EFTA01109771.pdf
📄 Extracted Text (124 words)
New Engineering Building Pad
Material Outside Vendor Labor Shipping Trucking Tax
Temp Enclosure/safety
Material Handling
Equipment Rental 1500
Misc Expenses 1000
Layout/Survey
Earthwork and Demo 1300 2000
Site Drawings
Pest Control
Site Dranage 1000
Pipes/Utilities 500
Concrete 9350 500 9500 2500
Vapor Barrier 200
Ties/Accessories/bolts 1500
Rebar 1400
Saw Cutting 250
Curing/Protection 300
Fine Grade 1000
Wood/Formwork 1200 5000
Fastners 400
Sub Totals 18100 3300 14500 4500
Total 40400
Note: Labor # is for outside labor only/ finish concrete crew
Note: Rebar is for additional rebar
Note; This is a basic pad
No Utilities, septic sysyem, electrical, wall, or engineering yard work
The pad will have 3 gray water drains. The pad will not have sanitary drains
Includes min work on electrical vault
EFTA01109771
ℹ️ Document Details
SHA-256
8c9171c5b96e2c104b3e6ab325501674af5aa45b4897f67d046ee387bacf97bb
Bates Number
EFTA01109771
Dataset
DataSet-9
Document Type
document
Pages
1
Comments 0