DI & RK
3/26/19 - DI contacted BG requesting details on Project
3/26/19 - BG forwarded Universal Construction Contract &
Corresponding Maps, highlighting areas of concern. Other
Contractors have indicated a Overlay would help, but not resolve all
the issues. As soon as they apply the fix the road will look Patchy
—1--
3/29/19 - Forwarded to DI more Photos/Timeline & Reconfirmed
Areas of Concern
102 - LUTRON START Eta NOTES PHOTO STATUS
SYSTEM - MH
2/22/2019 3/12/18 - Lutron Rep On Site. Reviewed system with Randy from
RMC Electric. Existing system was designed for local control at the
physical switches not controlled by the Lutron system in the Mech
Rooms, therefore will be difficult, but not impossible to upgrade.
Lutron are reviewing the options
4/4/19 - Lutron where due Back On Site with RMC Electric, Lutron
cancelled meeting due to work emergency. Awaiting new date
118B PURCHASE START EST.COST NOTES PHOTO STATUS
WATER TRUCK
Will review with JE On Site Pending
118C - PURCHASE START END EST.COST NOTES PHOTO STATUS
GRADER
Will review with JE when On Site Pending
Page 1
EFTA00811083
135 - START END EST.COST NOTES PHOTO STATUS
REFURBISHMENT
RED HOUSE
1/21/2019 4/2/19 - Work by House Incorporated - Complete x
4/2/19 - Chimney Cap Installed x
4/3/19 - Shower Enclosures due to be Installed 4/15/19
4/4/19 - Chavez Family started moving back into House
4/5/19 - "In House" - Stairline Railing remaining work
4/5/19 - Final Invoice from House Incorporated forwarded to RK for Awaiting
approval Response
135A - START END EST.COST NOTES PHOTO STATUS
PURCHASE/INSTALL
AC SPLIT UNIT &
FURNACE -RED
HOUSE
2/19/2019 3/28/19 - Airpro Completed Install
3/29/19 - RMC Electric Completed Electrical Hook Up
4/4/19 - Unit Working 100%
$10,644.85 4/5/19 - Airpro Payment Complete
Awaiting Final Invoice from RMC Electric Awaiting RMC
Invoice
138 - START END EST.COST NOTES PHOTO STATUS
PURCHASE/INSTALL
AC SPLIT UNIT &
FURNACE - LV'S
HOUSE
2/19/2019 $4,896.99 2/21/19 - 50% Deposit Paid to Airpro
3/24/19 - Airpro Completed Installation
3/29/19 - RMC Electric Completed Electrical Hook Up
4/2/19 - Unit Working 100%
$4,898.98 4/5/19 - Balance to Airpro Complete
Awaiting Final Invoice from RMC Electric EmillERBEL
Invoice
Page 2
EFTA00811084
139 : _ START END EST.COST NOTES PHOTO STATUS
PURCHASE/INSTALL
AC SPLIT UNIT &
FURNACE - YELLOW
HOUSE
2/19/2019 $4,603.59 2/21/19 - 50% Deposit Paid to Airpro
3/15/19 - Airpro Completed Installation
3/25/19 - RMC Electric Completed Electrical Hook Up
3/29/19 - Unit Working 100%
$4,603.58 4/5/19 - Balance to Airpro Complete
Awaiting Final Invoice from RMC Electric Awaiting RMC
Invoice
140 - START :END
END EST.COST NOTES PHOTO STATUS
PURCHASE/INSTALL
X 6 UNIT HEATERS -
GARAGES RC -
2/19/2019 $8,841.43 2/21/19 - 50% Deposit Paid to Airpro
3/29/19 - All Units Installed - Running 100%
$8,841.42 4/5/19 - Balance to Airpro Complete
Project Total 1[71.6_82.85 Complete
Page 3
EFTA00811085
141 - Mitt I, START END EST.COST NOTES PHOTO STATUS
WINDOW
TREATMENTS.
COUNTERTOPS -
LODGE
3/15/2019 3./25/19 - Forwarded to JE & RK photos showing the condition of x Awaiting
Formica Counter Tops in Office & Bathrooms. For review to Response
replace with White Quartz $4,500.00 3125/19
3/25/19 - JE Approved Installation of White Quartz JE Approved
$3,000.00 "
3/27/19 - Primer/Painting of Ceilings Complete. "In House•• x
Bathrooms will be completed once Countertops Installed - 4/6/19
3/28/19 - Forwarded Estimate & Photos for Window Treatments Awaiting
Response
3/28/19
3/28/19 - JE Approved Window Treatments JE Approved
'3/28/19 - Prep & Priming of Walls Started. Due to Age of Structure
of Walls, Texture was Not Stable. Many patches required to Cover
Cracks Extra. House Incorporated have Patched, Skim Coated &
Lightly Textured all Walls, so all areas are the same.
$9,210.36 3/29/19 - Deposit for Window Treatments
.4/6/19 - White Quartz Countertops to be Installed
.4/9/19 - Painting to begin "In House"
142 - PHONE SYSTEM • START END EST.COST NOTES PHOTO STATUS
LODGE & LOG
Project Placed On Hold 1/10/18
Are we still to proceed with Verizon Cellular Phone Line for Lodge? Mint
Response
Are we still to proceed with Verizon Cellular Phone Line & Solar
Generator for Log Cabin?
Page 4
EFTA00811086
START END EST.COST NOTES PHOTO STATUS
CAMERAS -FRONT
GATES
$377.55 3/13/19 - Purchased Verizon Cellular Security Camera - 30 day trail
- $20.00 a month
3/14/19 - Camera Installed, at present linked to Brice, !Miceli
phone & I Pad. Working very well. Will forward update
3/22/19 - System is working out very well, no issues. Will purchase
another Camera to install on 2nd gate
$377.55 3/27/19 - Purchased Verizon Cellular Security Camera - 2nd Gate
3/28/19 - RMC Electric Installed Electrical Hook Up
3/29/19 - Camera Installed - Running 100%
4/1/19 - Awaiting RMC Electric Final Invoice Awaiting RMC
!mkt
44 - SEPTIC START END ST.COST NOTES PHOTO STATUS
SYSTEMS -RC
2/28/2019 4/4/19 - Gene Basset Pumped Out/Reviewed All Septic Tanks at X
RC. Reported Poor Flow to & from BH/Adobe Septic to Leaching
Fields. Poor Flow from Office to Septic Tank
The Office Line was Blocked by Tree Roots & the Abandoned Line
had not been Capped Correctly. New Clean Cuts have been
Installed - problem resolved
It appears Tree Roots have invaded Septic Lines from BH/Adobe,
Septic Tank to Leaching Field. It has been proposed to replace
BH/Adobe Septic Line &Septic Line to Leaching Field. This will
require some Trenching, CNME & RMC Electric will assist as New
Line will cross over Main Power Supply to RC
Gene Basset is working on complete proposal. ZM will assist with
Trenching & Pipe Laying. Will forward Proposal once in hand.
Tentative Schedule for Repairs - Mid May 2019
145 - GARAGE DOORS START END EST.COST NOTES PHOTO STATUS
- RC
.Will Review when JE On Site Pending
146- START ENO i EST.COST f NOTES PHOTO STSTUS
REFURBISHMENT
PICKET FENCES - RC
Repair & Painting of all Picket Fences - April 2019
$166.82 Purchased 100 Cedar Pickets - Curing in Garages
Page 5
EFTA00811087
I V - SITE WALLS & START END EST. COST NOTES PHOTO STATUS
MISC PLASTER
WORK MC
Expect Bid by 4/3/19 - Work would not start until late April/May
11.9 START END EST.COST NOTES PHOTO STATUS
REFURBISHMENT
OUTSIDE LOG CABIN
Logs Require Sanding, Cleaning, Water Sealing & Replacement of
Chinking. Will begin in the Spring
150 W1NDSHEILD - START END EST.COST NOTES PHOTO STATUS
2002 MERCEDES
2/13/2019 Contacted Gary Mann (RK Contact). He contacted Mercedes
reference Windshield Repair - Unable to come up with Solution.
Gary was to contact Guard Car Companies, have left a message
requesting update
3/22/19 - As of Date & Time No Solution on how to Repair
Windshield has been found. Will continue investigating
START END EST.COST NOTES PHOTO STATUS
REFURBISHMENT -
RUNS, FENCELINES &
GATES -RC
4/4/2019 4/4/19 - Removal of Old Gates on Runs at Stables Started x
COMPUTOR - James Ce forwarded History of Existing Library Computer, Feb 2015
LIBRARY - MH
How do you wish to proceed? Awaiting
Response
Page 6
ℹ️ Document Details
SHA-256
9c14bd2e96d014a01ea5e6f6045acfabee47263cb38898b9b6c0e8031775adc8
Bates Number
EFTA00811082
Dataset
DataSet-9
Document Type
document
Pages
6
Comments 0