DataSet-9
EFTA00062276
6 pg
Timeline Analysis of Desktop Property # 0214 207268 HDD Image Z6E8M349.E01 (Device 1)
Important Identifiers:
User: Michael Thomas
Username: BOP19012
SID: S-1-5-21-1823249720-3210992811-1527010081-1102
SID: Microsoft Security Identifier
Date …
DataSet-9
EFTA00184168
5 pg
Post-NPA Timeline
9/24/2007 NPA signed
10/2007 Additional negotiations regarding selection of Special Master
10/2007 JD# I Notified regarding signing of NPA
10/2007 Investigation continues to try to identify addl victims. (As shown below,
investigation…
DataSet-9
EFTA00128376
1 pg
Documents Associated with Timeline Analysis of Desktop Property 4 0214 207268 HDD
Image Z6E8M349.E01 -- Michael Thomas (B0P19012)
Line 12, 13, 16:
8/10/2019 0:39:31 User saves/downloads document named "SHU 30 CHECK SHEET (CONDENSED)_1.docx…
DataSet-9
EFTA00164937
2 pg
From: ' (NY) (FBI)" "
To: " (NY) (FBI)"
DataSet-9
EFTA00577512
3 pg
…Rhode Island.
• Timeline meeting with Chuck ADD
• Atlas power equipment laoded aboard.
Tues 30th * Remove anchor plates & prepare surface for new S/S plates
• Cutting drain plumbing in new crew mess.
• Bow rails removed for new installation of 2" extrusion…
DataSet-10
EFTA01746749
1 pg
…2015 7:02:17 PM
Subject: Re: Tax timelines-update
2 below: RJ re-states that (a) gift tax will include grat calcs (all but one finalized) and (b) info provided by
melanie to torn which he believes is complete…
DataSet-9
EFTA00128264
3 pg
…if YES, provide contact
°Abandonment
information of person
who accessed the
evidence.)
°Yes ® o
Name:
E-Mail:
Phone:
TYPE OF EVIDENCE OR INFORMATION TO BE SEARCHED FOR/RECOVERED
Explanation of Case & Goals for the Examination:
…
DataSet-9
EFTA00267618
3 pg
…point of first contact.
USB Flash drive contained:
• Character Reference - Timeline incomplete
• Stage 1A.1 Medical Business Plan - File complete
• Stage I A.2 MSIC Development - File complete
• Stage 1B - Pattern of Targeting - Business Developments - File incomplete
• Stage IC - Fraudulent…
DataSet-11
EFTA02493749
2 pg
…3" crusher run base/1360 tons with trucking $90,712.
Asphalt was $512,500
New Total $645,698
Time line addition
5 additional days for swales
12/15 days for crusher run
Both swales/crusher 17/20 days on top…
DataSet-11
EFTA02586459
2 pg
…form of confirmation required and
evidence of confirmation -timeline of=funds borrowed on the bridge loan -clarification of $ amount on the bridge=loan
that needs to be paid off: is it the $ amount shown on the 7/25 balan=e sheet…
DataSet-10
EFTA01804595
2 pg
…3" crusher run base/1360 tons with trucking $90,712.
Asphalt was $512,500
New Total $645,698
Time line addition
5 additional days for swales
12/15 days for crusher run
Both swales/crusher 17/20 days on top…
DataSet-10
EFTA01415019
2 pg
…e) Please update the SOW narrative to include current information. The
timeline in the narrative stops at 2004.
f) The address on the paycheck is that of the company itself. Please
provide an independent address verification such as utility bill…
DataSet-9
EFTA00267553
3 pg
…point of first contact.
USB Flash drive contained:
• Character Reference - Timeline incomplete
• Stage 1A.1 Medical Business Plan - File complete
• Stage IA.2 MSIC Development - File complete
• Stage 1B - Pattern of Targeting - Business Developments - File
…
DataSet-9
EFTA00849153
2 pg
…run base/1360 tons with trucking $90,712.
> Asphalt was $512,500
> New Total $645,698
> Time line addition
> 5 additional days for swales
> 12/15 days for crusher run
> Both swales/crusher 17…
DataSet-9
EFTA00164742
3 pg
…Due to the massive quantity of
data, we foresee continuing to review as noted in the timeline.
Per an email response from SDNY AUSa dated 3/11/2025, (I provided the email in its entirety
to earlier today) portions of…
DataSet-9
EFTA00128404
3 pg
…Request to analyze desktops
computers used by guards for timeline and event analysis related to user
Case Background
activity around the time of the event.
Evidence linked from related LIMA Case #0384
Background Attachment(s) …
DataSet-11
EFTA02493912
2 pg
…run base/1360 tons with trucking $90,712.
> Asphalt was $512,500
> New Total $645,698
> Time line addition
> 5 additional days for swales
> 12/15 days for crusher run
> Both swales/crusher 17…
DataSet-11
EFTA02493868
2 pg
…3" crusher run base/1360 tons with trucking $90,712.
Asphalt was $512,500
New Total $645,698
Time line addition
5 additional days for swales
12/15 days for crusher run
Both swales/crusher 17/20 days on top…
DataSet-9
EFTA00267311
3 pg
…point of first contact
USB Flash drive contained:
• Character Reference - Timeline incomplete
• Stage IA.1 Medical Business Plan - File complete
• Stage 1A.2 MSIC Development - File complete
• Stage 18 - Pattern of Targeting - Business Developments - File incomplete
• Stage IC - Fraudulent Activity…
DataSet-10
EFTA01370464
1 pg
…e) Please update the SOW narrative to include current information. The timeline in the narrative
stops at 2004.
f) The address on the paycheck is that of the company itself. Please provide an independent address
verification such as utility bill…
Comments