📄 Extracted Text (202 words)
MEMO
6/15/01
TO: Ms. Maxwell
FROM:
Regarding: Frank Steele status report 6/13/01 and meeting minutes 6/14/01
I briefly spoke to Frank this morning however he is on vacation and did not have
access to his files. He will return Monday and I will receive further details.
1) LSJ BOAT DOCK Frank stated he was authorized to continue with the
planning and administration only. He was instructed to research permitting
for an additional 20' in length and adding an "L" 25 to 30' long.
I requested an itemized list of the items he has purchased on our behalf to begin
construction on the dock. He will complete this list next week.
2) 2) PB WINDOW REPAIR/REPLACEMENT Frank stated he
recommended that we repair the rotted window frames as opposed to
replacing them.
3) GARBAGE ENCLOSURE I asked Frank to confirm that the trash haulers
would collect the trash from the new enclosure prior to commencing with
construction. He will research and advise.
4) DRAINAGE The City of PB required provisions for surface drainage of the
staff house area. We are required to install a drain line from the structure to
the road which will require the disruption of sections of the driveway.
EFTA00577702
ℹ️ Document Details
SHA-256
f0d871ff7496b539ca28371ca669a3fa179cafe9cdead2f53dfdee791447bec7
Bates Number
EFTA00577702
Dataset
DataSet-9
Document Type
document
Pages
1
Comments 0