Found 1,000+ results for “71st” in 102ms

EFTA00287040.pdf PDF

DataSet-9 EFTA00287040 3 pg

71st Street TO DO List 6th FLOOR -Retouch paint wall facing and side of commode. -Rubber-door leading to terrace worn out. 5th FLOOR -Re-grouting of tiles in both bathrooms -Wood in the niche of window near your office…

EFTA00584602.pdf PDF

DataSet-9 EFTA00584602 1 pg

9East 71st street Daily Report • Elevator Inspection ,The NYC Department of Buildings performed a Elevator inspection on the main passenger car, service lift, and dumb waiter .Inspector check on top of elevator cabs, inside elevator equipment rooms sc-level, roof…

EFTA00520953.pdf PDF

DataSet-9 EFTA00520953 1 pg

a rtedona. 9 E 71st St New York, NY 10021 U.S.A. Order confirmation Order: BE49774 06 November 2012 Item …

EFTA00286954.pdf PDF

DataSet-9 EFTA00286954 1 pg

NESILLC 9 East 71st Street, New York. NY, 10021 Telephone: Fax: 6-05-13 Mr. Ashraf Omran City of New York, Department of Buildings Division of Cranes and Derricks 280 Broadway New York, NY 10007 RE: Crane placement at 9East…

EFTA00287129.pdf PDF

DataSet-9 EFTA00287129 5 pg

9 East 71st To List updated 04/12/12 6th floor & Roof ■ Kitchen replaces aerator on sink faucet. RB, will repair work completed ■ Movie room — Sony projector not operational need theater /audio company to check to see if…

EFTA00585865.pdf PDF

DataSet-9 EFTA00585865 4 pg

9 East 71st To List updated 05/30/12 6th floor & Room ■ Movie room — Sony projector not operational need theater /audio company to check to see if it can be repaired. New proposal 5/24 sent to Rich Kahn…

EFTA00588911.pdf PDF

DataSet-9 EFTA00588911 5 pg

9 East 71st To List updated 05/08/12 6th floor & Roof ■ Kitchen replaces aerator on sink faucet. RB, will repair work completed ■ Movie room — Sony projector not operational need theater /audio company to check to see if…

EFTA00287140.pdf PDF

DataSet-9 EFTA00287140 4 pg

9 East 71st To List updated 05/30/12 6th floor & Room ■ Movie room — Sony projector not operational need theater /audio company to check to see if it can be repaired. New proposal 5/24 sent to Rich Kahn…

EFTA00588818.pdf PDF

DataSet-9 EFTA00588818 5 pg

9 East 71st To List updated 03/08/12 6th floor & Roof ■ Kitchen replaces aerator on sink faucet. RB, will repair week of 3/12 ■ Movie room — Sony projector not operational need theater /audio company to check to…

EFTA01083718.pdf PDF

DataSet-9 EFTA01083718 5 pg

9 East 71st To List updated 05/08/12 6th floor & Roof ■ Kitchen replaces aerator on sink faucet. RB, will repair work completed ■ Movie room — Sony projector not operational need theater /audio company to check to see if…

EFTA00287124.pdf PDF

DataSet-9 EFTA00287124 5 pg

9 East 71st To List updated 04/18/12 6th floor & Roof ■ Kitchen replaces aerator on sink faucet. RB, will repair work completed ■ Movie room — Sony projector not operational need theater /audio company to check to see if…

EFTA00522990.pdf PDF

DataSet-9 EFTA00522990 1 pg

NYC List 71st and 715t Need to have new table cloths made. Need to source fabric JE approves of. Need to source new idea for entry stair material. (Zuber fake leather peels on the edges of the stairs.) Need to…

EFTA00577705.pdf PDF

DataSet-9 EFTA00577705 1 pg

GM REPORT 71ST 1. Remco require 4 days to re polish the marble floor and I am waiting for you to tell me when that would be best 2. You need to decide what material you would like to redo…

EFTA00584251.pdf PDF

DataSet-9 EFTA00584251 1 pg

9 East 71st street daily report 6/11/13 • Picture light for front hall arrived at 71,, street waiting for approval to proceed with ostroff electrical installation. • Working on the removal of the old ABB 1" floor Kitchen exhaust fan…

EFTA01177111.pdf PDF

DataSet-9 EFTA01177111 6 pg

9 East 71st To List updated 05/08/12 6th floor & Roof ■ Kitchen replaces aerator on sink faucet. RB, will repair work completed ■ Movie room — Sony projector not operational need theater /audio company to check to see if…

EFTA00585861.pdf PDF

DataSet-9 EFTA00585861 4 pg

9 East 71st To List updated 05/30/12 6th floor & Room ■ Movie room — Sony projector not operational need theater /audio company to check to see if it can be repaired. New proposal 5/24 sent to Rich Kahn…

EFTA01115113.pdf PDF

DataSet-9 EFTA01115113 1 pg

Nine East 71st Corporation Pricing as of April 25, 2011 Annual Usage kWH: 857,892 Hess Energy Fixed Pricing Total Cost Annual Annual cost with Start End Price Capacity Congestion per kWH Kwh Hess Energy May-11 May-12 0…

EFTA01083708.pdf PDF

DataSet-9 EFTA01083708 5 pg

9 East 71st To List updated 03/08/12 6th floor & Roof ■ Kitchen replaces aerator on sink faucet. RB, will repair week of 3/12 ■ Movie room — Sony projector not operational need theater /audio company to check to…

EFTA00584284.pdf PDF

DataSet-9 EFTA00584284 4 pg

9 East 71st street daily report 6/10/13 • Master Bedroom ac unit review of blue print duct lay out, contacted A.D Winston to help with a solution to increase air flow in master bedroom after the air balance…

👁 0 💬 0

Comments

Loading comments…
Link copied!