& GSJ Construction Management Proposal
Client
Mr. Jeffrey Epstein
Contact
Richard Kahn
Project / Property_
Great St. James and Little St. James
Saint Thomas, USVI
Objective _
JPK is a full-service construction company, project managers, and design builders. PK
Development would love to bring our teams skills to your table. Our office has many skill sets.
• Jay Knoepfel - 30 years of local construction knowledge from concrete to finish carpentry.
• Raul Rodriguez - 30+ years of waste water, site drainage & general engineering.
• Yannick Rodriquez-Diaz - Architecture and project management.
• Lisa McCann - 28 years construction, including project management and interior design, focusing
on tile, granite, and finish elements.
• New team member-Kyle Reavis - Project, construction management and site superintendent.
I propose that Kyle Reavis be the dedicated site superintendent, supervising as your projects
require. I see Kyle coming to work on the island 8 hours per day as required to manage and perform as
instructed by Mr. Epstein. For his service, JPK would be paid $65 per hour. Yannick would support Kyle
primarily from JPK's office, on part time basis. JPK would bill $65 per hour for this service. If architectural
drawings are required JPK would bill $125 per hour for Yannick to create these. There would be no charge
for Jay to support these employees, except for site visits for projects unrelated to work JPK was directly
pg. 1
EFTA00804252
JPK DEVELOPMENT VIRGIN ISLANDS
RESIDENTIAL & COMMERCIAL CONSTRUCTION
04.
4 6501 RED HOOK PLAZA SUITE 201
fretoppAStil ST. THOMAS, V.1.00802
OFFICE_340.777-3100 I CELL_340.643.3245
doing. I would be responsible for the work being done and answerable to Mr. Epstein owners' rep or Mr.
Epstein himself.
When not needed on the island, Kyle would not be paid by you. Kyle being new to the islands, would
consult with and draw from the experience of our other PK members to lessen the learning curve. If a job
needs permitting, PK office can facilitate this. We have worked with most of the subcontractors on the
islands. JPK's rolodex as well as vendors and discounts will be at Kyle's fingertips. Kyle will be able to tap
into my extensive local knowledge to be efficient and successful.
JPK can make concrete, form, and pour.
JPK owns a spray foam truck.
JPK would create bid packages to be emailed to the owner's rep-Richard Kahn. JPK would insure
that the most competent subs are brought to the table. The owner or his rep would pick the
subcontractor and JPK would manage and schedule the work.
JPK's Outside Bidding LSJ pricing
Engineering - $225/hour Engineering -$125/hour
Architecture - $150/hour Architecture-$125/hour
Owner Consultation - $125/hour Owner Consultation -$125/hour
Project Management - $75/hour Project Management -$65/hour
Skilled Labor - $55/hour Skilled Labor -$55/hour
General Labor - $40/hour General Labor -$40/hour
20% Subcontractor Markup 10% Subcontractor Markup
15% Materials Markup 0% Materials Markup
pp,. 2
EFTA00804253
ℹ️ Document Details
SHA-256
46b2a0ce284a89765c50dead3ef29cc44990652ebeefbb5e8886350041b6dbc2
Bates Number
EFTA00804252
Dataset
DataSet-9
Document Type
document
Pages
2
Comments 0