KYLE PAY
Total Overbilled Home Billing Total
Hours Kyle @ $40 Jay@ $15 LSJE Travel @ 1.25 Saturday Hours JEE Kyle JPK
Billed per hour per hour Check per day $unday Overbilled Qat Extra Pay Profit
8/5/18 54 2,160 810 2,970 7.5 0 7.5 413 300 113
8/12/18 56 2,240 840 3,080 6.25 4 10.25 564 410 154
8/19/18 56 2,240 840 3,080 6.25 3 9.25 509 370 139
8/26/18 60 2,400 900 3,300 7.5 0 7.5 413 300 113
9/2/18 48 1,920 720 2,640 6.25 0 6.25 344 250 94
9/9/18 46 1,840 690 2,530 5 3 8 440 320 120
9/16/18 46 1,840 690 2,530 6.25 2 8.25 454 330 124
9/23/18 54 2,160 810 2,970 6.25 2 8.25 454 330 124
9/30/18 54 2,160 810 2,970 6.25 2 8.25 454 330 124
10/7/18 55 2,200 825 3,025 7.5 0 7.5 413 300 113
10/14/18 52 2,080 780 2,860 6.25 2 8.25 454 330 124
10/21/18 60 2,400 900 3,300 8.75 0 8.75 481 350 131
10/28/18 61 2,440 915 3,355 7.5 2 9.5 523 380 143
11/4/18 51 2,040 765 2,805 6.25 0 6.25 344 250 94
11/11/18 57 2,280 855 3,135 8.75 0 8.75 481 350 131
11/18/18 61 2,440 915 3,355 7.5 2 9.5 523 380 143
11/25/18 38 1,520 570 2,090 3.75 2 5.75 316 230 86
12/2/18 - - - 0 - - -
12/9/18 - - - 0 - - -
12/16/18 - - - 0 - - -
12/23/18 - - - 0 - - -
12/30/18 - - - 0 - - -
TOTALS 36,360 13,635 49,995 114 24 138 7,576 5,510 2,066
GSJ COTTAGE
10/3/18 Inv ft 1 Deposit -40% 66,660.74
11/2/18 Inv ft 2 24,636.87
Paid to date 91,297.61
Balance to finish 88,919.26
Total Job cost per invoice 166,651.87
Add: Impact windows and doors 13,565.00
Revised Total Cost 180,216.87
ROOFS - LIBRARY & MASTER
5/30/18 Deposit 150,000
Original bid for metal roofs 250,000.00
Revised bid for tile roofs 293,378.00
Per Jay all materials are on LSJ to begin job
Estimated time to complete both 6.8 weeks
FLAGPOLE POOL
10/15/18 Bid to demo and level floor 4,720.00 paid
CHILLAX
11/30/18 Plaster and finish 2 openings 960.00 open
GYM
12/3-12/7 Install 2 windows and 3 sliders 3,040.00 open
EFTA00804250
CABANAS 1 & 2
10/3/18 Inv #1 Deposit -40% 22,081.89
11/2/18 Inv it 2 11,040.94
Paid to date 33,122.83
Balance to finish 48,149.64
Total Job cost per invoice 55,204.72 (note original scope of work was only Cabanas 1&2)
Add: Change order for Cabanas 1-4 26,067.75 open
Revised Total Cost 81,272.47
MAIN COMPOUND TILE WORK
10/1-10/7 76 Hours Jackie and Brian @ 55 per hour 4,180.00 paid
10/8-10/14 103 HoursJackieand Brian @ 55 per hour 6,789.47 paid
(includes 1,124 of materials)
10/15 -10/21& 10/22 -10/28
Invoice 110941 Amount 18,099.98
Less: billing or Erik @ 65 never on site (520.00)
Less:Self Leveling Material only used on flagpole job (505.34)
Less: Materials markup I (89.08)
Less: Project Management fee (1,547.00)
Revised amount 15,438.56 open
10/29-11/4 Invoice110945 Amount 10,083.65
Less: Materials markup (23.95)
Less: Project Management fee (900.00)
Revised amount 9,159.70 open
Total Billed 39,153.10
Less: revisions (3,585.37)
Revised Billed 35,567.73
Paid to datel (10,969.47)
Balance owed 24,598.26
12/3-12/14 4 men @ 175 per hour to completework with labor not to exceed 14,000
and materials not to exceed 2,500
EIFS
12/3-12/14 Kitchen 12,125.00
Cabanas 1-4 8,400.00
Total EIFS 20,525.00
EFTA00804251
ℹ️ Document Details
SHA-256
fb4db095b3a3c86e0ff2f31db01cff26fd15517bad8a6c5a29bf980a675e2b93
Bates Number
EFTA00804250
Dataset
DataSet-9
Document Type
document
Pages
2
Comments 0